FORD FLTM BU 154-02-2016 WINDSHIELD CUT-OUT EVALUATION VIA QUICK KNIFE ADHESION TEST (FLTM BU 154-01).pdf

上传人:eventdump275 文档编号:747558 上传时间:2019-01-14 格式:PDF 页数:2 大小:51.83KB
下载 相关 举报
FORD FLTM BU 154-02-2016 WINDSHIELD CUT-OUT EVALUATION VIA QUICK KNIFE ADHESION TEST (FLTM BU 154-01).pdf_第1页
第1页 / 共2页
FORD FLTM BU 154-02-2016 WINDSHIELD CUT-OUT EVALUATION VIA QUICK KNIFE ADHESION TEST (FLTM BU 154-01).pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 FORD LABORATORY TEST METHOD BU 154-02 Date Action Revisions Rev 01 2016 07 08 Revised See Summary of Revisions J. Richardson, P. Konopka, NA 2006 12 11 Activated H. Kon, M. Mehandru Copyright 2016, Ford Global Technologies, LLC Page 1 of 2 WINDSHIELD CUT-OUT EVALUATION VIA QUICK KNIFE ADHESION TEST

2、 (FLTM BU 154-01) Application This procedure is used to prepare painted test unit and validate the integrity of the direct glazing system through production process conditions. Test units will be subject to evaluation via Quick Knife Adhesion Test, FLTM BU 154-01. Abstract Process body-in-white unit

3、 through production Paint process. Install windshield, backlite, and quarter glass, if applicable, to painted unit using production/design intent direct glazing materials and process. Evaluate integrity of bond to validate direct glazing material compatibility to production paint system. Apparatus a

4、nd Materials Required BIW body(s) with closure panels Production Paint Shop Production Paint Materials Oven Temperature Profiles Paint film build measuring device Production Glass (Windshield, Backlite, Qtr Glass) Production Glass installation aids o Masking Tape o “Piano Keys“ Production Direct Gla

5、zing Materials o Glass Primers o Urethane Adhesive Supporting documents: o FLTM BU 154-01 o AVP-T118-001 FORD LABORATORY TEST METHOD BU 154-02 Copyright 2016, Ford Global Technologies, LLC Page 2 of 2 Procedure Painted Unit Preparation Procedure: Oven Profile for test unit (or from same production s

6、hift) shall be made available to confirm production representative processing conditions. 1. Process test unit through complete Paint Shop process a. Measure film builds on glass bonding flanges/surfaces per Program specific requirements for each paint layer b. Basecoat color will be determined by P

7、aint Engineering and Material Engineering prior to build c. Number of units required will be determined by Paint Engineering, Material Engineering prior to build (typically two units in two colors required) 2. Allow test unit to reach temperature equilibrium 3. Determine the longest length of time f

8、rom paint shop to glass applicator cell. 4. Ensure vehicle has the longest length of time between paint shop and glass applicator cell. Glass Installation Procedure: 1. Install production glass location aids, e.g. “piano keys“ to test unit 2. Install Glass(es) to test unit. Note: Ensure that Process

9、 Standards for direct glazing materials are followed, e.g. Do not exceed open-time of adhesive (10 min. typical) due to transport and installation time. Option A: Robotic-applied primer(s) and urethane adhesive. 1. Abort glass(es) with primer(s) and urethane adhesive from automation cell(s) 2. Insta

10、ll glass(es) to unit using manual installation process Option B: Robotic-applied primer(s) and Manual-applied urethane adhesive 1. Abort glass(es) with primer(s) from automation cell(s) 2. Manually apply urethane adhesive to glass(es) per process/design 3. Install glass(es) to unit using manual inst

11、allation process Option C: Manual-applied primer(s) and urethane adhesive 1. Manually apply glass primer(s) to glass(es) 2. Manually apply urethane adhesive to glass(es) per process/design 3. Install glass(es) to unit using manual installation process 3. Apply Masking Tape to glass(es) and adjacent

12、body sheet metal to fixture glass(es) 4. Store test unit in outdoor plant conditions and allow urethane adhesive to cure 10 to 14 days. Evaluation Procedure: 1. Remove glass(es) using standard glass removal/replacement procedure while taking care to cut the urethane adhesive as close to glass as pos

13、sible 2. Evaluate urethane adhesive bond to glass bonding flange/surfaces using FLTM BU154-01 a. Quantify and record (in linear inches and percentage of total bond length) any loss of adhesion of urethane adhesive to paint b. Quantify and record (in linear inches and percentage of total bond length)

14、 any loss of adhesion of paint layers c. Quantify and record (in linear inches and percentage of total bond length) any loss of cohesion within paint layers d. Report Oven Profile and Film Build Measurements Summary of Revisions 2016 07 08 Added items 3 and 4 to the painted unit preparation procedure Added item 4 to the glass installation procedure

展开阅读全文
相关资源
猜你喜欢
  • DIN CEN TS 15518-4-2013 Winter maintenance equipment - Road weather information system - Part 4 Test methods for stationary equipment German version CEN TS 15518-4 2013《冬季维护设备 道路气象.pdf DIN CEN TS 15518-4-2013 Winter maintenance equipment - Road weather information system - Part 4 Test methods for stationary equipment German version CEN TS 15518-4 2013《冬季维护设备 道路气象.pdf
  • DIN CEN TS 15523-2011 Postal Services - Statement of Mailing submission German version CEN TS 15523 2011《邮政服务 邮寄提交的声明 德文版 CEN TS 15523-2011》.pdf DIN CEN TS 15523-2011 Postal Services - Statement of Mailing submission German version CEN TS 15523 2011《邮政服务 邮寄提交的声明 德文版 CEN TS 15523-2011》.pdf
  • DIN CEN TS 15531-4-2011 Public transport - Service interface for real-time information relating to public transport operations - Part 4 Functional service interfaces Facility Monit.pdf DIN CEN TS 15531-4-2011 Public transport - Service interface for real-time information relating to public transport operations - Part 4 Functional service interfaces Facility Monit.pdf
  • DIN CEN TS 15531-5-2011 Public transport - Service interface for real-time information relating to public transport operations - Part 5 Functional service interfaces - Situation Ex.pdf DIN CEN TS 15531-5-2011 Public transport - Service interface for real-time information relating to public transport operations - Part 5 Functional service interfaces - Situation Ex.pdf
  • DIN CEN TS 15534-2-2007 Wood-plastics composites (WPC) - Part 2 Characterisation of WPC materials German version CEN TS 15534-2 2007《木塑复合材料(WPS) 第2部分 木塑复合材料特征》.pdf DIN CEN TS 15534-2-2007 Wood-plastics composites (WPC) - Part 2 Characterisation of WPC materials German version CEN TS 15534-2 2007《木塑复合材料(WPS) 第2部分 木塑复合材料特征》.pdf
  • DIN CEN TS 15548-1-2012 3750 Thermal insulation products for building equipment and industrial installations - Determination of thermal resistance by means of the guarded hot plate.pdf DIN CEN TS 15548-1-2012 3750 Thermal insulation products for building equipment and industrial installations - Determination of thermal resistance by means of the guarded hot plate.pdf
  • DIN CEN TS 1555-7-2014 Plastics piping systems for the supply of gaseous fuels - Polyethylene (PE) - Part 7 Guidance for assessment of conformity German version CEN TS 1555-7 2013《.pdf DIN CEN TS 1555-7-2014 Plastics piping systems for the supply of gaseous fuels - Polyethylene (PE) - Part 7 Guidance for assessment of conformity German version CEN TS 1555-7 2013《.pdf
  • DIN CEN TS 15568-2007 Foodstuffs - Methods of analysis for the detection of genetically modified organisms and derived products - Sampling strategies German version CEN TS 15568 20.pdf DIN CEN TS 15568-2007 Foodstuffs - Methods of analysis for the detection of genetically modified organisms and derived products - Sampling strategies German version CEN TS 15568 20.pdf
  • DIN CEN TS 15597-2-2012 Winter maintenance equipment - Spreading machines (gritting machines) - Part 2 Requirements for distribution and its test German version CEN TS 15597-2 2012.pdf DIN CEN TS 15597-2-2012 Winter maintenance equipment - Spreading machines (gritting machines) - Part 2 Requirements for distribution and its test German version CEN TS 15597-2 2012.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1