FORD FLTM BS 001-01-2000 INHIBITION OF CORROSION《缓蚀作用》.pdf

上传人:jobexamine331 文档编号:747482 上传时间:2019-01-14 格式:PDF 页数:3 大小:26.13KB
下载 相关 举报
FORD FLTM BS 001-01-2000 INHIBITION OF CORROSION《缓蚀作用》.pdf_第1页
第1页 / 共3页
FORD FLTM BS 001-01-2000 INHIBITION OF CORROSION《缓蚀作用》.pdf_第2页
第2页 / 共3页
FORD FLTM BS 001-01-2000 INHIBITION OF CORROSION《缓蚀作用》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 FORD LABORATORY TEST METHOD BS 001-01 Date Action Revisions 2000 11 10 Revised Editorial no technical change A. Cockman 1992 08 05 Printed copies are uncontrolled Page 1 of 3 Copyright 2000, Ford Global Technologies, Inc. INHIBITION OF CORROSION Application This procedure is used to test the abilit

2、y of Kraft paper packaging materials, treated with volatile corrosion inhibitors, to prevent rusting or corrosion of ferrous metal surfaces. Outline of Test Clean air shall be passed at a controlled rate (see Procedure) through the test apparatus. The air shall be humidified in the apparatus by bubb

3、ling through a 1 % sodium chloride solution, then passed through an empty chamber serving as a spray trap, a second chamber cont aining a mounted steel specimen or, if desired, an unmounted round bar specimen as specified, and then through a third chamber lined with inhibitor paper. The warm, humid

4、air now containing the vapor phase corrosion inhibitor shall be led into a fourth ch amber where it flows over the polished surface of a specially prepared steel specimen. The fourth tube contains an additional steel specimen in direct contact with the inhibitor paper. The apparatus used in this tes

5、t is shown on the attached sketch. Thi s test will be run simultaneously on a blank specimen located in the second chamber, one contacting the inhibited packaging material and one protected by the volatile inhibitor in the fourth tube. If the blank specimen does not corrode, the test results s hall

6、be considered invalid and the test shall be repeated. Apparatus and Equipment The apparatus and equipment for the inhibition of corrosion test shall consist of the following: 1. Steel Specimen - SAE 1045 cold finished steel, round bar, 5/8 inch di ameter, 1/2 inch long and free of rust. It shall be

7、rinsed for 2 minutes in C.P. benzene and then mounted in Bakelite in the manner employed for metallographic examination or, if desired, an unmounted specimen may be used. When a mounted specimen is used, the finished Bakelite block should have a total height of 1 1/4 inch and diameter of 1 1/32 inch

8、 The cleaned specimens shall be ground on a flat surface power grinder until a circular section of the metal is exposed evenly. The surface shall be hand polished in accordance with good metallographic practice and care shall be taken to avoid touching the steel surface after the machine grinding s

9、tep. The prepared specimen shall be submerged in boiling C.P. benzene for 1 2 minutes, removed and placed imme diately in the test equipment or stored in a desiccator over anhydrous calcium sulfate. If storage of more than 24 h occurs, repeat the preparation of the specimen, starting with the hand p

10、olishing, using No. O Flint paper. Used specimens shall be recove red by machine grinding to remove rust or pits and then hand polishing. Three specimens are required for each test. FORD LABORATORY TEST METHOD BS 001-01 Page 2 of 3 Copyright 2000, Ford Global Technologies, Inc. 2. Surgical Rubber Tu

11、bing - 1/4 inch I.D. by 7/16 inch O.D., initially cleaned in hot (150 F) 5 % sodium hydroxide solution. 3. Pyrex G lass Tubing - 7 mm O.D. and 4 1/2 mm I.D. for connections. 4. Black Rubber Stoppers - No. 7 with a 6 mm hole, initially cleaned with hot (150 F) 5 % sodium hydroxide solution. 5. 500 mL

12、 Gas Wash Bottle - Inlet and outlet tubes are conveniently equipped with glass 12/5 ball joint connections. 6. Four Glass Cylinders - 6 inches long, 31 mm I.D. and 35 mm O.D., held in place around the wash bottle by pressure sensitive tape. 7. The exit air line from the oven shall be connected to a

13、liquid trap in the ove n if the exit line is higher than the exit from the last cylinder. 8. The glass tubing in the stoppers shall extend 1/2 inch into the cylinders except for the fourth cylinder where the inlet tube extends to 1/2 inch above the steel surface. An indentatio n or opening shall be

14、provided in the exit tubing from the fourth cylinder to allow passage of air. 9. Glass Rings - 25 mm O.D. and 7/16 inch long shall be placed in the bottom of the second and fourth cylinders to help support the test specimen. 10. Air Pump - Allowing air flow (at 1 1/2 lb) to be 20 cu inches/minute. A

15、 maximum of three test fixtures may be connected to each pump. 11. Direct reading laboratory flow meter. Conditioning and Test Conditions All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/ - 2 C and 50 +/ - 5 % relative humidity for not less than 2

16、4 h prior to testing and tested under the same conditions unless otherwise specified. Procedure 1. Wash all glass parts with a test tube brush, using soap and water. Rinse in distilled water and dry in an oven at 215 - 220 F. 2. Immerse the rubber stoppers with glass and rubber tubing connections in

17、 three successive containers of hot (140 - 150 F) distilled water and dry in an oven. No te: Replace rubber tubing between cylinders 3 and 4 for each test. FORD LABORATORY TEST METHOD BS 001-01 Page 3 of 3 Copyright 2000, Ford Global Technologies, Inc. 3. Reassemble the equipment and place a 1 % NaC

18、l solution in distilled water in the gas wash bottle so that the level is 3 inches above the air tube inlet. 4. Tightly line cylinders 3 an d 4, each with a 4 inch by 4 3/4 inch sheet of inhibitor paper with the treated side facing inward. 5. Place a 1 inch diameter glass ring on top of the exit sto

19、pper on cylinder 4, and place a 1 1/4 inch diameter circle of test material, treated side up, a bove the ring so that the steel surface of the bottom block specimen presses against this paper and forms contact points where the paper touches the exit tubing. 6. Introduce the other block (for testing

20、vapor inhibition) through the top of cylinder 4, wi th the steel surface facing upward and 1/2 inch below the inlet tubing. 7. Pass air through a filter of cotton and 6 ft of coiled copper tubing to a flow meter and into the apparatus at a rate of 30 - 35 mL/min. (30 mL min preferred.) 8. Subject th

21、e appa ratus to the following cycle by shifting the copper coil, wash bottle and cylinder into an atmosphere maintained at the following temperatures: 2 h at 75 F 24 h at 40 F 24 h at 100 F 48 h at 150 F 9. At the end of the test, shut off the air and imm ediately inspect the test specimens. The pac

22、kaging material shall be considered acceptable if no deposits appear on the face of the test specimens from cylinder 4 which cannot be readily removed and if no rust is observed on the face of the specimen when examined under a 20 diameter magnification. Rust on the interface between the plastic and steel on the mounted specimens will not be considered as failure of the material. Chemicals, materials, parts, and equipment referenced in this document must be us ed and handled properly. Each party is responsible for determining proper use and handling in its facilities.

展开阅读全文
相关资源
猜你喜欢
  • EN 14651-2005 en Test method for metallic fibre concrete - Measuring the flexural tensile strength (limit of proportionality (LOP) residual) (Incorporates Amendment A1 2007)《金属纤维混凝.pdf EN 14651-2005 en Test method for metallic fibre concrete - Measuring the flexural tensile strength (limit of proportionality (LOP) residual) (Incorporates Amendment A1 2007)《金属纤维混凝.pdf
  • EN 14652-2005 en Water conditioning equipment inside buildings - Membrane separation devices - Requirements for performance safety and testing (Incorporates Amendment A1 2007)《建筑物内.pdf EN 14652-2005 en Water conditioning equipment inside buildings - Membrane separation devices - Requirements for performance safety and testing (Incorporates Amendment A1 2007)《建筑物内.pdf
  • EN 14653-1-2005 en Manually operated hydraulic shoring systems for groundwork support - Part 1 Product specifications《土方工程支撑用手动液压支撑系统 第1部分 产品规范》.pdf EN 14653-1-2005 en Manually operated hydraulic shoring systems for groundwork support - Part 1 Product specifications《土方工程支撑用手动液压支撑系统 第1部分 产品规范》.pdf
  • EN 14653-2-2005 en Manually operated hydraulic shoring systems for groundwork support - Part 2 Assessment by calculation or test《土方工程支撑用手动液压支撑系统 第2部分 通过计算或试验评定》.pdf EN 14653-2-2005 en Manually operated hydraulic shoring systems for groundwork support - Part 2 Assessment by calculation or test《土方工程支撑用手动液压支撑系统 第2部分 通过计算或试验评定》.pdf
  • EN 14654-1-2014 en Management and control of operational activities in drain and sewer systems outside buildings - Part 1 Cleaning《建筑外部排水及污水管道系统操作活动管理和控制 第一部分 清洁》.pdf EN 14654-1-2014 en Management and control of operational activities in drain and sewer systems outside buildings - Part 1 Cleaning《建筑外部排水及污水管道系统操作活动管理和控制 第一部分 清洁》.pdf
  • EN 14654-2-2010 en Management and control of cleaning operations in drains and sewers - Part 2 Rehabilitation《排水管和下水道清洗作业的管理和控制 第2部分 修复》.pdf EN 14654-2-2010 en Management and control of cleaning operations in drains and sewers - Part 2 Rehabilitation《排水管和下水道清洗作业的管理和控制 第2部分 修复》.pdf
  • EN 14655-2005 en Food processing machinery - Baguette slicers - Safety and hygiene requirements (Incorporates Amendment A1 2010)《食品加工机械 法式棍式面包切片机 安全和卫生要求 包含修改件A1-2010》.pdf EN 14655-2005 en Food processing machinery - Baguette slicers - Safety and hygiene requirements (Incorporates Amendment A1 2010)《食品加工机械 法式棍式面包切片机 安全和卫生要求 包含修改件A1-2010》.pdf
  • EN 14656-2006 en Safety of machinery - Safety requirements for extrusion presses for steel and non-ferrous metals (Incorporates Amendment A1 2010)《机械安全 钢和有色金属用挤压机的安全要求 包含修改件A1-2010.pdf EN 14656-2006 en Safety of machinery - Safety requirements for extrusion presses for steel and non-ferrous metals (Incorporates Amendment A1 2010)《机械安全 钢和有色金属用挤压机的安全要求 包含修改件A1-2010.pdf
  • EN 14658-2005 en Continuous handling equipment and systems - General safety requirements for continuous handling equipment for opencast lignite mining (Incorporates Amendment A1 20.pdf EN 14658-2005 en Continuous handling equipment and systems - General safety requirements for continuous handling equipment for opencast lignite mining (Incorporates Amendment A1 20.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1