EN 45510-6-1-1998 en Guide for Procurement of Power Station Equipment - Part 6-1 Turbine Auxiliaries - Deaerators《发电站设备的采购指南 第6-1部分 涡轮机辅助设备 除气器》.pdf

上传人:sofeeling205 文档编号:716569 上传时间:2019-01-04 格式:PDF 页数:19 大小:1.64MB
下载 相关 举报
EN 45510-6-1-1998 en Guide for Procurement of Power Station Equipment - Part 6-1 Turbine Auxiliaries - Deaerators《发电站设备的采购指南 第6-1部分 涡轮机辅助设备 除气器》.pdf_第1页
第1页 / 共19页
EN 45510-6-1-1998 en Guide for Procurement of Power Station Equipment - Part 6-1 Turbine Auxiliaries - Deaerators《发电站设备的采购指南 第6-1部分 涡轮机辅助设备 除气器》.pdf_第2页
第2页 / 共19页
EN 45510-6-1-1998 en Guide for Procurement of Power Station Equipment - Part 6-1 Turbine Auxiliaries - Deaerators《发电站设备的采购指南 第6-1部分 涡轮机辅助设备 除气器》.pdf_第3页
第3页 / 共19页
EN 45510-6-1-1998 en Guide for Procurement of Power Station Equipment - Part 6-1 Turbine Auxiliaries - Deaerators《发电站设备的采购指南 第6-1部分 涡轮机辅助设备 除气器》.pdf_第4页
第4页 / 共19页
EN 45510-6-1-1998 en Guide for Procurement of Power Station Equipment - Part 6-1 Turbine Auxiliaries - Deaerators《发电站设备的采购指南 第6-1部分 涡轮机辅助设备 除气器》.pdf_第5页
第5页 / 共19页
点击查看更多>>
资源描述

1、STD-BSI BS EN 45520-b-2-ENGL 2778 W Lb24bb7 070832b b5L m BRITISH STANDARD Guide for procurement of power station equipment - Part 6-1: Tiirbine auxiliaries - Deaerators The European Standard EN 45510-6-1:1998 has the status of a British Standard ICs 27.040; 27.100 NO COPYING WITHOUT BSI PERMISSION

2、EXCEPT AS PERMITTED BY COPYRIGHT LAW BS EN 45510-6-1:1998 Incorporating Corrigeruium No. 1 - STD-BSI BS EN 455LO-b-L-ENGL 1978 Lb24bbS 0708327 578 Amd. No. 10075 Corr. No. 1 BS EN 45510-6-1:1998 Issue 2, June 1998 Date Text affected June 1998 “Me on front cover corrected National foreword This Briti

3、sh Standard is the English language version of EN 4551W1:1998. The UK participation in its preparation was entrusted to Technical Committee W-120, Power engineering steering committee, which has the responsibility to: - aid enquirers to understand the text; - present to the responsible internatiomYE

4、uropean committee any enquiries on the interpretation, or proposals for change, and keep the UK interests informed - monitor related intemational and European developments and promulgate them in the UK A list of organizations represented on this committee can be obtained on request to its secretary.

5、 Cross-references The British Standards which implement international or European publications referred to in this document may be found in the BSI Standards Catalogue under the section entitied “International Standards Correspondence Index”, or by using the “Find” facility of the BSI Standards Elec

6、tronic Catalogue. A British Standard does not purport to include all the necessary provisions of a contract. Users of British Stardads are responsible for their correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. This British Standard, h

7、aving been prepared under the direction of the Engineering Sector Board, was published under the authority of the Standards Board and comes into effect on 15 May 1998 O BSI 1998 ISBN O 680 29220 7 - STD-BSI BS EN 45520-b-1-ENGL 2778 M Lb24bb9 0708328 424 Front cover Inside front cover Issue 1, June

8、1998 BS EN 45610-6-k1998 2 EN cover page original 2 2 to 15 original Summary of pages The following table identifies the current issue of each page. Issue 1 indicates that a page has been introduced for the flrst time by amendment. Subsequent issue numbers indicate an updated page. Vertical sidelini

9、ng on replacement pages indicates the most recent changes (amendment, addition, deletion). I Page I issue II page I Issue a b 1 Back cover original blank O BSI 1998 EUROPIUN STANDARD NORME EUFOPEE”E EXJROPmCEE Nom EN 4551W1 January 1998 ICs 27.040 27.100 Descriptors: Electric power stations, turbine

10、s, deaerators, purchase, user supplier relations, invitation of tenders, specifications, technicai writing Engush version Guide for procurement of power station equipment - Part 61: Wine adliaries - Deaerators Guide pour lacquisition dquipements destin - predicted performance is achieved; - arzcilla

11、qj equipment is properly sized; - reliabiiitg, availabilitg and safety requirements are achieved; - proper consideration is given to the evaluation process and the quality measum to be applied. This Guide does not determine the type of specification (e.g. detaed, perfrmance, functional) or the exten

12、t of supply for any given contract which is noWy - any allocation of responsibilities which are determined by the contract. This Guide does not prescribe the arrangement of the documents in the enquirg. NOTE As a comprehensive European avironmatal policy is still under prepamtion, this Guide - geolo

13、gical e.g. seismic conditions and charactemstics of subsoil (e.g. caverns, gliding stratifications, load bearing capability of subsoils); - geographic e.g. elevation, influence of local topography and structures; - hydrological e.g. jlooding and tides. 4.3 Equipment task The specification should des

14、cribe in geneml terms the function, taslc or role of the equipment to be purchased, e.g. whether it is pari of a new power generating plant, a modcation to an misting power generating plant, or repacement equipment. Where ampriate, the specification should define the function and the known limitatio

15、ns, if any, in the equipment connected to Uzat which is being supplied so that the equipment may avoid imposing advme conditions or the supplier may suggest modi$ications to connected equipment which would ensure satisfactory operation. 4.4 Equipment to be purchased The specification may define the

16、equipment type or arrangement to be purchased. For example, the purchaser may spec - whether the deaerator is to be incorporated in the feedwater storage tank; - the type of spray system; - requirements for start-up/off-load heating system. The specification may also these should be to a recognized

17、European or intemational standanl. The specification should define the type and capacity of other services for the operation of the equipment such as compressed air or auxiliary steam. 4.7 Other interfaces The speciftcation should define Uze inwaces with existing anciuary or new ancillary equi-t to

18、be supplied under separate contracts which intemct directly with the equipment, for example condensate pipes, feed pump suction pipes, steam and feedheater drains pipework, civil works or temporary systems. O BSI 1998 4.8 Project programme The specification should describe the overall pmgramme and t

19、imescale in which the project is to be camied out. Thzs may iml safety valves, drain valves, orifice plates, equipment within the deaerator system to accommodate steam, vents, condensate and feedwater entering the deaerator, start-up/off-load heating system, temperature maintaining system, pressure

20、maintaining system (pegging), level control system including emergency tip system, nitrogen preservation system, anti-vortex device on feedwater outlet nozzles, local instrumentation, thermal insulation; handling and maintenance systems, etc.; spray nozzles, gaskets, etc.; tramport, storage, erectio

21、n and cleaning; commissioning and performance tests; documentation: equipment details, operation and If the purchaser wishes to have a contract for control and instrumentation separate from the equipment supply contract, the specification muy require the supplier to provide infmtion on aU the necess

22、ary intqjaces (e.g. all instrum entation tapping points). In addith prowision may need to be mude an the contract to ensure the availabity of information necessary to auoW a satisfmtory control system to be obtained. For example, this may include a requirement for coopemtion between the purchaser an

23、d supplier. Alternatively the specification may define the technical informution on equipment chamcterist.icS to be provided by the supplier and the programme for its de1iv.y. maintenance nianuals. Page 7 EN 46610-6-1:1998 If the purchaser wisks to have a contract for electrical systems, electricd e

24、quipment, cables, etc. separate from Uze equipment supply contmct, the specweation may require the supplier to provide information on aU th necessary intees (electrical loads, sha, heights, motor speeds and direction of rotation, terminal boxes, etc.). Provision may need to be made in the conCract f

25、or cooperation between purchaser and supplier for system(s) to be deve.ped or the specmation may define the technical information to be provided by the supplier and the programme for its delivery. Similar provision may be made for other sdes, etc The extent of supply may include training, technical

26、and layout studies, requirements for cooperation with, the purchaser and/or other suppliers and infmtwn on necessary intqfmes, i$ any. The specification should define the requirements with regard to weather protection, the suce finish (e.g. painting), themzal insulation, noise insulation or cuiding,

27、 etc The spectpcation may require that aU parts of Uze equipment should be protected at aU stages of delivery, storage and instauation. Subsequent to final manufacture a equipment iterns should be protected against deterioratwn due to cornsion. The specification may also define exclusions, for examp

28、le Czzyil work such as buildings, foundations, structures and equipent obtained separately by the purchaser. The specwcation ma,y indicate the acceptability of altemative ofm being included in the tender. 6 lermWpoints The spectfication should define Uze min process input and output terminal points

29、such that the function and peormance of the equipment and its major components may be demonstrated to meet the requirements of the purchaser. The specification should also define terminal points for existing or proposed services, support stwtures or civ work. These may, for example, include aruiMary

30、 senrices, control and instru-tation system, heating and ventilation systems, cramge, general access arrangements and fire fQhting systems. It may be necessary for design and analytical wo - obligations e.g. operational staff shift patterns; - restrictions e.g. pmcess waste disposal. 7.2 Manning lev

31、els The specification should define the power station manning levels where they may influence Ute equipment supply. 7.3 Normal operation The speclfication should define in broa temis the expected nod operatwn of the power station and of the equipment. This may be a period of continuous fdl load oper

32、ation to the expected availability of its associated boiierhbhe between planned unit shutdowns, followed by a period at full or part load for a reduced number of hours between planned shutdowns and then a period of intermittent operation with frequent short shutdowns. Normal operation is generally a

33、t load levels, temperatures, pressures and fluid velocities taken into account by the supplier for design and includes variations due to the normal power changes (transients) of the plant. 7.4 Operating hours The specbfication should - operation with one or more Lp heaters out of service; - overpres

34、sure of the deaerator; - excess flowrate or energy input in the deaerator; - opening of the boiler recirculation valves at full load. 7.7 Further operational requirements 7.7.1 Load changes The purchaser should indicate the number and rate of load changes envisaged for the system. 7.7.2 Definition o

35、f the operational modes Every operational mode is defined by - mass flow of fluids (at inlets and outlets); - temperature and enthalpy of fluids, - pressure in the deaerator; - water quality (chemical composition, O2 concenlmtion); - frequency and gradients of thermal cycles. 8 Life expectancy 8.1 D

36、esign life 8.1.1 General This should be a sptxific period which takes into account Ute anticipated operating regime and recommended maintenance and wild broadly equate to Uze stated operating hours (see 7.4). T specification should define the design life of components which may be subject to periodi

37、c repkmt. The supplier should defim limitations on equipment life, vany, and Uzese should be included in the tender maluution process. 8.1.2 Number of start-up and shutdown cgcles The specification should include an estimate of the number of cycles to which Uze equipment wid be sut$?43ed. With deaer

38、ators this will be a function of the number of turbineboiler starts (defined in 7.6) and may be derived by the purchaser from experience of operating power plants. O BSI 1998 STD-BSI BS EN Li5510-b-L-ENGL 1998 lb24bb9 0708337 Li37 8.1.3 Equipment for monitoring remaining lcfe The specification may r

39、equest proposals for monitoring the remaining life of compomts which are suect to fatigue, wear, erosion ador corrosion. In sm cases sp these should include the steady state loads or cyclic loads imposed by external pipework on vessel branch connections; - loads due to ambient and local conditions (

40、snow, wind, earthquake, climate, etc.); - imposed conditions specific to the site which could require certain design particulars (e.g. impact resistance, resistance to a chemical atmosphere, explosion-proof protection, etc.). The design should take into account methods, procedures and practices impo

41、sed by the specification oniy in the sense that these methods and procedures may be considered as minimum requirements (i.e. mechanical calculation codes, criteria for combination of loads). 10.1.2 Erosion and corrosion Should erosion and/or corrosion problems be expected, the specification should s

42、pecify minimum extra thickness or the use of corrosion resistant materiah to be taken into account in the design. The design should take into account the water quality and the type of chemical treatment. O BSI 1998 Page 10 EN 4551o-1:1998 10.1.3 Fabrication procedures - Tolerances The specification

43、should state the dimensions and positions of nozzles and supports, attachment for ladders and platforms, and insulation supports. Required dimensional tolerances, in order to ensure easy connection with other components of the system, should also be stated. The purchaser may request that, after rece

44、ipt of the order, the supplier submit procedures and specifications for main construction operations such as: - cutting of plates; - forming of heads. 10.1.4 Specific design features The purchaser, based on experience of simiiar equipment, may forbid some types of conceptual andor detail design. In

45、doing so the specification should avoid unduly restricting competition. 10.1.6 Dimensional limitations if the equipment is to be installed in a limited space or access is limited, the specification should specify maximum dimensions of components and equipment. 10.1.6 Protection against ingress of wa

46、terhteam to turbines Where the system supply or system design contract is sepaicite from the deaerator equipment supply contract provision should be made in each contract for cooperation between the system designer and equipment supplier in developing a system to automatically protect the turbine ag

47、ainst the accidental reflux of water or steamhater through the bled steam lines and potentially damaging ingress into the turbine. 10.1.7 Maintenance features The specification should state requirements for man access provisions in the deaerating dome and storage tank. The tenderer may offer alterna

48、tive features, but these should be justified by additional information or references. 10.1.8 Measuring and sampling points The specification may define where measuring and sampling points for tests during the lifetime of ule equipment should be provided. The specification should indicate the type of

49、 performance tests (see clause 17) and routine tests to be carried out, but the supplier should use experkme of simur equipment supplied to ensure that adequate provision is made for testing in the design of ule equipment . 10.1.9 Legislation measurement points The specification should noWy define the legislation and codes of practice for which operating data are required and the provision for measurement ador sampling points to auOw these data to be obtained. NOTE Emissions, noise, vibration and temperature measurement are frequentiy required f