1、May 2013 Translation by DIN-Sprachendienst.English price group 12No part of this translation may be reproduced without prior permission ofDIN Deutsches Institut fr Normung e. V., Berlin. Beuth Verlag GmbH, 10772 Berlin, Germany,has the exclusive right of sale for German Standards (DIN-Normen).ICS 93
2、.030!%$*a“2010762www.din.deDDIN EN 295-6Vitrified clay pipe systems for drains and sewers Part 6: Requirements for components of manholes and inspectionchambers;English version EN 295-6:2013,English translation of DIN EN 295-6:2013-05Steinzeugrohrsysteme fr Abwasserleitungen und -knale Teil 6: Anfor
3、derungen an Bauteile fr Einsteig- und Inspektionsschchte;Englische Fassung EN 295-6:2013,Englische bersetzung von DIN EN 295-6:2013-05Systmes de tuyaux en grs vitrifi pour les collecteurs dassainissement et lesbranchements Partie 6: Exigences applicables aux composants de regards et de boites dinspe
4、ction oude branchement;Version anglaise EN 295-6:2013,Traduction anglaise de DIN EN 295-6:2013-05Supersedes DIN EN 295-6:1995-12;together with DIN EN 295-1:2013-05, DIN EN 295-2:2013-05, DIN EN 295-4:2013-05, DIN EN 295-5:2013-05and DIN EN 295-7:2013-05 supersedes DIN EN 295-10:2005-05Supersedes: se
5、e belowwww.beuth.deDocument comprises 23 pagesIn case of doubt, the German-language original shall be considered authoritative.04.13DIN EN 295-6:2013-05 2 A comma is used as the decimal marker. Start of application It should be noted that, in Germany, CE conformity marking of construction products w
6、ill be permitted once this standard has been listed in the Official Journal of the European Union and/or the Bundesanzeiger (German Federal Gazette) and from the date given therein. For further information, users of this standard should refer to the websites of the European Commission or of the rele
7、vant building authority. National foreword This document (EN 295-6:2013) has been prepared by Technical Committee CEN/TC 165 “Waste water engineering” (Secretariat: DIN, Germany): The preliminary work was done by Working Group WG 2 “Vitrified clay pipes”. The responsible German body involved in its
8、preparation was the Normenausschuss Wasserwesen (Water Practice Standards Committee), Working Committee NA 119-05-07 AA Steinzeugrohre. Amendments This standard differs from DIN EN 295-6:1995-12 und DIN EN 295-10:2005-05 as follows: a) requirements for the reaction to fire have been added; b) Annex
9、ZA has been added; c) the standard has been editorially revised and brought in line with the current rules of presentation. Previous editions DIN 1230-9: 1990-11 DIN EN 295-6: 1995-12, 1992-02 DIN EN 295-10: 2005-05 EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 295-6 February 2013 ICS 93.030
10、Supersedes EN 295-10:2005, EN 295-6:1995English Version Vitrified clay pipes systems for drain and sewers - Part 6: Requirements for components of manholes and inspection chambers Systmes de tuyaux en grs vitrifi pour les collecteurs dassainissement et les branchements - Partie 6: Exigences applicab
11、les aux composants de regards et de botes dinspection ou de branchement Steinzeugrohrsysteme fr Abwasserleitungen und -kanle -Teil 6: Anforderungen an Bauteile fr Einsteig- und Inspektionsschchte This European Standard was approved by CEN on 1 December 2012. CEN members are bound to comply with the
12、CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management
13、Centre or to any CEN member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC Management Centre has the same status as
14、 the official versions. CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Net
15、herlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and United Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG Management Centre: Avenue Marnix 17, B-1000 Brussels 2013 CEN All rights of exp
16、loitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN 295-6:2013: EEN 295-6:2013 (E) 2 Contents Page Foreword . 4 1 Scope 5 2 Normative references . 5 3 Terms and definitions 5 4 Requirements for components for manholes and inspection chambers 6 4.1 Material
17、s, manufacture, water absorption and appearance . 6 4.1.1 Vitrified clay 6 4.1.2 Rubber sealing material . 6 4.1.3 Polyurethane sealing materials . 6 4.1.4 Polypropylene couplings . 6 4.1.5 Materials of other components 6 4.2 Internal diameter 6 4.2.1 Chamber rings and raising pieces 6 4.2.2 Pipelin
18、e connections . 6 4.3 Height . 6 4.4 Angle of curvature and radius of channel bends 7 4.5 Branch angles of channel junctions 7 4.6 Crushing strength (FN) 7 4.7 Bending tensile strength 7 4.8 Bond strength of adhesive used for fixing fired clay parts together . 7 4.9 Fatigue strength under cyclic loa
19、d 7 4.10 Chemical resistance . 7 4.11 Water tightness of assembled components . 7 4.12 Joint systems . 8 5 Common requirements for manholes and inspection chambers . 8 5.1 Reaction to fire . 8 5.2 Durability 8 5.3 Dangerous substances 8 6 Designation 9 7 Marking . 9 7.1 Manhole and inspection chambe
20、r components 9 7.2 Joints 10 8 Evaluation of conformity 10 8.1 General . 10 8.2 Initial type testing . 10 8.3 Factory production control (FPC) 10 Annex A (informative) Examples of manholes and inspection chambers 11 A.1 Manhole 11 A.2 Inspection chamber . 11 Annex B (informative) Manhole stability 1
21、3 Annex ZA (informative) Clauses of this European Standard addressing the provisions of the EU Construction Products Directive . 14 ZA.1 Scope and relevant characteristics . 14 ZA.2.1 Systems of attestation of conformity 16 ZA.2.2 EC declaration of conformity . 17 ZA.3 CE marking . 17 DIN EN 295-6:2
22、013-05 EN 295-6:2013 (E) 3 ZA.3.1 General . 17 ZA.3.2 CE marking on the product 18 ZA.3.3 CE marking in the accompanying documents 18 Bibliography 21 DIN EN 295-6:2013-05 EN 295-6:2013 (E) 4 Foreword This document (EN 295-6:2013) has been prepared by Technical Committee CEN/TC 165 “Wastewater engine
23、ering”, the secretariat of which is held by DIN. This European Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by August 2013, and conflicting national standards shall be withdrawn at the latest by August 2013. At
24、tention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CEN and/or CENELEC shall not be held responsible for identifying any or all such patent rights. This document supersedes EN 295-6:1995 and together with EN 295-1:2013, EN 295-2:2013, E
25、N 295-4:2013, EN 295-5:2013 and EN 295-7:2013 it supersedes EN 295-10:2005. This document has been prepared under a mandate given to CEN by the European Commission and the European Free Trade Association, and supports essential requirements of EU Directive(s). For relationship with EU Directive(s),
26、see informative Annex ZA, which is an integral part of this document. The main changes with respect to the previous edition are listed below: reaction to fire added; Annex ZA added; editorially revised. The standard series EN 295 “Vitrified clay pipe systems for drains and sewers“ consists of the fo
27、llowing parts: Part 1: Requirements for pipes, fittings and joints Part 2: Evaluation of conformity and sampling Part 3: Test methods Part 4: Requirements for adaptors, connectors and flexible couplings Part 5: Requirements for perforated pipes and fittings Part 6: Requirements for components of man
28、holes and inspection chambers (the present document) Part 7: Requirements for pipes and joints for pipe jacking According to the CEN/CENELEC Internal Regulations, the national standards organisations of the following countries are bound to implement this European Standard: Austria, Belgium, Bulgaria
29、, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey
30、 and the United Kingdom. DIN EN 295-6:2013-05 EN 295-6:2013 (E) 5 1 Scope This European Standard applies for components for vitrified clay manholes and inspection chambers for buried drain and sewer systems for the conveyance of wastewater (including domestic wastewater, surface water and rainwater)
31、 under gravity and periodic hydraulic surcharge or under continuous low head of pressure. It specifies different strength classes and heights of sections. It also specifies the requirements for components used for joints, systems of joint dimensions and the materials rubber, polyurethane and polypro
32、pylene used for joints. NOTE 1 The specifiers/purchasers can select the components for vitrified clay manholes and inspection chambers according to their requirements. This standard does not apply to manhole tops and cover slabs. NOTE 2 Corresponding provisions for the evaluation of conformity (ITT
33、and FPC) and sampling and those for the test methods are further specified in EN 295-2 and EN 295-3, respectively. 2 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only th
34、e edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 295-1:2013, Vitrified clay pipe systems for drains and sewers Part 1: Requirements for pipes, fittings and joints EN 295-2:2013, Vitrified clay pipes systems for drai
35、n and sewers Part 6: Requirements for components of manholes and inspection chambers EN 295-3:2012, Vitrified clay pipe systems for drains and sewers Part 3: Test methods EN 681-1, Elastomeric seals Materials requirements for pipe joint seals used in water and drainage applications Part 1: Vulcanize
36、d rubber EN 681-4, Elastomeric seals Materials requirements for pipe joint seals used in water and drainage applications Part 4: Cast polyurethane sealing elements 3 Terms and definitions For the purposes of this document, the terms and definitions given in EN 295-1:2013, and the following apply. 3.
37、1 manhole chamber with a removable cover constructed on a drain or sewer to permit entry by personnel SOURCE: EN 752:2008, 3.41 Note 1 to entry: An example of a vitrified clay manhole is given in Figure A.1. DIN EN 295-6:2013-05 EN 295-6:2013 (E) 6 3.2 inspection chamber chamber with a removable cov
38、er constructed on a drain or sewer that permits the introduction of cleaning and inspection equipment from surface level, but does not provide access for personnel SOURCE: EN 752:2008, 3.34 Note 1 to entry: Examples of vitrified clay inspection chambers are given in Figure A.2. 4 Requirements for co
39、mponents for manholes and inspection chambers 4.1 Materials, manufacture, water absorption and appearance 4.1.1 Vitrified clay For material, manufacture, water absorption and appearance, all vitrified clay elements of manholes and inspection chambers shall be in accordance with EN 295-1:2013, 5.1. 4
40、.1.2 Rubber sealing material Rubber sealing materials shall comply with EN 681-1. 4.1.3 Polyurethane sealing materials Polyurethane sealing elements shall be in accordance with EN 681-4. 4.1.4 Polypropylene couplings Polypropylene couplings shall be in accordance with EN 295-1:2013, 6.1.3. 4.1.5 Mat
41、erials of other components Components of other materials which are used with vitrified clay manholes and inspection chambers shall comply with the relevant European Standard, European Technical Approval or the manufacturers declared specification, as applicable, which shall also include requirements
42、 for long term behaviour. 4.2 Internal diameter 4.2.1 Chamber rings and raising pieces The internal diameter of chamber rings and raising pieces shall be in accordance with EN 295-1:2013, 5.2. 4.2.2 Pipeline connections The internal diameter of pipeline connections from or to manholes shall be in ac
43、cordance with EN 295-1:2013, 5.2. 4.3 Height The nominal height of chamber rings and raising pieces shall be as specified by the manufacturer. The preferred heights are 250, 500, 750, 1 000 and 2 000 mm. The limits of tolerance on this height, measured to the nearest whole mm, shall be from 1 % to +
44、4 %, or 10 mm, whichever is the larger. DIN EN 295-6:2013-05 EN 295-6:2013 (E) 7 4.4 Angle of curvature and radius of channel bends The tolerance on the angle of curvature and radius of channel bends incorporated into manhole bases shall be in accordance with EN 295-1:2013, 5.7. 4.5 Branch angles of
45、 channel junctions The tolerance at the branch angles of channel junctions incorporated into manhole bases shall be in accordance with EN 295-1:2013, 5.8. 4.6 Crushing strength (FN) The crushing strength (FN) of chamber rings and raising pieces shall be in accordance with EN 295-1:2013, 5.9. NOTE 1
46、Where components have been manufactured according to EN 295-1:2013, they do not need to be retested. NOTE 2 For structural performance see Annex B. 4.7 Bending tensile strength If it is required to determine the crushing strength where whole chamber rings and raising pieces are not available, for ex
47、ample after failure in use, a bending tensile strength test, in accordance with EN 295-3:2012, Clause 8, can be carried out on broken chamber rings and raising pieces. The crushing strength shall be calculated from the mean bending tensile strength of at least ten test pieces. 4.8 Bond strength of a
48、dhesive used for fixing fired clay parts together The bond strength of the adhesive used for fixing fired clay parts together shall be in accordance with EN 295-1:2013, 5.12. 4.9 Fatigue strength under cyclic load Where the resistance to fatigue under cyclic loads is required, it shall be demonstrat
49、ed by testing in accordance with EN 295-3:2012, Clause 11, when test pieces shall not fail. NOTE For chamber rings or raising pieces, vitrified clay pipes in accordance with EN 295-1 are typically used. 4.10 Chemical resistance When tested in accordance with EN 295-3:2012, Clause 13, the loss of material from the test piece shall be declared. NOTE 1 Under normal conditions of use, vitrified clay pipes are considered to be resistant to chemical attack and expected to show typical values of loss of material between 0,1