FORD FLTM BP 154-1-2001 EXTRACTABLES IN FUEL HOSE.pdf

上传人:tireattitude366 文档编号:747455 上传时间:2019-01-14 格式:PDF 页数:3 大小:116.16KB
下载 相关 举报
FORD FLTM BP 154-1-2001 EXTRACTABLES IN FUEL HOSE.pdf_第1页
第1页 / 共3页
FORD FLTM BP 154-1-2001 EXTRACTABLES IN FUEL HOSE.pdf_第2页
第2页 / 共3页
FORD FLTM BP 154-1-2001 EXTRACTABLES IN FUEL HOSE.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、FORD LABORATORY TEST METHOD BP 154-01 2001 O925 EXTRACTABLES IN FUEL HOSE Revised Editorial - no technical change A. Cockman Application This method is used to determine the fuel soluble and insoluble material that is released when a polymeric fuel or vapor hose is exposed to a fueValcohol blend. 1.

2、 2. 3. 4. 5. 6. 7. 8. 9. 1 o. 1. 2. Equipment Required Oven: class A type with fuel handling capability. Hose plugs: 6 required. Hose clamps: 6 required. Parr type pressure vessels: Sized to hold fuel line, plugs and clamps. Heating block: Meeting ASTM D 381/ISO 6246. Gum beakers: Meeting ASTM D 381

3、/ISO 6246. Laboratory Balance: 0.1 mg accuracy Volumetric flask: 1 OOmL capacity Wash bottle: capable of use with CE1 O test fuel Full face shield, gloves, and other required safety equipment. Procedure Prepare at least 150mL of test fuel using the ratio of CEIO fuel: Water of (99:l) by volume. Cut

4、at least 3 samples of hose that each have an internal volume of IOOmL, (excluding the volume of the plugs). I Date I Action I Revisions I Copynght02001, Ford Global Technologies, Inc FORD LABORATORY TEST METHOD BP 154-01 3. 4. 5. 6. 7. 8. 9. 1 o. 11. 12. 13. 14. 15. 16. 17. Insert a plug into one en

5、d of each hose and secure with a clamp. Carefully pour 50 mL of the test fuel into the open end of each tube. Insert the second plug into each hose and secure with a clamp. Place the sealed hose vertically into the pressure vessel (small diameter tubing may be coiled inside the vessel). Secure the p

6、ressure vessel, and place in a preheated 60 “C oven for 24 hours. At the end of the first 24 hour exposure, carefully remove the pressure vessel from the oven, and allow it to cool to room temperature. Carefully release any pressure in the vessel, open the vessel, and invert each sample so that the

7、portion of the hose previously exposed to vapor is now exposed to liquid fuel. Secure the pressure vessel, and place it back in the 60 “C oven for an additional 24 hours. At the end of the second 24 hour exposure, carefully remove the pressure vessel from the oven, and allow it to cool to room tempe

8、rature. Carefully release any pressure in the vessel, open the vessel, and remove the tube assembly. Gently agitate the liquid contents for 30 to 45 seconds by rocking end-to-end, occasionally rolling the sample to assure that all of the I.D. of hose receives agitation. Carefully remove one clamp an

9、d plug and pour the liquid contents into a weighed gum beaker. Remove the second clamp and plug from the tube, and using the wash bottle, wash the inside of the tube three times with approximately 10mL of CEIO per wash. The wash solution should be collected into the gum beaker. Repeat steps 13 and 1

10、4 for each of the samples, rinse each sample into a separate beaker. Cover the beakers lightly with aluminum foil and allow to stand for 16 hours. Observe for the presence of particles, cloudiness or flocculent in the fuel, and record. Also record any changes to the inside of the fuel tube. Page 2 o

11、f 3 Copynght02001, Ford Global Technologies, Inc FORD LABORATORY TEST METHOD BP 154-01 18. Allow the samples to evaporate under a hood to approximately 50mL. 19. Perform unwashed gum content (ASTM D 381) on each sample, include washed gums if any material was noted in step 17. Substitute Fuel C for

12、nheptane as the wash solvent when running the washed gums. 20. On samples being submitted for initial approval, perform Infrared analysis of the unwashed and washed gums (if present) and keep the trace on file. Calculation Calculate the amount of extractables by the following equation: Extractables

13、(g/1 OOmL/m2) = (grams of residue x 2) / inside area of tube in m2 Report Report the soluble and insoluble extractables to the nearest 0.1 g/100mL/m2. Report individual value for each run, along with the mean value. Report any visual changes to the fuel or hose during the test. Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly. Each party is responsible for determining proper use and handling in its facilities. Page 3 of 3 Copynght02001, Ford Global Technologies, Inc

展开阅读全文
相关资源
猜你喜欢
  • ASTM A372 A372M-2010 Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels《薄壁压力容器用碳素钢及合金钢锻件标准规格》.pdf ASTM A372 A372M-2010 Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels《薄壁压力容器用碳素钢及合金钢锻件标准规格》.pdf
  • ASTM A372 A372M-2012 Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels《薄壁压力容器用碳素钢及合金钢锻件标准规格》.pdf ASTM A372 A372M-2012 Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels《薄壁压力容器用碳素钢及合金钢锻件标准规格》.pdf
  • ASTM A372 A372M-2013 Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels《薄壁压力容器用碳素钢及合金钢锻件标准规格》.pdf ASTM A372 A372M-2013 Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels《薄壁压力容器用碳素钢及合金钢锻件标准规格》.pdf
  • ASTM A372 A372M-2015 Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels《薄壁压力容器用碳素钢和合金钢锻件的标准规格》.pdf ASTM A372 A372M-2015 Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels《薄壁压力容器用碳素钢和合金钢锻件的标准规格》.pdf
  • ASTM A372 A372M-2016 Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels《薄壁压力容器用碳素钢及合金钢锻件的标准规格》.pdf ASTM A372 A372M-2016 Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels《薄壁压力容器用碳素钢及合金钢锻件的标准规格》.pdf
  • ASTM A376 A376M-2006 Standard Specification for Seamless Austenitic Steel Pipe for High-Temperature Central-Station Service《高温中心站设备用无缝奥氏钢管标准规范》.pdf ASTM A376 A376M-2006 Standard Specification for Seamless Austenitic Steel Pipe for High-Temperature Central-Station Service《高温中心站设备用无缝奥氏钢管标准规范》.pdf
  • ASTM A376 A376M-2006(2011) Standard Specification for Seamless Austenitic Steel Pipe for High-Temperature Central-Station Service《高温中心站用无缝奥氏钢管标准规格》.pdf ASTM A376 A376M-2006(2011) Standard Specification for Seamless Austenitic Steel Pipe for High-Temperature Central-Station Service《高温中心站用无缝奥氏钢管标准规格》.pdf
  • ASTM A376 A376M-2012 Standard Specification for Seamless Austenitic Steel Pipe for High-Temperature Central-Station Service《高温中心站用无缝奥氏钢管标准规格》.pdf ASTM A376 A376M-2012 Standard Specification for Seamless Austenitic Steel Pipe for High-Temperature Central-Station Service《高温中心站用无缝奥氏钢管标准规格》.pdf
  • ASTM A376 A376M-2013 Standard Specification for Seamless Austenitic Steel Pipe for High-Temperature Service《高温中心站用无缝奥氏体钢管标准规格》.pdf ASTM A376 A376M-2013 Standard Specification for Seamless Austenitic Steel Pipe for High-Temperature Service《高温中心站用无缝奥氏体钢管标准规格》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1