1、BSI Standards PublicationNuclear power plants Instrumentation and control important to safety Development of HDL-programmed integrated circuits for systems performingcategory A functionsBS IEC 62566:2012BS EN 62566:2014BS EN 62566:2014 BRITISH STANDARDNational forewordThis British Standard is the UK
2、 implementation of EN 62566:2014. It isidentical to IEC 62566:2012. It supersedes BS IEC 62566:2012, which is withdrawn.The UK participation in its preparation was entrusted to TechnicalCommittee NCE/8, Reactor instrumentation.A list of organizations represented on this committee can be obtainedon r
3、equest to its secretary.This publication does not purport to include all the necessary provisionsof a contract. Users are responsible for its correct application. The British Standards Institution 2014.Published by BSI Standards Limited 2014ISBN 978 0 580 84483 6 ICS 27.120.20 Compliance with a Brit
4、ish Standard cannot confer immunity from legal obligations.This British Standard was published under the authority of the StandardsPolicy and Strategy Committee on 31 January 2013.Amendments/corrigenda issued since publicationDate Text affected31 October 2014 This corrigendum renumbers BS IEC 62566:
5、2012 asBS EN 62566:2014. Annex ZA insertedEUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 62566 August 2014 ICS 27.120.20 English Version Nuclear power plants - Instrumentation and control important to safety - Development of HDL-programmed integrated circuits for systems performing category A
6、functions (IEC 62566:2012) Centrales nuclaires de puissance - Instrumentation et contrle-commande importants pour la sret - Dveloppement des circuits intgrs programms en HDL pour les systmes ralisant des fonctions de catgorie A (CEI 62566:2012) Kernkraftwerke - Leittechnik fr Systeme mit sicherheits
7、technischer Bedeutung - Entwicklung HDL-programmierter integrierter Schaltkreise fr Systeme, die Funktionen der Kategorie A ausfhren (IEC 62566:2012) This European Standard was approved by CENELEC on 2014-08-04. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stip
8、ulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CENELEC member. This Europ
9、ean Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CENELEC mem
10、bers are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, No
11、rway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung CEN-CENELEC Management Centre: Aven
12、ue Marnix 17, B-1000 Brussels 2014 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members. Ref. No. EN 62566:2014 E EN 62566:2014 - 2 - Foreword This document (EN 62566:2014) consists of the text of IEC 62566:2012 prepared by SC 45A “Instrumentation, c
13、ontrol and electrical systems of nuclear facilities“ of IEC/TC 45 “Nuclear instrumentation“. The following dates are fixed: latest date by which this document has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2015-08-04 latest date by wh
14、ich the national standards conflicting with this document have to be withdrawn (dow) 2017-08-04 As stated in the nuclear safety directive 2009/71/EURATOM, Chapter 1, Article 2, item 2, Member States are not prevented from taking more stringent safety measures in the subject-matter covered by the Dir
15、ective, in compliance with Community law. In a similar manner, this European standard does not prevent Member States from taking more stringent nuclear safety measures in the subject-matter covered by this standard. Endorsement notice The text of the International Standard IEC 62566:2012 was approve
16、d by CENELEC as a European Standard without any modification. 4 BS EN 62566:2014EN 62566:2014EN 62566:2014 - 2 - Foreword This document (EN 62566:2014) consists of the text of IEC 62566:2012 prepared by SC 45A “Instrumentation, control and electrical systems of nuclear facilities“ of IEC/TC 45 “Nucl
17、ear instrumentation“. The following dates are fixed: latest date by which this document has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2015-08-04 latest date by which the national standards conflicting with this document have to be wi
18、thdrawn (dow) 2017-08-04 As stated in the nuclear safety directive 2009/71/EURATOM, Chapter 1, Article 2, item 2, Member States are not prevented from taking more stringent safety measures in the subject-matter covered by the Directive, in compliance with Community law. In a similar manner, this Eur
19、opean standard does not prevent Member States from taking more stringent nuclear safety measures in the subject-matter covered by this standard. Endorsement notice The text of the International Standard IEC 62566:2012 was approved by CENELEC as a European Standard without any modification. - 3 - EN
20、62566:2014 Annex ZA (normative) Normative references to international publications with their corresponding European publications The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the editio
21、n cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. NOTE 1 When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD applies. NOTE 2 Up-to-date information on the latest v
22、ersions of the European Standards listed in this annex is available here: www.cenelec.eu. Publication Year Title EN/HD Year IEC 60671 - Nuclear power plants - Instrumentation and control systems important to safety - Surveillance testing EN 60671 - IEC 60880 2006 Nuclear power plants - Instrumentati
23、on and control systems important to safety - Software aspects for computer-based systems performing category A functions EN 60880 2009 IEC 60987 2007 Nuclear power plants - Instrumentation and control important to safety - Hardware design requirements for computer-based systems EN 60987 2009 IEC 615
24、13 2011 Nuclear power plants - Instrumentation and control important to safety - General requirement for systems EN 61513 2013 IEC 62138 - Nuclear power plants - Instrumentation and control important for safety - Software aspects for computer-based systems performing category B or C functions EN 621
25、38 - IEC 62340 - Nuclear power plants - Instrumentation and control systems important to safety - Requirements for coping with common cause failure (CCF) EN 62340 - IAEA guide NS-G-1.3 2002 Instrumentation and control systems important to safety in nuclear power plants - - 5 BS EN 62566:2014EN 62566
26、:2014 2 62566 IEC:2012 CONTENTS FOREWORD . 5 INTRODUCTION . 7 1 Scope and object 10 1.1 General . 10 1.2 Use of this Standard 10 2 Normative references . 11 3 Terms and definitions . 11 4 Symbols and abbreviations . 13 5 General requirements for HPD projects 14 5.1 General . 14 5.2 Life-cycle. 14 5.
27、3 HPD project management 17 5.3.1 General . 17 5.3.2 Additional requirements . 17 5.4 HPD quality assurance plan 17 5.5 Configuration management 17 6 HPD requirements specification 18 6.1 General . 18 6.2 Functional aspects of the requirement specification . 18 6.3 Deterministic design 19 6.4 Fault
28、detection and fault tolerance . 19 6.5 Requirements capture using Electronic System Level tools . 20 6.5.1 General . 20 6.5.2 Requirements on the formalism of tools used at ESL level . 20 6.5.3 Interface with design tools . 20 6.6 Requirements analysis and review 20 7 Acceptance process for programm
29、able integrated circuits, native blocks and pre-developed blocks 21 7.1 General . 21 7.2 Component requirement specification 21 7.2.1 General . 21 7.2.2 Requirements 21 7.2.3 Requirements analysis and review . 21 7.3 Rules of use 22 7.4 Selection . 22 7.4.1 General . 22 7.4.2 Documentation review .
30、22 7.4.3 Operating experience review . 22 7.4.4 Specific requirements related to the blank integrated circuits . 23 7.5 Acceptance justification . 23 7.6 Modification for acceptance . 24 7.7 Modification after acceptance 24 7.8 Acceptance documentation 24 8 HPD design and implementation . 24 8.1 Gen
31、eral . 24 8.2 Hardware Description Languages (HDL) and related tools . 24 BS IEC 62566:2012BS EN 62566:201462566 IEC:2012 6 9111414141515171919192121212121222222232324242424242525252525252626262626272728282828282862566 IEC:2012 3 8.3 Design . 25 8.3.1 General . 25 8.3.2 Defensive design . 25 8.3.3 S
32、tructure . 25 8.3.4 Language and coding rules 26 8.3.5 Synchronous vs asynchronous design . 27 8.3.6 Power management . 27 8.3.7 Initialization . 28 8.3.8 Non-functional configurations 28 8.3.9 Testability 28 8.3.10 Design documentation . 28 8.4 Implementation 29 8.4.1 General . 29 8.4.2 Products 29
33、 8.4.3 Files of parameters and constraints . 29 8.4.4 Post-route analyses . 30 8.4.5 Redundancies introduced or removed by the tools . 30 8.4.6 Finite state machines . 31 8.4.7 Static timing analysis . 31 8.4.8 Implementation documentation 31 8.5 System level tools and automated code generation . 32
34、 8.6 Documentation 33 8.7 Design and implementation review 33 9 HPD verification . 33 9.1 General . 33 9.2 Verification plan 34 9.3 Verification of the use of the pre-developed items . 35 9.4 Verification of the design and implementation 35 9.5 Test-benches 36 9.6 Test coverage . 36 9.7 Test executi
35、on . 37 9.8 Static verification . 37 10 HPD aspects of system integration . 37 10.1 General . 37 10.2 HPD aspects of the system integration plan 38 10.3 Specific aspects of system integration . 38 10.4 Verification of the integrated system 39 10.5 Fault resolution procedures . 39 10.6 HPD aspects of
36、 the integrated system test report 39 11 HPD aspects of system validation . 40 11.1 General . 40 11.2 HPD aspects of the system validation plan 40 11.3 System validation 40 11.4 HPD aspects of the system validation report . 40 11.5 Fault resolution procedures . 41 12 Modification 41 12.1 Modificatio
37、n of the requirements, design or implementation . 41 12.2 Modification of the micro-electronic technology . 41 BS IEC 62566:2012BS EN 62566:201462566 IEC:2012 7 292929293031313232323233333333343435353536373737373839394040414141414242434343444444444445454545 4 62566 IEC:2012 13 HPD production 41 13.1
38、 General . 41 13.2 Production tests 41 13.3 Programming files and programming activities . 42 14 HPD aspects of installation, commissioning and operation . 42 15 Software tools for the development of HPDs . 42 15.1 General . 42 15.2 Additional requirements for design, implementation and simulation t
39、ools . 42 16 Design segmentation or partitioning 43 16.1 Background . 43 16.2 Auxiliary or support functions 43 16.2.1 General . 43 16.2.2 Partitioning of auxiliary or support functions of category other than A 43 17 Defences against HPD Common Cause Failure 44 17.1 Background . 44 17.2 Requirements
40、 44 Annex A (informative) Documentation 45 Annex B (informative) Development of HPDs . 47 Bibliography 52 Figure 1 System life-cycle (informative, as defined by IEC 61513) . 15 Figure 2 Development life-cycle of HPD . 16 BS IEC 62566:2012BS EN 62566:201462566 IEC:2012 8 45454546464646464747474747484
41、848495156192062566 IEC:2012 5 INTERNATIONAL ELECTROTECHNICAL COMMISSION _ NUCLEAR POWER PLANTS INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY DEVELOPMENT OF HDL-PROGRAMMED INTEGRATED CIRCUITS FOR SYSTEMS PERFORMING CATEGORY A FUNCTIONS FOREWORD 1) The International Electrotechnical Commission (IEC)
42、 is a worldwide organization for standardization comprising all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and in addition
43、to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested i
44、n the subject dealt with may participate in this preparatory work. International, governmental and non-governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely with the International Organization for Standardization (ISO) in accordance with cond
45、itions determined by agreement between the two organizations. 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international consensus of opinion on the relevant subjects since each technical committee has representation from all interested IEC Nat
46、ional Committees. 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC Publications is accurate, IEC cannot be held responsible for the w
47、ay in which they are used or for any misinterpretation by any end user. 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications transparently to the maximum extent possible in their national and regional publications. Any divergence between any IE
48、C Publication and the corresponding national or regional publication shall be clearly indicated in the latter. 5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity assessment services and, in some areas, access to IEC marks of conformity.
49、IEC is not responsible for any services carried out by independent certification bodies. 6) All users should ensure that they have the latest edition of this publication. 7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and members of its technical committees and IEC National Committees for any personal injury, property damage or other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) an