ASTM F2773-2013 Standard Practice for Transfilling Compressed Air or Nitrogen and Safe Handling of Small Paintball Cylinders《压缩空气或氮气转储和小型彩弹球汽筒安全处理方法的标准实施规程》.pdf

上传人:王申宇 文档编号:539437 上传时间:2018-12-07 格式:PDF 页数:4 大小:111.12KB
下载 相关 举报
ASTM F2773-2013 Standard Practice for Transfilling Compressed Air or Nitrogen and Safe Handling of Small Paintball Cylinders《压缩空气或氮气转储和小型彩弹球汽筒安全处理方法的标准实施规程》.pdf_第1页
第1页 / 共4页
ASTM F2773-2013 Standard Practice for Transfilling Compressed Air or Nitrogen and Safe Handling of Small Paintball Cylinders《压缩空气或氮气转储和小型彩弹球汽筒安全处理方法的标准实施规程》.pdf_第2页
第2页 / 共4页
ASTM F2773-2013 Standard Practice for Transfilling Compressed Air or Nitrogen and Safe Handling of Small Paintball Cylinders《压缩空气或氮气转储和小型彩弹球汽筒安全处理方法的标准实施规程》.pdf_第3页
第3页 / 共4页
ASTM F2773-2013 Standard Practice for Transfilling Compressed Air or Nitrogen and Safe Handling of Small Paintball Cylinders《压缩空气或氮气转储和小型彩弹球汽筒安全处理方法的标准实施规程》.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: F2773 13 An American National StandardStandard Practice forTransfilling Compressed Air or Nitrogen and Safe Handlingof Small Paintball Cylinders1This standard is issued under the fixed designation F2773; the number immediately following the designation indicates the year oforiginal adop

2、tion or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.INTRODUCTIONThis standard is intended to provide basic procedures for the safe handl

3、ing and transfilling of small(not bulk) paintball compressed air cylinders commonly used with a paintball marker for propulsionof a paintball.This practice is written within the current state-of-the-art of transfilling compressed gas technology.The intent is to revise this specification whenever sub

4、stantive information becomes available whichjustifies revising existing requirements or adding new requirements.1. Scope1.1 This practice is intended to satisfy the demand forinformation on the basic procedures for the safe handling andtransfilling of small (not bulk) paintball compressed air cylin-

5、ders commonly used with a paintball marker for propulsion ofa paintball. This standard does not address issues dealing withthe transfilling, storage, and handling of supply cylinders thatmay be used in transfilling smaller cylinders.1.2 The compressed air fill procedures are written for thepressure

6、cylinder transfilling method most commonly used bypaintball field or store operators, or both.1.3 This document should not be confused with federal,state, provincial, or municipal specifications or regulations;insurance requirements; or national safety codes.1.4 The values stated in inch-pound units

7、 are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.5 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibil

8、ity of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations, such as and not limited to DOT,CGA, and OSHA, prior to use.2. Referenced Documents2.1 ASTM Standards:2F1979 Specification for Paintballs Used in the Spor

9、t ofPaintballF2030 Specification for Paintball Cylinder Burst Disk As-sembliesF2272 Specification for Paintball Markers2.2 CGA Standards:3CGA C-6.1 Standards for visual inspection of high pressurealuminum compressed gas cylindersCGA C-6.2 Guidelines for visual inspection and requalifica-tion of fibe

10、r reinforced high pressure cylinders2.3 Federal Standards:4CFR 49 Parts 100 to 1853. Terminology3.1 Definitions:3.1.1 blow-down valve, nvalve which is part of a fillstation assembly, and which is intended to vent gas from thepaintball cylinder being filled.3.1.2 fill station, ndevice designed to att

11、ach to a supplycylinder and to a paintball cylinder which facilitates transfillingthe paintball cylinder.1This practice is under the jurisdiction of ASTM Committee F08 on SportsEquipment, Playing Surfaces, and Facilities and is the direct responsibility ofSubcommittee F08.24 on Paintball and Equipme

12、nt.Current edition approved Dec. 1, 2013. Published January 2014. Originallyapproved in 2009. Last previous edition approved in 2011 as F2773 11. DOI:10.1520/F2773-13.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual

13、Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from Compressed Gas Association (CGA), 4221 Walney Rd., 5thFloor, Chantilly, VA 20151-2923, http:/.Available from4Available from U.S. Government Printing Office Superintendent of Docu

14、ments,732 N. Capitol St., NW, Mail Stop: SDE, Washington, DC 20401, http:/www.access.gpo.gov.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States13.1.3 paintball, nspherical ball, commonly with a diam-eter of 0.68 in. (17.3 mm), comprised

15、of a shell and a fill,conforming to Specification F1979 and designed to be expelledfrom a paintball marker conforming to Specification F2272.4. General Considerations4.1 Persons, who are transfilling compressed air, should betrained in the hazards associated with compressed air ornitrogen, or both.4

16、.2 Always wear eye protection while filling cylinders.4.3 Always have any required MSDS at the location that thefilling takes place.4.4 Always read and understand all fill station instructions.4.5 Ensure that there is proper ventilation in the filling area.4.6 The receiving cylinder (paintball cylin

17、der) must be of arefillable type (that is, not disposable) and pressure rating thatit can safely hold stamped or marked on the cylinder.4.7 Supply cylinders must be secured and supported, suchas fastened to a wall or similar immovable structure (that is, notfree standing).5. Fill Stations5.1 Fill st

18、ations and related equipment should be rated thesame as the supply tank.5.2 Fill stations should be used for the purpose of transfill-ing compressed air or nitrogen, or both, for the paintballindustry only.5.3 Fill stations shall be supplied with instructions by themanufacturer or distributor of the

19、 product.5.4 Fill stations should be marked or tagged with safetywarnings.5.4.1 Read owners manual before using.5.4.2 Use only with compressed air or nitrogen.5.4.3 Do not use for oxygen.5.4.4 Close bulk tank valve when not in use.5.4.5 Vent down system.5.4.6 Never add or introduce oil to the fill s

20、tation, cylinder,or regulator/valve.6. Cylinder Inspection6.1 Ensure that the regulator is properly attached to thecylinder.6.2 Ensure that the regulator is in good, serviceable condi-tion.6.2.1 Ensure that the proper cylinder safety burst disk isinstalled correctly.6.3 Visually inspect the cylinder

21、 condition before each fill.6.3.1 Cylinders must be stamped or labeled with a DOT(Department of Transportation) or potentially TC (TransportCanada) mark working pressure, manufacturers code or name,serial number, and hydrostatic test date.6.3.1.1 An example of an aluminum cylinder shoulderstamping:6

22、.3.1.2 DOT 3AL 3000 M4625 0403 A051391The cylinder neck layline translates as follows:DOT Department of Transportation (a Federal Agency)3AL The specification standard the cylinder conforms to3000 The working pressure rating of the cylinderM4625 The manufacturers name or number of the cylinder0403 T

23、he hydrostatic test date of the cylinder.The first two digits are the month.The is the testing agency mark.The last two digits are the year.The above date would be valid to use until April 1,2008.A051391 The serial number of the tank.NOTE 1Re-qualification period for cylinders is typically five (5)

24、yearsfor 3 AL aluminum cylinders.(1) An example of a composite wrapped tank label:The label translates as follows:68cu Cylinder size in cubic inchesTC-3FCM-207 Transport Canada approvalDOT Department of TransportationE9634 Exemption number3000 Cylinder working pressureDK 117512 The serial number of

25、the tankLUXFER Cylinder manufacturer5 07 The hydrostatic test date of the cylinderThe first two digits are the monthThe is the testing agency markThe last two digits are the yearThe above date would be valid to use untilMay 1, 2010(2) After hydrostatic testing, the retest date will look likethis:Lab

26、el attached to bottle with epoxyG712 7 7 07The first two digits are the monthF2773 132The G7 is the re-testing agency RIN (Re-testers identification number)77The RIN number is read in a clock wise direction, G777Contact D.O.T. for RIN informationThe last two digits are the yearThe above date would b

27、e valid to use until December 1, 2010(3) Another example:The cylinder label translates as follows:DOT Department of Transportation (a Federal Agency)SP14387 The exemption standard the cylinder conforms to4500 The working pressure rating of the cylinderGC9468S1-D2 D2 manufacturers part numberW102614

28、Cylinders serial numberM4625 The manufacturers name or numberREE The rejection elastic expansion number used for hydrostatic testing01 08 The hydrostatic test date of the cylinderThe first two digits are the monthThe is the testing agency markThe last two digits are the yearThe above date would be v

29、alid to use until January 1, 20136.3.1.3 Table 1 lists some examples of exemption (E) orspecial permit (SP) numbers. Always refer to DOT for currentinformation.56.3.2 The pressure rating on the label or stamped on thecylinder must be at least 3000 psi or higher.6.3.3 Cylinders should be in good cond

30、ition, that is, free ofstickers, paint, anodizing, dents, scrapes, or gouges.6.3.4 Cylinders should not be buffed or polished.6.3.5 Burst disk assemblies will meet the requirements ofSpecification F2030.6.3.5.1 Cylinders having regulator valves without a burstdisk or pressure relief mechanism instal

31、led must not be filled(see Fig. 1).6.3.5.2 The pressure relief or burst disk assembly should betight and visible pressure relief passages should be clear ofobstructions. See Fig. 2.6.3.5.3 All regulator valves must have the correct burst disk(see Table 2), as required by DOT part 49 CFR.6.3.6 The re

32、gulator valve and external threading must not bedamaged and must be free of foreign material. Damagedregulators or components must be cleaned or repaired by themanufacturer or its authorized representative prior to filling thecylinder.6.4 Cylinders must NOT be filled if any one of the follow-ing con

33、ditions exists:6.4.1 Cylinders are outside the valid test date range. Alwaysconfirm re-qualification period through DOT.6.4.2 Presence of water or other liquids in the cylinder.6.4.3 Evidence of internal contamination such as rust orother particles.6.4.4 External corrosion exceeding 0.032 in. (0.8 m

34、m) indepth or 25 % of surface area.6.4.5 Dents in aluminum bottles that exceed 0.062 in. (1.6mm) with a diameter less than 2 in. (50.8 mm).6.4.6 Scrapes or gouges that decrease the wall thickness ofa cylinder by an appreciable amount.6.4.7 Visible bulges.6.4.8 Cylinders show evidence of polishing, b

35、uffing,welding, grinding, sandblasting, plating, or exposure to hightemperature over 350F/177C.5Exemption or Special permit number may also be referenced at the followinglink: http:/hazmat.dot.gov/sp_app/special_permits/spec_perm_index.htm.TABLE 1 Examples of DOT Exemption (E) and Special Permit Num

36、bersExemption # Manufacturer Retest Due EveryE-07277 SCI 3 Years from manufacturing date or last retest.E-09634 LUXFER 3 Years from manufacturing date or last retest.E-10915 LUXFER Manufactured or last retest before May 2001. 3 years. Manufactured or last retest June 2001. 5years.E-10945 SCI Manufac

37、tured or last retest before July 2001. 3 years. Manufactured or last retest tested August2001. 5 years.E-11005 Carleton Tech Test every 3 years.E-11194 Carleton Tech Manufactured or last re-test before July 1, 2001. 3 years. Manufactured or last re-test tested August2001. 5 year cycle.E-12479 LUXFER

38、 3 years.E-12695 Global CompositesInternationalDO NOT USE. D.O.T. HAS SUSPENDED THIS EXEMPTION NUMBER. Contact GCI forinstructions.FIG. 1 Arrow Indicates One Common Style of the Multiple BurstDisk Assemblies that May Be Present on a Regulator ValveF2773 1336.4.9 Delaminating of composite cylinders.6

39、.4.10 Any damage that exposes any fibers on a compositecylinder.6.4.11 Any other conditions that seem unsafe to use shouldnot be filled and should be inspected by a certified DOTre-tester.7. Compressed Air/Nitrogen Fill Procedures7.1 The safety relief device, cylinder wall, and regulator ofall cylin

40、ders to be transfilled must be inspected as described inSection 6. If a condition not described in Section 6 is found andis of concern of the person transfilling the cylinder, the cylindermust not be filled.7.2 The pressure rating stamped or labeled on the cylindermust meet or exceed the intended fi

41、ll pressure.7.3 The female quick disconnect must be inspected forproper pressure rating and for wear on the retaining ballbearings. The male fill valve must also be inspected forburnelling on the retaining ring area. Any type of hosing ortransfer line must also be inspected for proper pressure ratin

42、g.7.4 Attach the fill station to the supply cylinder. Ensure thatthe proper CGA fittings are used and installed correctly.7.5 Attach the paintball cylinder to the fill station using themale fill valve only. Ensure that the female quick disconnect isfully seated and closed.7.6 Holding onto the bottle

43、 or hose, or both, slowly open thesupply valve and fill the cylinder to the designated fill pressure.Check the output gauge on the fill station to ensure no overpressurization has occurred. Vent immediately if cylinder hasbeen over pressurized.7.6.1 The fill rate should be conducted at a speed thatm

44、inimizes heat build up. Care must be taken to fill the cylinderat a rate so the cylinder temperature does not become too hotto hold in your bare hands, 140F/49C.7.7 Close the supply valve, and open the blow-down valveto relieve the pressure in the transfer line. If the system isleaking through the v

45、enting valve, do not remove the cylinderuntil all air has stopped.7.7.1 If the system leaks through the blow-down valve thenthe fill valve assembly on the system needs to be serviced bythe manufacturer or its authorized representative. Do not addoil to the system.7.8 Remove the cylinder from the fil

46、l station. If the femalequick disconnect slide does not move easily, this may indicatethat pressure is still present in the system. Do not remove withpressure still in fill system.7.9 Turn off the supply tank, safely vent down the fill stationand if possible, remove or secure any hoses.8. Keywords8.

47、1 aluminum; burst disk, carbon fiber; composite; com-pressed gas; cylinder; paintball; pressure vessel; transfillingASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentionedin this standard. Users of this standard are expressly a

48、dvised that determination of the validity of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years andif not revised, eith

49、er reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the address shown below.This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C7

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1