FORD ESE-M8G127-A3-2000 GASKET CORK CHLOROSULFONATED POLYETHYLENE BINDER - FIRM (Shown on FORD ESE-M8G127-A2)《硬质软木 氯磺化聚乙烯胶粘剂合成垫片[替代 FORD ESE-M8G127-A2]》.pdf

上传人:unhappyhay135 文档编号:746007 上传时间:2019-01-14 格式:PDF 页数:5 大小:43.65KB
下载 相关 举报
FORD ESE-M8G127-A3-2000 GASKET CORK CHLOROSULFONATED POLYETHYLENE BINDER - FIRM (Shown on FORD ESE-M8G127-A2)《硬质软木 氯磺化聚乙烯胶粘剂合成垫片[替代 FORD ESE-M8G127-A2]》.pdf_第1页
第1页 / 共5页
FORD ESE-M8G127-A3-2000 GASKET CORK CHLOROSULFONATED POLYETHYLENE BINDER - FIRM (Shown on FORD ESE-M8G127-A2)《硬质软木 氯磺化聚乙烯胶粘剂合成垫片[替代 FORD ESE-M8G127-A2]》.pdf_第2页
第2页 / 共5页
FORD ESE-M8G127-A3-2000 GASKET CORK CHLOROSULFONATED POLYETHYLENE BINDER - FIRM (Shown on FORD ESE-M8G127-A2)《硬质软木 氯磺化聚乙烯胶粘剂合成垫片[替代 FORD ESE-M8G127-A2]》.pdf_第3页
第3页 / 共5页
FORD ESE-M8G127-A3-2000 GASKET CORK CHLOROSULFONATED POLYETHYLENE BINDER - FIRM (Shown on FORD ESE-M8G127-A2)《硬质软木 氯磺化聚乙烯胶粘剂合成垫片[替代 FORD ESE-M8G127-A2]》.pdf_第4页
第4页 / 共5页
FORD ESE-M8G127-A3-2000 GASKET CORK CHLOROSULFONATED POLYETHYLENE BINDER - FIRM (Shown on FORD ESE-M8G127-A2)《硬质软木 氯磺化聚乙烯胶粘剂合成垫片[替代 FORD ESE-M8G127-A2]》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATION Material Name Specification Number Date Action Revisions Rev 03 2012 04 12 N Status No usage or replacement N. Benipal, NA 2000 12 01 Revised Removed ESE-M8G127-A1 1 in (25 mm) wide x 3 in (76 mm) minimum length, volume; 1 x 2 in (25 x 51 mm) and thickness of both

2、 as received, except as noted for oil immersion tests, paras 3.3 and 3.4 3.1 ORIGINAL PROPERTIES ESE-M8G127- A2 A3 (or ESE-M8G129-A) 3.1.1 Density, lb/ft3 42 45 (kg/m3), min (673) (721) 3.1.2 Hardness, Durometer “A“ 60 70 65 - 75 (ASTM D 2240) 3.1.3 Tensile Strength, 225 400 psi (MPa), min (1.6) (2.

3、8) 3.1.4 Flexibility, F5 Must pass Must pass 3.1.5 Compressibility and Recovery (ASTM F 36, Procedure “B“, except no more than 2 parts may be nested together to obtain a minimum width of 0.6 in (15 mm) Load, psi (MPa) Compressibility, % 100 (0.7) 10 - 25 8 - 20 400 (2.8) 32 47 25 - 37 1000 (6.9) 50

4、65 40 - 52 2000 (13.8) - 45 - 57 Recovery, % min 100 (0.7) 80 80 400 (2.8) 80 80 1000 (6.9) 80 80 2000 (13.8) - - 3.1.6 Compression Set, % max 60 60 (ASTM D 395, Method “A“, 70 h at 100 C) 3.1.7 Ozone Rating ESB-M9P1-A ESB-M9P1-A (FLTM BP 1-1 at 25 % elongation) ENGINEERING MATERIAL SPECIFICATION ES

5、E-M8G127-A2/A3 Page 3 of 5 Copyright 2012, Ford Global Technologies, Inc. 3.2 OVEN AGED (168 h at 121 C) A2 A3 Tensile Strength Change, % 0 to +25 0 to +25 Flexibility, F5 Must pass Must pass Compressibility & Recovery (ASTM F 36, Procedure “B“, 400 psi (2.8 MPa) load) Compressibility, % 25-40 20-32

6、 Recovery, % min 75 75 3.3 IMMERSION IN ASTM Oil No. 1 (168 h at 121 C) Specimen shall be buffed to 0.125 +/- 0.005 in (3.18 +/- 0.13 mm) if sample sheets or parts exceed this thickness. ESE-M8G127- A2 A3 (or ESE-M8G129-A) Volume Change, % max - 10 - 12 Tensile Strength Change, % max - 30 - 30 Flexi

7、bility, F5 Must pass Must pass Compressibility & Recovery (ASTM F 36, Procedure “B“, 400 psi (2.8 MPa) load) Compressibility, % 30 50 20 - 40 Recovery, % min 65 65 ENGINEERING MATERIAL SPECIFICATION ESE-M8G127-A2/A3 Page 4 of 5 Copyright 2012, Ford Global Technologies, Inc. 3.4 IMMERSION IN ASTM Oil

8、 No. 3 (168 h at 121 C) Specimen shall be buffed to 0.125 +/- 0.005 in (3.18 +/- 0.13 mm) if sample sheets or parts exceed this thickness. Volume Change, % max 30 30 Tensile Strength Change, % max - 60 - 60 Flexibility, F5 Must pass Must pass Compressibility & Recovery (ASTM F 36, Procedure “B“, 400

9、 psi (2.8 MPa) load) Compressibility, % 32 70 25 - 45 Recovery, % min 60 60 3.5 DIMENSIONAL STABILITY Test Method: 3 test specimens approximately 1 x 7.5 in (25 x 190 mm) are cut from sample sheets. Specimens from finished gaskets may differ in width and length and should not include bolt holes. The

10、se specimens are preconditioned in a controlled humidity room (or in a closed chamber with gentle mechanical circulation of the air) for 70 h minimum at 21 to 29 C and 50 +/- 5% R.H. Specimens are then measured for original length. Expose vertically hung test specimens in a controlled temperature an

11、d humidity chamber for 7 days at 38 C and 95-100% R.H., followed by 7 days at 38 C and 5- 10% R.H. Length of test specimens is measured after each of these two 7 day exposure periods. Average % change in length after each exposure is calculated, based on the original lengths previously determined. P

12、ermissible dimensional changes are as follows: After 7 days At 38 C and 95-100% R.H.,% max + 1.8 + 1.8 At 38 C and 5-10% R.H., % max - 1.8 - 1.8 3.6 CORK GRAIN SIZE (ASTM E 11) Medium grain size - will pass #10 sieve and will be retained on a #40 sieve. The supplier will certify the grain size. ENGI

13、NEERING MATERIAL SPECIFICATION ESE-M8G127-A2/A3 Page 5 of 5 Copyright 2012, Ford Global Technologies, Inc. 3.7 INFRARED SPECTROPHOTOMETRY, BINDER IR spectra and thermograms established for initial approval shall constitute the reference standard and shall be kept on file at the designated material l

14、aboratory. All samples shall produce IR spectra and thermograms that correspond to the reference standard when tested under the same conditions. 3.8 SUPPLIERS RESPONSIBILITY All materials supplied to this specification must be equivalent in all characteristics to the material upon which approval was

15、 originally granted. Prior to making any changes to the material originally approved under this specification, whether or not such changes affect the materials ability to meet the specification requirements, the Supplier shall notify the affected Purchasing, and Materials Engineering activities (wit

16、h reasons) of the proposed changes. Upon notification of the Company, further instructions will be provided. Note: Suppliers should be prepared to provide test data and samples demonstrating compliance to this specification, if requested. Substance restrictions imposed by regulations or Company dire

17、ction applies to the materials addressed by this document. The restrictions are identified in Restricted Substance Management Standard WSS-M99P9999-A1. 4. APPROVAL OF SUPPLIERS: Materials defined by this specification for direct supply to the Company must have prior approval. Certain materials subco

18、ntracted by part suppliers may also require prior approval. These include materials critical to the Companys business for regulatory, safety, environmental or compatibility requirements or contractual agreements. Suppliers desiring approval of their materials shall first obtain an expression of inte

19、rest from Purchasing, Design or Materials Engineering activity. Upon request, the Supplier shall submit a completed copy of their laboratory test reports, signed by a qualified and authorized representative of the test facility, demonstrating full compliance with all the requirements of this specification.

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 13286-7-2004 Unbound and hydraulically bound mixtures - Part 7 Cyclic load triaxial test for unbound mixtures German version EN 13286-7 2004《松散的和液力粘合的混合料 第7部分 松散混合料用循环装载三轴向试.pdf DIN EN 13286-7-2004 Unbound and hydraulically bound mixtures - Part 7 Cyclic load triaxial test for unbound mixtures German version EN 13286-7 2004《松散的和液力粘合的混合料 第7部分 松散混合料用循环装载三轴向试.pdf
  • DIN EN 13288-2010 Food processing machinery - Bowl lifting and tilting machines - Safety and hygiene requirements German version EN 13288 2005+A1 2009《食品加工机械 滚梯和倾斜机器 安全性和卫生要求 德文版本E.pdf DIN EN 13288-2010 Food processing machinery - Bowl lifting and tilting machines - Safety and hygiene requirements German version EN 13288 2005+A1 2009《食品加工机械 滚梯和倾斜机器 安全性和卫生要求 德文版本E.pdf
  • DIN EN 13289-2013 Pasta processing plants - Dryers and coolers - Safety and hygiene requirements German version EN 13289 2001+A1 2013《面食加工设备 干燥器和冷却器 安全性和卫生要求 德文版本13289-2001+A1-2013.pdf DIN EN 13289-2013 Pasta processing plants - Dryers and coolers - Safety and hygiene requirements German version EN 13289 2001+A1 2013《面食加工设备 干燥器和冷却器 安全性和卫生要求 德文版本13289-2001+A1-2013.pdf
  • DIN EN 13290-1-1999 Aerospace series - Space project management General requirements - Part 1 Policy and principles German version EN 13290-1 1999《航空航天系列 航天项目管理 一般要求 第1部分 政策和原则》.pdf DIN EN 13290-1-1999 Aerospace series - Space project management General requirements - Part 1 Policy and principles German version EN 13290-1 1999《航空航天系列 航天项目管理 一般要求 第1部分 政策和原则》.pdf
  • DIN EN 13293-2003 en 7312 Transportable gas cylinders - Specification for the design and construction of refillable transportable seamless normalised carbon manganese steel gas cyl.pdf DIN EN 13293-2003 en 7312 Transportable gas cylinders - Specification for the design and construction of refillable transportable seamless normalised carbon manganese steel gas cyl.pdf
  • DIN EN 13294-2002 Products and systems for the protection and repair of concrete structures - Test methods - Determination of stiffening time German version EN 13294 2002《混凝土构件的保护和.pdf DIN EN 13294-2002 Products and systems for the protection and repair of concrete structures - Test methods - Determination of stiffening time German version EN 13294 2002《混凝土构件的保护和.pdf
  • DIN EN 13295-2004 Products and systems for the protection and repair of concrete structures - Test methods - Determination of resistance to carbonation German version EN 13295 2004.pdf DIN EN 13295-2004 Products and systems for the protection and repair of concrete structures - Test methods - Determination of resistance to carbonation German version EN 13295 2004.pdf
  • DIN EN 13298-2003 Railway applications - Suspension components - Helical suspension springs steel German version EN 13298 2003《轨道交通 悬挂零部件 螺旋钢制悬挂弹簧》.pdf DIN EN 13298-2003 Railway applications - Suspension components - Helical suspension springs steel German version EN 13298 2003《轨道交通 悬挂零部件 螺旋钢制悬挂弹簧》.pdf
  • DIN EN 13299-2000 Fertilizers - Determination of flow rate German version EN 13299 2000《肥料 流动速率的测定》.pdf DIN EN 13299-2000 Fertilizers - Determination of flow rate German version EN 13299 2000《肥料 流动速率的测定》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1