BS PD CLC TR 50126-3-2008 Railway applications —The specification and ndemonstration of Reliability Availability nMaintainability and Safety (RAMS) — nPart 3 Guide to the applicati.pdf

上传人:花仙子 文档编号:588846 上传时间:2018-12-15 格式:PDF 页数:66 大小:772.82KB
下载 相关 举报
BS PD CLC TR 50126-3-2008 Railway applications —The specification and ndemonstration of Reliability Availability nMaintainability and Safety (RAMS) — nPart 3 Guide to the applicati.pdf_第1页
第1页 / 共66页
BS PD CLC TR 50126-3-2008 Railway applications —The specification and ndemonstration of Reliability Availability nMaintainability and Safety (RAMS) — nPart 3 Guide to the applicati.pdf_第2页
第2页 / 共66页
BS PD CLC TR 50126-3-2008 Railway applications —The specification and ndemonstration of Reliability Availability nMaintainability and Safety (RAMS) — nPart 3 Guide to the applicati.pdf_第3页
第3页 / 共66页
BS PD CLC TR 50126-3-2008 Railway applications —The specification and ndemonstration of Reliability Availability nMaintainability and Safety (RAMS) — nPart 3 Guide to the applicati.pdf_第4页
第4页 / 共66页
BS PD CLC TR 50126-3-2008 Railway applications —The specification and ndemonstration of Reliability Availability nMaintainability and Safety (RAMS) — nPart 3 Guide to the applicati.pdf_第5页
第5页 / 共66页
点击查看更多>>
资源描述

1、PUBLISHED DOCUMENTPD CLC/TR 50126-3:2008Railway applications The specification and demonstration of Reliability, Availability, Maintainability and Safety (RAMS) Part 3: Guide to the application of EN 50126-1 for rolling stock RAMICS 29.280; 45.020g49g50g3g38g50g51g60g44g49g42g3g58g44g55g43g50g56g55g

2、3g37g54g44g3g51g40g53g48g44g54g54g44g50g49g3g40g59g38g40g51g55g3g36g54g3g51g40g53g48g44g55g55g40g39g3g37g60g3g38g50g51g60g53g44g42g43g55g3g47g36g58PD CLC/TR 50126-3:2008This Published Document was published under the authority of the Standards Policy and Strategy Committee on 30 September 2008 BSI 2

3、008ISBN 978 0 580 61845 1National forewordThis Published Document is the UK implementation of CLC/TR 50126-3:2008. It supersedes PD CLC/TR 50126-3:2006 which is withdrawn. The UK participation in its preparation was entrusted by Technical Committee GEL/9, Railway electrotechnical applications, to Su

4、bcommittee GEL/9/2, Rolling stock.A list of organizations represented on this committee can be obtained on request to its secretary.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application.Amendments/corrigenda issued

5、since publicationDate CommentsTECHNICAL REPORT CLC/TR 50126-3 RAPPORT TECHNIQUE TECHNISCHER BERICHT July 2008 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Central Secretariat: rue de S

6、tassart 35, B - 1050 Brussels 2008 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. CLC/TR 50126-3:2008 E ICS 29.280; 45.020 Supersedes CLC/TR 50126-3:2006English version Railway applications The specification and demonstration of Rel

7、iability, Availability, Maintainability and Safety (RAMS) Part 3: Guide to the application of EN 50126-1 for rolling stock RAM Applications ferroviaires Spcification et dmonstration de la Fiabilit, de la Disponibilit, de la Maintenabilit et de la Scurit (FDMS) Partie 3: Guide pour lapplication de la

8、 EN 50126-1 la fiabilit, la disponibilit, la maintenabilit et la scurit du matriel roulant Bahnanwendungen Spezifikation und Nachweis der Zuverlssigkeit, Verfgbarkeit, Instandhaltbarkeit, Sicherheit (RAMS) Teil 3: Leitfaden zur Anwendung der EN 50126-1 fr Bahnfahrzeuge RAM This Technical Report was

9、approved by CENELEC on 2008-05-09. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Cyprus, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norw

10、ay, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and the United Kingdom. Foreword This Technical Report was prepared by Working Group B11 of SC 9XB, Electromechanical material on board of rolling stock, of Technical Committee CENELEC TC 9X, Electrical and electronic appl

11、ications for railways. The text of the draft was submitted to the vote and was approved by CENELEC as CLC/TR 50126-3 on 2008-05-09. This Technical Report supersedes CLC/TR 50126-3:2006. This Technical Report forms an informative part of EN 50126 and contains guidelines for the application of EN 5012

12、6-1 to Rolling Stock RAM. _ 2 CLC/TR 50126-3:2008Contents Page Introduction 6 1 Scope . 7 2 Definitions 7 3 Approach adopted for the Guide 8 3.1 General 8 3.2 Entities Involved In the Life Cycle Phases of Rolling Stock 8 4 Application of this Guide 8 4.1 Object of the application 8 4.2 Application o

13、f EN 50126-1 9 4.2.1 Assessment of the application of EN 50126-1 9 4.2.2 Mandatory requirements for the application of EN 50126-1 . 9 5 Specifying RAM requirements . 10 5.1 Introduction . 10 5.2 Preliminary RAM analysis . 10 5.2.1 General . 10 5.2.2 Preliminary RAM Analysis activities 10 5.2.2.1 Gen

14、eral 10 5.2.2.2 System Identification . 11 5.2.2.3 Breakdown structure and boundary limits 12 5.2.2.4 Failure Conditions . 14 5.3 RAM requirements 16 5.3.1 Introduction . 16 5.3.2 Reliability Targets . 16 5.3.3 Maintainability Targets 18 5.3.3.1 Generic Qualitative Requirements for Maintainability 1

15、8 5.3.3.2 Preventive/Corrective Maintenance Requirements . 20 5.3.3.3 Logistic Support Requirements . 20 5.3.3.4 Maintenance Cost Requirements 21 5.3.4 Availability Targets 21 5.4 Process for choosing RAM figures 24 5.5 RAM Programme 24 5.5.1 Introduction . 24 5.5.2 Configuration Management System .

16、 25 5.5.3 RAM Programme Outline 25 5.5.4 Example of RAM Analyses Document Template and Data 26 5.5.4.1 Introduction 26 5.5.4.2 Common Data for the analyses 26 5.5.4.3 Reliability Prediction Analysis Template and Data Sheets . 27 5.5.4.4 Maintenance Attributes (Maintenance Levels, Skill Level and LRU

17、 definition) 29 5.5.4.5 Preventive Maintenance Analysis Template and Data Sheets 31 5.5.4.6 Corrective Maintenance Analysis Template and Data Sheets 35 5.5.4.7 Failure Mode Effects and Criticality Analysis Template and Data Sheets 37 3 CLC/TR 50126-3:20086 RAM Assurance during Life Cycle . 40 6.1 RA

18、M Programme and Phases of the Life Cycle . 40 6.1.1 Introduction . 40 6.1.2 Tender Phase . 41 6.1.3 Design Phase 42 6.1.4 Demonstration Phase . 44 6.1.4.1 Introduction 44 6.1.4.2 RAM Acceptance Criteria . 45 6.1.4.3 In service checking Period . 45 6.1.4.4 Data Report from field and its organisation

19、46 7 RAM Parameters to be incorporated into LCC Model . 47 7.1 Introduction . 47 7.2 Overview of LCC Modelling 47 7.3 RAM parameters for LCC 48 Annex A Examples of breakdown structure . 49 Bibliography . 62 Figures Figure 1 Example of Reliability Prediction Analysis Sheet . 28 Figure 2 Example of Pr

20、eventive Maintenance Analysis Sheet 32 Figure 3 Example of Preventive Maintenance Sheet for a single frequency . 34 Figure 4 Example of Corrective Maintenance Analysis Sheet . 36 Figure 5 Example of items FMECA Sheet 38 Figure 6 Example of functions FMECA Sheet 39 Figure 7 RAM Programme and Life Cyc

21、le Phases 40 Figure 8 Possible relationships between Customer, Main Supplier, Sub-Supplier during some phases of Life Cycle for rolling stock . 41 Figure 9 Flow diagram representing activities/documentations of Design Phase 42 Figure A.1 Example of physical structure using organisation chart for an

22、Electrical Multiple Unit Coach 50 Figure A.2 Example of functional structure using organisation chart for an Electrical Multiple Unit Coach 51 Figure A.3 Example of structure using the tree breakdown chart for an EMU (Electrical Multiple Unit) Traction Vehicle . 58 Figure A.4 Example of structure us

23、ing the tree breakdown chart for an EMU (Electrical Multiple Unit) Coach 61 4 CLC/TR 50126-3:2008Tables Table 1 Possible sharing of responsibility 8 Table 2 Example of minimum set of data of the header for a form representing a breakdown structure . 13 Table 3 Example of minimum set of data represen

24、ting a breakdown structure . 14 Table 4 RAM Failure Categories 14 Table 5 Significant Failure Specification 15 Table 6 Major Failure Specification 16 Table 7 Minor Failure Specification 16 Table 8 Reliability Requirements for Failure Categories 17 Table 9 Qualitative Requirements for Maintainability

25、 . 18 Table 10 Preventive/Corrective Maintenance Requirements . 20 Table 11 Logistic Support Requirements . 20 Table 12 Maintenance Cost Requirements 21 Table 13 Availability Requirements 23 Table 14 Example of minimum set of data of the header for RAM analyses Template . 27 Table 15 Example of mini

26、mum set of data for Reliability Prediction sheets 27 Table 16 Example of minimum set of data for Preventive Maintenance sheets 31 Table 17 Example of minimum set of data for Corrective Maintenance sheets . 35 Table 18 Example of minimum set of data for items FMECA sheets . 37 Table 19 Description of

27、 the main tasks of Design Phase . 43 5 CLC/TR 50126-3:2008Introduction EN 50126-1 is likely to enhance the general understanding of the issues involved in achieving RAMS characteristics within the railway field. It defines a comprehensive set of tasks for the different phases of a generic life cycle

28、 for a total rail system. Although some of the examples given in the annexes of EN 50126-1 are for rolling stock, the standard is essentially aimed as a top level railway system document. RAMS characteristics for rolling stock (i.e. its long term operating behaviour performance), as for any other sy

29、stem, forms an important part of its overall performance characteristics. But the consideration of RAMS, in contractual terms, between a customer / operator and a Main Supplier for the procurement of rolling stock has been problematic. Also, in rolling stock contracts, there is now a greater emphasi

30、s on the impact on end customers of service failures and on the economic and risk considerations of RAMS (i.e. the business perspective). Consequently, Life Cycle Cost is being used as a measure of satisfying customer needs and providing a wider perspective of RAMS importance in terms of the busines

31、s economics. Life Cycle Cost approach represents a holistic, total cost of ownership philosophy for addressing the economic considerations. The contribution of RAMS to the LCC (Life Cycle Cost) of rolling stock could be used to allow the economic considerations to be addressed. This application guid

32、e focuses mainly on the tasks and issues from procurement, engineering and maintenance, from the tender to the operation/maintenance phase, and is intended to help in establishing a common approach for capturing the different, time dependant, performance requirements of rolling stock from an operato

33、r/business perspective. EN 50126-1 is a standard, which treats the overall aspects of RAMS in Railway Applications. This guide deals with the application of RAM part of EN 50126-1 to rolling stock only, as stated in the Scope and clarifies areas where EN 50126-1 could be misinterpreted. 6 CLC/TR 501

34、26-3:20081 Scope This document provides guidance on applying the RAM requirements in EN 50126-1 to rolling stock and for dealing with RAM activities during the system life cycle phases from invitation to tender to demonstration in operation only. All references to EN 50126-1 concern the version of 1

35、998. The guide is aimed at the customers/operators and main suppliers of rolling stock. The main purpose of the guide is to: enable a customer/operator of rolling stock: to specify the RAM requirements addressing the type of operation in terms of the end customer needs, considering service availabil

36、ity and economic considerations; to evaluate different tenders, in terms of RAM requirements, on a common basis with the aid of specific RAM documents; to gain assurance, during design/development phase, that the rolling stock being offered is likely to satisfy the RAM contractual requirements by ex

37、amining step by step detailed and specific RAM documents as an output of the RAM activities performed during the development phase; to validate that the rolling stock, as delivered, satisfies the specified RAM requirements to enable the main supplier of rolling stock to understand the customers/oper

38、ators RAM requirements to provide substantive information/visibility in a tender to show that the product offered is likely to satisfy the RAM requirements by performing preliminary RAM analysis; to provide substantive information during design/development phase to show that the product offered is l

39、ikely to satisfy the RAM requirements by performing detailed RAM analysis; to demonstrate that the product delivered satisfies the RAM requirements; Regarding LCC, this application guide is restricted to providing only the key RAM parameters necessary to be incorporated into an LCC Model. This appli

40、cation guide excludes: RAM values connected to the different RAM requirements (however, it contains a simple guide line of actions for supporting the decision making process and choosing appropriate values, see 5.4) specific RAM documents to be produced and activities to be performed. However, it pr

41、ovides, only as an example, typical data and document templates for recording the output of a RAM analysis). 2 Definitions For the purposes of this document, the terms and definitions given in EN 50126-1 and the following apply: 2.1 Part Number the alphanumeric code, generally assigned by the Main S

42、upplier, to represent a family of items with the same characteristics of Form, Fit and Function 7 CLC/TR 50126-3:20083 Approach adopted for the Guide 3.1 General The approach adopted is to raise the following questions, for each phase of the Life Cycle, in order to successively set up the requiremen

43、ts of EN 50126-1 and the basis for satisfying them: WHAT: what activities / tasks are to be performed and the supporting documents to be produced? WHO: who has the responsibility for these activities / tasks? HOW: which type of method or tool should be used? This process is adopted for the developme

44、nt of the guide and should be applied in accordance with the structure of the application guide. 3.2 Entities Involved In the Life Cycle Phases of Rolling Stock Depending on the organisational and management structure of the railway system concerned, a number of entities, performing different functi

45、ons, may be involved within the life cycle phases of rolling stock. For the purpose of guidance on contractual relations, the entities are divided into 2 main categories, i.e. customer and supplier. It is therefore advisable, to identify all the entities that can be a part of this relationship and t

46、o examine how the responsibilities of dealing with these entities are shared between the customer and supplier relationship. Table 1 gives some typical examples only: Table 1 Possible sharing of responsibility Entity Supplier responsibility Customer responsibility Main supplier of the rolling stock

47、X Sub supplier of the rolling stock X Operator of the rolling stock X Owner of the rolling stock X Maintainer of the rolling stock X X 4 Application of this Guide 4.1 Object of the application This document is applicable to rolling stock (train, coach, locomotive, etc) and to all the subsystems, ass

48、emblies and parts belonging to the rolling stock, according to their boundary limits. Referring to 1.2 of EN 50126-1, the Guide is for use by Railway Authorities and the railway support industry and is applicable to: new rolling stock, modification/refurbishment of existing rolling stock. For use in

49、 this document only, the above two bullet point items should be referred to by the generic term “system”, comprising the complete sequence “system, sub-system, component” of a rolling stock or the whole rolling stock itself breakdown structure. 8 CLC/TR 50126-3:20084.2 Application of EN 50126-1 4.2.1 Assessment of the application of EN 50126-1 Referring to 5.3 of EN 50126-1 and taking into account the responsibilities of

展开阅读全文
相关资源
  • BS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdfBS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdf
  • BS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdfBS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdf
  • BS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdfBS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdf
  • BS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdfBS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdf
  • BS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdfBS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdf
  • BS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdfBS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdf
  • BS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdfBS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdf
  • BS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdfBS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdf
  • BS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdfBS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdf
  • BS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdfBS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > BS

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1