DLA MIL-B-18 250 B-2010 BATTERY DRY BA-399 U.pdf

上传人:unhappyhay135 文档编号:689513 上传时间:2018-12-30 格式:PDF 页数:4 大小:40.36KB
下载 相关 举报
DLA MIL-B-18 250 B-2010 BATTERY DRY BA-399 U.pdf_第1页
第1页 / 共4页
DLA MIL-B-18 250 B-2010 BATTERY DRY BA-399 U.pdf_第2页
第2页 / 共4页
DLA MIL-B-18 250 B-2010 BATTERY DRY BA-399 U.pdf_第3页
第3页 / 共4页
DLA MIL-B-18 250 B-2010 BATTERY DRY BA-399 U.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、AMSC N/A FSC 6135 INCH-POUND MIL-B-18/250B 22 November 2010 SUPERSEDING MIL-B-18/250A (ER) 28 May 1985 MILITARY SPECIFICATION SHEET BATTERY, DRY, BA-399/U This specification is approved for use by all Departments and Agencies of the Department of Defense. The requirements for acquiring the product d

2、escribed herein shall consist of this specification sheet and MIL-B-18. FIGURE 1. Battery dimensions. INACTIVE FOR NEW DESIGN AFTER 10 AUGUST 1998 AND IS NO LONGER USED, EXCEPT FOR REPLACEMENT PURPOSES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,

3、MIL-B-18/250B 2 Ltr Inches mm Min Max Min Max A .562 .625 14.27 15.88 B .450 .563 11.43 14.30 C .250 .313 6.35 7.95 D .562 .625 14.27 15.88 E .255 .270 6.48 6.86 F .056 .111 1.42 2.82 G .219 .229 5.56 5.82 H .323 .378 8.20 9.60 J 1.875 1.938 47.63 49.23 K .437 .500 11.10 12.70 L 3.062 3.125 77.77 7

4、9.38 M .875 1.001 22.23 25.43 NOTES: 1. Dimensions are in inches. 2. Metric equivalents are given for general information only. 3. Four holes to fit .094 inch (2.38 mm) pins. 4. Socket inset contacts are not required. 5. Socket opening in a non metallic jacket shall coincide with outer edge of batte

5、ry on side shown. FIGURE 1. Battery dimensions - Continued. REQUIREMENTS: Dimensions, marking, and configuration: See figure 1. Nominal voltage: 15.0 volts. Usual number and type of cells: 10 “R” cells. Usual cell connection: Series. Terminals: 4-hole socket. Weight (maximum): 6.0 ounces. Capacity t

6、ests: When the battery is tested in accordance with the methods of examination and test of this specification, the minimum capacity-test requirements shall be not less than the minimum time specified for SLD or SLT. Provided by IHSNot for ResaleNo reproduction or networking permitted without license

7、 from IHS-,-,-MIL-B-18/250B 3 First article inspection in accordance with MIL-B-18: Visual and mechanical (external). Battery voltage. Vibration test. Mechanical-shock test in accordance with MIL-STD-202, method 213, test condition I. Insulation resistance test in accordance with MIL-STD-202, method

8、 302, test condition B, tolerance 20 volts. Capacity, D (without storage). Jacket integrity test. Conformance inspection in accordance with MIL-B-18: Visual and mechanical (external). Battery voltage. Insulation resistance test in accordance with MIL-STD-202, method 302, test condition B, tolerance

9、20 volts. Vibration test. Mechanical-shock test in accordance with MIL-STD-202, method 213, test condition I. Jacket integrity test. Electrode leakage. Capacity, D and T. Method of examination and test: Capacity tests: See requirements for capacity specified herein. Storage: Test Period D 12 months

10、T 90 days Discharge: The battery shall be discharged through a resistance of 100 ohms for 2 minutes, then remain on open circuit for 28 minutes. This cycle shall be repeated 5 days per week continuously to a test-end voltage of 10.0 volts. Special marking on each unit package: TO TEST THIS BATTERY W

11、ITH TS-183 ( )/U: USE JACK NO. MINIMUM PERMISSIBLE VOLTAGE 13 13.8 Unless expressly authorized, this test information shall apply to Army and Air Force applications only. Part or Identifying Number (PIN): BA-399/U, see 1.2 of MIL-B-18. Reference documents. In addition to MIL-B-18, this document refe

12、rences the following: MIL-STD-202 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-18/250B 4 The margins of this specification are marked with vertical lines to indicate where changes from the previous issue were made. This was done as a conveni

13、ence only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous issue. Cu

14、stodians: Preparing activity: Army - CR DLA - CC DLA - CC (Project 6135-2010-064) NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at https:/assist.daps.dla.mil. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • CSN ETS 300 260-1995 Private Telecommunication Network (PTN) Specification functional models and information flows Call transfer supplementary service《电信专用网络(PTN):规范;功能模型及信息流 呼叫转移补.pdf CSN ETS 300 260-1995 Private Telecommunication Network (PTN) Specification functional models and information flows Call transfer supplementary service《电信专用网络(PTN):规范;功能模型及信息流 呼叫转移补.pdf
  • CSN ETS 300 261-1995 Private Telecommunication Network (PTN) Inter-exchange signalling protocol Call transfer supplementary service《电信专用网络(PTN):内部交换信令协议 呼叫转移补充服务》.pdf CSN ETS 300 261-1995 Private Telecommunication Network (PTN) Inter-exchange signalling protocol Call transfer supplementary service《电信专用网络(PTN):内部交换信令协议 呼叫转移补充服务》.pdf
  • CSN ETS 300 262-1994 Integrated Services Digital Network (ISDN) Syntax-based Videotex teleservice Service description《综合业务数字网络(ISDN):基于语法的可视数据可视服务 服务描述》.pdf CSN ETS 300 262-1994 Integrated Services Digital Network (ISDN) Syntax-based Videotex teleservice Service description《综合业务数字网络(ISDN):基于语法的可视数据可视服务 服务描述》.pdf
  • CSN ETS 300 265-1994 Integrated Services Digital Network (ISDN) Telephony 7 kHz teleservice Functional capabilities and information flows《综合业务数字网络(ISDN):7千赫兹电话可视服务 操总力和信息流》.pdf CSN ETS 300 265-1994 Integrated Services Digital Network (ISDN) Telephony 7 kHz teleservice Functional capabilities and information flows《综合业务数字网络(ISDN):7千赫兹电话可视服务 操总力和信息流》.pdf
  • CSN ETS 300 266-1994 Integrated Services Digital Network (ISDN) Videotelephony teleservice Functional capabilities and information flows《综合业务数字网络(ISDN):电视电话可视服务 操总力和信息流》.pdf CSN ETS 300 266-1994 Integrated Services Digital Network (ISDN) Videotelephony teleservice Functional capabilities and information flows《综合业务数字网络(ISDN):电视电话可视服务 操总力和信息流》.pdf
  • CSN ETS 300 267-1-1994 Integrated Services Digital Network (ISDN) Telephony 7 kHz and videotelephony teleservices - Digital Subscriber Signalling System No one (DSS1) protocol - Pa.pdf CSN ETS 300 267-1-1994 Integrated Services Digital Network (ISDN) Telephony 7 kHz and videotelephony teleservices - Digital Subscriber Signalling System No one (DSS1) protocol - Pa.pdf
  • CSN ETS 300 287-1994 Integrated Services Digital Nerwork (ISDN) CCITT Signalling System No 7 Transaction Capabilities Application Part (TCAP) version 2《综合业务数字网络(ISDN)国际电报电话咨询委员会(CC.pdf CSN ETS 300 287-1994 Integrated Services Digital Nerwork (ISDN) CCITT Signalling System No 7 Transaction Capabilities Application Part (TCAP) version 2《综合业务数字网络(ISDN)国际电报电话咨询委员会(CC.pdf
  • CSN ETS 300 715-1998 Terminal Equipment (TE) - MHEG script interchange representation (MHEG-SIR)《终端设备(TE):MHEG脚本交换说明(MHEG-SIR)》.pdf CSN ETS 300 715-1998 Terminal Equipment (TE) - MHEG script interchange representation (MHEG-SIR)《终端设备(TE):MHEG脚本交换说明(MHEG-SIR)》.pdf
  • CSN IEC 1000-2-1-1993 Electromagnetic compatibility (EMC) Part 2 Environment Section 1 Description of the environment - Electromagnetic environment for low frequency conducted dist.pdf CSN IEC 1000-2-1-1993 Electromagnetic compatibility (EMC) Part 2 Environment Section 1 Description of the environment - Electromagnetic environment for low frequency conducted dist.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1