1、BSI Standards PublicationIndustrial communication networks ProfilesPart 5-2: Installation of fieldbuses Installation profiles for CPF 2BS EN 61784-5-2:2013National forewordThis British Standard is the UK implementation of EN 61784-5-2:2013. It is identical to IEC 61784-5-2:2013. It supersedes BS EN
2、61784-5-2:2012 which is withdrawn.The UK participation in its preparation was entrusted to TechnicalCommittee AMT/7, Industrial communications: process measurement and control, including fieldbus.A list of organizations represented on this committee can be obtained onrequest to its secretary.This pu
3、blication does not purport to include all the necessary provisions ofa contract. Users are responsible for its correct application. The British Standards Institution 2014.Published by BSI Standards Limited 2014ISBN 978 0 580 84194 1ICS 25.040.40; 35.100.05Compliance with a British Standard cannot co
4、nfer immunity fromlegal obligations.This British Standard was published under the authority of theStandards Policy and Strategy Committee on 31 January 2014.Amendments/corrigenda issued since publicationDate Text affectedBRITISH STANDARDBS EN 61784-5-2:2013EUROPEAN STANDARD EN 61784-5-2 NORME EUROPE
5、NNE EUROPISCHE NORM December 2013 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung CEN-CENELEC Management Centre: Avenue Marnix 17, B - 1000 Brussels 2013 CENELEC - All rights of exploitat
6、ion in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 61784-5-2:2013 E ICS 25.040.40; 35.100.40 Supersedes EN 61784-5-2:2012 English version Industrial communication networks - Profiles - Part 5-2: Installation of fieldbuses - Installation profiles for CPF 2 (IEC 61784
7、-5-2:2013) Rseaux de communication industriels - Profils - Partie 5-2: Installation des bus de terrain - Profils dinstallation pour CPF 2 (CEI 61784-5-2:2013) Industrielle Kommunikationsnetze - Profile - Teil 5-2: Feldbusinstallation - Installationsprofile fr die Kommunikationsprofilfamilie 2 (IEC 6
8、1784-5-2:2013) This European Standard was approved by CENELEC on 2013-10-14. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and b
9、ibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the
10、 responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia,
11、 Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. BS EN 61784-5-2:2013EN
12、61784-5-2:2013 - 2 - Foreword The text of document 65C/738/FDIS, future edition 3 of IEC 61784-5-2, prepared by SC 65C “Industrial networks“ of IEC/TC 65 “Industrial-process measurement, control and automation“ was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN 61784-5-2:20
13、13. The following dates are fixed: latest date by which the document has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2014-07-14 latest date by which the national standards conflicting with the document have to be withdrawn (dow) 2016-1
14、0-14 This document supersedes EN 61784-5-2:2012. EN 61784-5-2:2013 includes the following significant technical changes with respect to EN 61784-5-2:2012: updates pertaining to current installation practices; addition of new technology that has become recently available; errors have been corrected;
15、improved alignment with EN 61918. This standard is to be used in conjunction with EN 61918:2013. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for identifying any or all such pate
16、nt rights. Endorsement notice The text of the International Standard IEC 61784-5-2:2013 was approved by CENELEC as a European Standard without any modification. In the official version, for Bibliography, the following notes have to be added for the standards indicated: IEC 61158 Series NOTE Harmoniz
17、ed as EN 61158 Series (not modified). IEC/TR 61158-1 NOTE Harmonized as CLC/TR 61158-1. IEC 62026-3 NOTE Harmonized as EN 62026-3. BS EN 61784-5-2:2013- 3 - EN 61784-5-2:2013 Annex ZA (normative) Normative references to international publications with their corresponding European publications The fo
18、llowing documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. NOTE When an
19、international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD applies. Annex ZA of EN 61918:2013 applies, except as follows: Publication Year Title EN/HD Year Addition to Annex ZA of EN 61918:2013: IEC 61918 2013 Industrial communication networks - Insta
20、llation of communication networks in industrial premises EN 61918 2013 BS EN 61784-5-2:2013 2 61784-5-2 IEC:2013 CONTENTS INTRODUCTION . 11 1 Scope . 12 2 Normative references . 12 3 Terms, definitions and abbreviated terms . 12 4 CPF 2: Overview of installation profiles 12 5 Installation profile co
21、nventions . 13 6 Conformance to installation profiles 14 Annex A (normative) CP 2/1 (ControlNet) specific installation profile 15 A.1 Installation profile scope . 15 A.2 Normative references . 15 A.3 Installation profile terms, definitions, and abbreviated terms . 15 A.3.1 Terms and definitions 15 A
22、.3.2 Abbreviated terms . 15 A.3.3 Conventions for installation profiles . 15 A.4 Installation planning . 16 A.4.1 General . 16 A.4.2 Planning requirements . 17 A.4.3 Network capabilities 18 A.4.4 Selection and use of cabling components 24 A.4.5 Cabling planning documentation 41 A.4.6 Verification of
23、 planning specification . 41 A.5 Installation implementation . 41 A.5.1 General requirements 41 A.5.2 Cable installation . 41 A.5.3 Connector installation 43 A.5.4 Terminator installation . 53 A.5.5 Device installation . 53 A.5.6 Coding and labelling 55 A.5.7 Earthing and bonding of equipment and de
24、vices and shield cabling . 56 A.5.8 As-implemented cabling documentation . 57 A.6 Installation verification and installation acceptance test 57 A.6.1 General . 57 A.6.2 Installation verification . 57 A.6.3 Installation acceptance test . 60 A.7 Installation administration . 62 A.8 Installation mainte
25、nance and installation troubleshooting . 62 A.8.1 General . 62 A.8.2 Maintenance 62 A.8.3 Troubleshooting 62 A.8.4 Specific requirements for maintenance and troubleshooting 67 Annex B (normative) CP 2/2 (EtherNet/IP) specific installation profile . 68 B.1 Installation profile scope . 68 B.2 Normativ
26、e references . 68 BS EN 61784-5-2:201361784-5-2 IEC:2013 3 B.3 Installation profile terms, definitions, and abbreviated terms . 68 B.3.1 Terms and definitions 68 B.3.2 Abbreviated terms . 68 B.3.3 Conventions for installation profiles . 68 B.4 Installation planning . 69 B.4.1 General . 69 B.4.2 Plan
27、ning requirements . 70 B.4.3 Network capabilities 70 B.4.4 Selection and use of cabling components 74 B.4.5 Cabling planning documentation 86 B.4.6 Verification of cabling planning specification . 87 B.5 Installation implementation . 87 B.5.1 General requirements 87 B.5.2 Cable installation . 87 B.5
28、.3 Connector installation 88 B.5.4 Terminator installation . 89 B.5.5 Device installation . 89 B.5.6 Coding and labelling 89 B.5.7 Earthing and bonding of equipment and devices and shield cabling . 89 B.5.8 As-implemented cabling documentation . 91 B.6 Installation verification and installation acce
29、ptance test 91 B.6.1 General . 91 B.6.2 Installation verification . 91 B.6.3 Installation acceptance test . 93 B.7 Installation administration . 94 B.8 Installation maintenance and installation troubleshooting . 94 Annex C (normative) CP 2/3 (DeviceNet) specific installation profile . 95 C.1 Install
30、ation profile scope . 95 C.2 Normative references . 95 C.3 Installation profile terms, definitions, and abbreviated terms . 95 C.3.1 Terms and definitions 95 C.3.2 Abbreviated terms . 95 C.3.3 Conventions for installation profiles . 95 C.4 Installation planning . 96 C.4.1 General . 96 C.4.2 Planning
31、 requirements . 97 C.4.3 Network capabilities 98 C.4.4 Selection and use of cabling components 112 C.4.5 Cabling planning documentation 121 C.4.6 Verification of cabling planning specification . 121 C.5 Installation implementation . 121 C.5.1 General requirements 121 C.5.2 Cable installation . 121 C
32、.5.3 Connector installation 124 C.5.4 Terminator installation . 136 C.5.5 Device installation . 138 C.5.6 Coding and labelling 141 BS EN 61784-5-2:2013 4 61784-5-2 IEC:2013 C.5.7 Earthing and bonding of equipment and devices and shield cabling . 141 C.5.8 As-implemented cabling documentation . 142 C
33、.6 Installation verification and installation acceptance test 142 C.6.1 General . 142 C.6.2 Installation verification . 142 C.6.3 Installation acceptance test . 145 C.7 Installation administration . 146 C.8 Installation maintenance and installation troubleshooting . 146 C.8.1 General . 146 C.8.2 Mai
34、ntenance 146 C.8.3 Troubleshooting 146 C.8.4 Specific requirements for maintenance and troubleshooting 146 Annex D (informative) Additional information . 150 D.1 Network validation check sheet for CP 2/3 (DeviceNet) 150 Bibliography 154 Figure 1 Standards relationships 11 Figure A.1 Interconnection
35、of CPF 2 networks . 16 Figure A.2 Overview of CPF 2/1 networks 17 Figure A.3 Drop cable requirements . 19 Figure A.4 Placement of BNC/TNC plugs . 19 Figure A.5 Placement of terminators 20 Figure A.6 Extending a network using repeaters 20 Figure A.7 Extending a network using active star topology . 21
36、 Figure A.8 Links . 21 Figure A.9 Extending the network beyond 99 nodes . 22 Figure A.10 Maximum allowable taps per segment . 30 Figure A.11 Example of repeaters in star configuration 31 Figure A.12 Repeaters in parallel . 32 Figure A.13 Repeaters in combination series and parallel 33 Figure A.14 Ri
37、ng repeater 33 Figure A.15 Installing bulkheads 34 Figure A.16 Coaxial BNC and TNC terminators 35 Figure A.17 Terminator placement in a segment 35 Figure A.18 Redundant network icons 37 Figure A.19 Redundant coax media . 38 Figure A.20 Redundant fibre media 38 Figure A.21 Repeaters in series versus
38、length difference for coax media . 39 Figure A.22 Repeaters in series versus length difference for fibre media . 39 Figure A.23 Example of redundant coax network with repeaters . 40 Figure A.24 Example of improper redundant node connection 40 Figure A.25 Example tool kit for installing BNC connector
39、s 44 Figure A.26 Calibration of coaxial stripper 45 Figure A.27 Coax PVC strip length detail (informative) . 45 BS EN 61784-5-2:201361784-5-2 IEC:2013 5 Figure A.28 Memory cartridge and blade 46 Figure A.29 Cable position . 47 Figure A.30 Locking the cable 47 Figure A.31 Stripping the cable 47 Figur
40、e A.32 Install the crimp ferrule . 48 Figure A.33 Cable preparation for PVC type cables (informative) . 48 Figure A.34 Cable preparation for FEP type cables (informative) . 49 Figure A.35 Strip guides 49 Figure A.36 Using the flare tool 50 Figure A.37 Expanding the shields . 50 Figure A.38 Install t
41、he centre pin . 50 Figure A.39 Crimping the centre pin . 51 Figure A.40 Installing the connector body 51 Figure A.41 Installing the ferrule 51 Figure A.42 Crimp tool . 52 Figure A.43 Sealed IP65/67 cable 53 Figure A.44 Terminator placement . 53 Figure A.45 Mounting the taps . 54 Figure A.46 Mounting
42、 the tap assembly using the universal mounting bracket . 55 Figure A.47 Mounting the tap using tie wraps or screws . 55 Figure A.48 Redundant network icons 56 Figure A.49 Network test tool . 58 Figure A.50 Shorting the cable to test for continuity . 59 Figure A.51 Testing fibre segments 61 Figure A.
43、52 Multi-fibre backbone cable housing . 63 Figure A.53 Repeater adapter module 63 Figure A.54 Short and medium distance fibre module LEDs . 65 Figure A.55 Long and extra long repeater module LEDs 66 Figure B.1 Interconnection of CPF 2 networks . 69 Figure B.2 Redundant linear bus 71 Figure B.3 Peer
44、to peer connections 71 Figure B.4 Mated connections 74 Figure B.5 The 8-way modular sealed jack passive taps (non-sealed and sealed) with fixed 1 m drop cable BNC/TNC connector on the end of the drop cable, which shall not be extended under any circumstances; trunk line terminators BNC/TNC; repeater
45、s (linear, ring and star) fibre and copper; various coaxial couplers, bulkhead, jack-to-jack and plug-to-plug (BNC/TNC). BS EN 61784-5-2:201361784-5-2 IEC:2013 17 Figure A.2 Overview of CPF 2/1 networks A.4.2 Planning requirements A.4.2.1 Safety A.4.2.1.1 General A.4.2.1.2 Electrical safety A.4.2.1.
46、3 Functional safety Not applicable. A.4.2.1.4 Intrinsic safety Not applicable. A.4.2.1.5 Safety of optical fibre communication systems A.4.2.2 Security A.4.2.3 Environmental considerations and EMC A.4.2.3.1 Description methodology Addition: The configuration of the low-voltage power distribution sys
47、tem shall comply with local regulations. In some cases and geographical areas, additional earthing and bonding is necessary to control noise currents and provide a low noise functional earth for the low signal communications devices. This may be achieved through methods described in IEC 61918:2013,
48、4.4.7 and A.4.4.7.3 of this standard. This network uses a parallel RC between earth and the shield of the coaxial cable. The shields shall not directly reference to earth at any point in the system, as doing so will allow noise currents to flow in the shields causing high error rates in the network.
49、 Link N TR TR N N N T T T T TR TR N N T T T T R TR TR N N T T T Link (1 segment) T B N TR Trunk line Drop line Node or device Passive tap with 1 m drop cable Terminating resistor T R Repeater B Bridge Network BS EN 61784-5-2:2013 18 61784-5-2 IEC:2013 A.4.2.3.2 Use of the described environment to produce a bill of material A.4.2.4 Specific requirements for generic cabling in accordance