FORD ESF-M1L6-A-2003 COPPER WIRE BATTERY CABLE - #1 GAGE TO BE USED WITH FORD WSS-M99P1111-A 《电池电缆用铜丝》.pdf

上传人:sumcourage256 文档编号:746122 上传时间:2019-01-14 格式:PDF 页数:3 大小:72.25KB
下载 相关 举报
FORD ESF-M1L6-A-2003 COPPER WIRE BATTERY CABLE - #1 GAGE  TO BE USED WITH FORD WSS-M99P1111-A  《电池电缆用铜丝》.pdf_第1页
第1页 / 共3页
FORD ESF-M1L6-A-2003 COPPER WIRE BATTERY CABLE - #1 GAGE  TO BE USED WITH FORD WSS-M99P1111-A  《电池电缆用铜丝》.pdf_第2页
第2页 / 共3页
FORD ESF-M1L6-A-2003 COPPER WIRE BATTERY CABLE - #1 GAGE  TO BE USED WITH FORD WSS-M99P1111-A  《电池电缆用铜丝》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATION Material Name Specification Number Date Action Revisions 2003 04 24 Revised Para 3.0 inserted; Para 3.9, 3.10, 3.11, 3.12, 3.13, 4 deleted 1991 01 31 DE00 E 00107002086 Revised 3.5 std para added J. Huebner 1963 08 16 CTS4-58846-1 Released Printed copies are uncon

2、trolled Page 1 of 3 Copyright 2003, Ford Global Technologies, Inc. COPPER WIRE, BATTERY CABLE - #1 GAGE ESF-M1L6-A 1. SCOPE The material defined by this specification is a #1 gage stranded, insulated battery cable. 2. APPLICATION This specification was released originally for material used as a batt

3、ery cable on heavy duty installations. 3. REQUIREMENTS 3.0 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1111-A). 3.1 CABLE SIZE The finished cable diameter shall not exceed SA

4、E limits for type SGR cable. 3.2 INSULATION COLOR Black, unless otherwise specified on engineering drawing 3.3 CABLE QUALITY Shall meet all of the requirements listed herein and must be equal to the original approved sample. 3.4 WIRE QUALITY Shall consist of bare ESF-M2L1-A, soft or annealed round c

5、opper wire, prior to bunching or stranding. ENGINEERING MATERIAL SPECIFICATION ESF-M1L6-A Page 2 of 3 Copyright 2003, Ford Global Technologies, Inc. 3.5 CABLE CONSTRUCTION Shall consist of a minimum of 252 strands (nominal 259 strands) of #25 gage bare copper wire having a minimum area of 39.07 mm2.

6、 The strands are to be layed in rope construction and served with 0.08 mm minimum paper or polyester film tape with a 12 1/2 % minimum overlap, with no individual group containing more than 20 % of the total strands. 3.6 INSULATION QUALITY The finished cable shall be covered with a good grade of ela

7、stomer which meets SAE type SGR requirements. The insulation must have a 1.52 mm wall nominal thickness. 3.7 RESISTIVITY, FINISHED CABLE, max 443 microohms/m at 20 C 3.8 PHYSICAL AND ELECTRICAL PROPERTIES Three samples of cable are required. One for each of the high temperature, low temperature and

8、oil absorption tests. All samples are subjected to the dielectric breakdown test at the completion of their respective tests. These samples are 0.6 m in length with 25 mm of insulation stripped from both ends. 3.8.1 High Temperature Resistance No fracture or splitting of the insulation Test Method:

9、Suspend sample over a 254 mm mandrel with a 2.72 kg weight at each end. Soak at 121 +/- 2 C for 120 h in a circulating air oven. Cool to 23 +/- 2 C, remove the weight and bend the sample around the mandrel in a reverse direction at a rate not exceeding 1 turn per minute until a 180 bend is completed

10、. 3.8.2 Low Temperature Resistance No fracture or splitting of the insulation Test Method: Reduce temperature of a straight piece of sample to - 34 C at a rate not to exceed 68 C per minute. Hold for 3 h and then wrap around a 254 mm mandrel for 180 at a rate of 1 turn per 10 s. 3.8.3 Oil Absorption

11、 Resistance Cable dia shall not increase more than 15% nor shall the insulation fracture or split Test Method: Immerse sample to within 38 mm from the end into a solution of 50% kerosene and 50% SAE 10W engine oil for 20 h at 49 +/- 2 C. Wrap sample around a 254 mm mandrel for 180 . ENGINEERING MATE

12、RIAL SPECIFICATION ESF-M1L6-A Page 3 of 3 Copyright 2003, Ford Global Technologies, Inc. 3.8.4 Dielectric Resistance No rupture of the insulation Test Method: Join exposed ends of sample and immerse loop to within 150 mm of ends in a 5% salt bath (salt content by weight at 27 C). Soak 5 h and then apply 500 V (RMS) 60 cps (Hz) between sample conductor and salt bath for 1 minute.

展开阅读全文
相关资源
猜你喜欢
  • ASTM D4990-1997a(2005)e1 Standard Specification for Coal Tar Glass Felt Used in Roofing and Waterproofing《屋顶和防水用柏油玻璃油毡的标准规范》.pdf ASTM D4990-1997a(2005)e1 Standard Specification for Coal Tar Glass Felt Used in Roofing and Waterproofing《屋顶和防水用柏油玻璃油毡的标准规范》.pdf
  • ASTM D4990-1997a(2013) Standard Specification for Coal Tar Glass Felt Used in Roofing and Waterproofing《屋顶和防水用柏油玻璃油毡的标准规格》.pdf ASTM D4990-1997a(2013) Standard Specification for Coal Tar Glass Felt Used in Roofing and Waterproofing《屋顶和防水用柏油玻璃油毡的标准规格》.pdf
  • ASTM D4991-2007 Standard Test Method for Leakage Testing of Empty Rigid Containers by Vacuum Method《用真空法进行空瓶罐泄漏试验的标准试验方法》.pdf ASTM D4991-2007 Standard Test Method for Leakage Testing of Empty Rigid Containers by Vacuum Method《用真空法进行空瓶罐泄漏试验的标准试验方法》.pdf
  • ASTM D4991-2007(2015) Standard Test Method for Leakage Testing of Empty Rigid Containers by Vacuum Method《采用过真空法对空硬质容器进行泄漏试验的标准试验方法》.pdf ASTM D4991-2007(2015) Standard Test Method for Leakage Testing of Empty Rigid Containers by Vacuum Method《采用过真空法对空硬质容器进行泄漏试验的标准试验方法》.pdf
  • ASTM D4992-2007 Standard Practice for Evaluation of Rock to be Used for Erosion Control《侵蚀控制用岩石评定的标准实施规范》.pdf ASTM D4992-2007 Standard Practice for Evaluation of Rock to be Used for Erosion Control《侵蚀控制用岩石评定的标准实施规范》.pdf
  • ASTM D4992-2014 Standard Practice for Evaluation of Rock to be Used for Erosion Control《评估侵蚀控制用岩石的标准实施规程》.pdf ASTM D4992-2014 Standard Practice for Evaluation of Rock to be Used for Erosion Control《评估侵蚀控制用岩石的标准实施规程》.pdf
  • ASTM D4992-2014e1 Standard Practice for Evaluation of Rock to be Used for Erosion Control《评估侵蚀控制用岩石的标准实践规程》.pdf ASTM D4992-2014e1 Standard Practice for Evaluation of Rock to be Used for Erosion Control《评估侵蚀控制用岩石的标准实践规程》.pdf
  • ASTM D4993-1989(2003) Standard Practice for Calculation and Adjustment of Silica (SiO2) Scaling for Reverse Osmosis《为反向渗透标定二氧化硅的计算和校正》.pdf ASTM D4993-1989(2003) Standard Practice for Calculation and Adjustment of Silica (SiO2) Scaling for Reverse Osmosis《为反向渗透标定二氧化硅的计算和校正》.pdf
  • ASTM D4993-2008 Standard Practice for Calculation and Adjustment of Silica (SiO2) Scaling for Reverse Osmosis《为反向渗透标定二氧化硅的计算和校正的标准实施规程》.pdf ASTM D4993-2008 Standard Practice for Calculation and Adjustment of Silica (SiO2) Scaling for Reverse Osmosis《为反向渗透标定二氧化硅的计算和校正的标准实施规程》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1