FORD FLTM EU-BP 052-01-2001 OZONE RESISTANCE OF THE TYRE SIDEWALLS《轮胎侧壁的抗臭氧性》.pdf

上传人:wealthynice100 文档编号:747837 上传时间:2019-01-14 格式:PDF 页数:3 大小:107.31KB
下载 相关 举报
FORD FLTM EU-BP 052-01-2001 OZONE RESISTANCE OF THE TYRE SIDEWALLS《轮胎侧壁的抗臭氧性》.pdf_第1页
第1页 / 共3页
FORD FLTM EU-BP 052-01-2001 OZONE RESISTANCE OF THE TYRE SIDEWALLS《轮胎侧壁的抗臭氧性》.pdf_第2页
第2页 / 共3页
FORD FLTM EU-BP 052-01-2001 OZONE RESISTANCE OF THE TYRE SIDEWALLS《轮胎侧壁的抗臭氧性》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、FORD LABORATORY TEST METHOD EU-BP 052-01 Date 2001 0822 1994 02 28 OZONE RESISTANCE OF THE TYRE SIDEWALLS Action Revisions Revised Editorial - no technical change A. Cockman Application This method is used to assess the ozone resistance of passenger vehicle tyre sidewalls under static conditions. Ap

2、paratus Required Ozone Generator and Test Chamber Capable of maintaining ozone concentration of 50 p.p.h.m. +/- 5 (by volume) and a temperature of 38 +/- 1 OC with the necessary measuring and control devices, as described in FLTM EU BP 1 O1 - 01. The nominal ozonised air velocity over the surface of

3、 the specimen must be 60 cm per second. Clamping Device As shown in Figure B. Magnifying Glass x2. Conditioning and Test Conditions All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 OC and 50 +/- 5 % relative humidity for not less than 24 h pri

4、or to testing and tested under the same conditions unless otherwise specified. Procedure 1. Cut 3 test specimens radially from the sidewall of the tyre under test. The bead wire must not be removed (see Figure A) Note: The part of the specimen adjacent to the shoulder of the tyre must not exceed 10

5、mm thickness, and when necessary the outer face of the part must be ground or cut to give the required maximum thickness. Ensure that the temperature of the ground surface does not exceed 40 OC during the grinding operation. All cut and ground surfaces must be coated with an elastic ozone resistant

6、compound. Copynght02001, Ford Global Technologies, Inc FORD LABORATORY TEST METHOD EU-BP 052-01 2. Place the specimens in the test fixture, ensuring that they are a minimum of 20 mm apart (see Figure B). 3. Condition specimens for 72 burs in the dark at 20 +/- 2 OC, in an atmosphere substantially fr

7、ee of ozone. 4. Immediately place the fixture into the ozone chamber maintained at 50 p.p.h.m. +/- 5 of ozone, a temperature of 38 +/- 1 OC and a nominal ozonised air velocity over the surface of the specimen of 60 cm per second, for a period of 70 hours. Evaluation After exposure, remove the specim

8、ens retained in the fixture and examine. Classification of Ratina Interpretation O No checking or cracking visible under 2X magnification. 1 Checking or cracking not visible to the unaided eye but visible at 2X magnification. 2 Small cracks visible to the unaided eye. 3 Medium size cracks or checks

9、visible to the unaided eye. Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly. Each party is responsible for determining proper use and handling in its facilities. Page 2 of 3 Copynght02001, Ford Global Technologies, Inc FORD LABORATORY TEST MET

10、HOD EU-BP 052-01 OZONE RESISTANCE OF THE TYRE SIDEWALLS Sketch “A Material: non-ferrous metal or wood provided with an ozone resistant cover The specimen length (Y) is limited by the height of the tyre sidewalls and will be chosen as the maximum value as stated below: Dimension X Dimension Y 90 80 7

11、0 140 125 110 Note: In cases where no specimen with the side length (Y) of 11 O mm can be prepared out of the sidewalls, the maximum possible specimen length must be chosen. The dimension X is taken equivalent to the proportion 0.65 (X) to 1 .O0 (Y). Page 3 of 3 Copynght02001, Ford Global Technologies, Inc

展开阅读全文
相关资源
猜你喜欢
  • DL T 5283-2012 Safety operation code for construction equipment of hydropower and water conservancy engineering - Concrete pump truck-mounted《水电水利工程施工机械安全操作规程 混凝土泵车》.pdf DL T 5283-2012 Safety operation code for construction equipment of hydropower and water conservancy engineering - Concrete pump truck-mounted《水电水利工程施工机械安全操作规程 混凝土泵车》.pdf
  • DL T 5284-2012 Guide for construction and acceptance of carbon fibre complex core aluminium stranded wire《碳纤维复合芯铝绞线施工工艺及验收导则》.pdf DL T 5284-2012 Guide for construction and acceptance of carbon fibre complex core aluminium stranded wire《碳纤维复合芯铝绞线施工工艺及验收导则》.pdf
  • DL T 5286-2013 Construction technology guide for tension stringing of ± 800kV overhead transmission line《±800kV 架空输电线路张力架线施工工艺导则》.pdf DL T 5286-2013 Construction technology guide for tension stringing of ± 800kV overhead transmission line《±800kV 架空输电线路张力架线施工工艺导则》.pdf
  • DL T 5287-2013 Construction technology guide for the assembly and erection of the steel towers of ± 800kV overhead transmission line《±800kV 架空输电线路铁塔组立施工工艺导则》.pdf DL T 5287-2013 Construction technology guide for the assembly and erection of the steel towers of ± 800kV overhead transmission line《±800kV 架空输电线路铁塔组立施工工艺导则》.pdf
  • DL T 5288-2013 Construction technology guide for the assembly and erection of the steel towers of large crossing of overhead transmission line《架空输电线路大跨越工程跨越塔组立施工工艺导则》.pdf DL T 5288-2013 Construction technology guide for the assembly and erection of the steel towers of large crossing of overhead transmission line《架空输电线路大跨越工程跨越塔组立施工工艺导则》.pdf
  • DL T 5289-2013 Construction technology guide to the assembly and erection of the steel towers of 1000kV overhead transmission line《1000kV架空输电线路铁塔组立施工工艺导则》.pdf DL T 5289-2013 Construction technology guide to the assembly and erection of the steel towers of 1000kV overhead transmission line《1000kV架空输电线路铁塔组立施工工艺导则》.pdf
  • DL T 5290-2013 Construction technology guide for tension stringing of 1000kV overhead transmission line《1000kV架空输电线路张力架线施工工艺导则》.pdf DL T 5290-2013 Construction technology guide for tension stringing of 1000kV overhead transmission line《1000kV架空输电线路张力架线施工工艺导则》.pdf
  • DL T 5291-2013 Crimping technology guide for conductor and ground wire of 1000kV power transmission and transformation project《1000kV输变电工程导地线液压施工工艺规程》.pdf DL T 5291-2013 Crimping technology guide for conductor and ground wire of 1000kV power transmission and transformation project《1000kV输变电工程导地线液压施工工艺规程》.pdf
  • DL T 5292-2013 Code of system commissioning for 1000kV AC transmission and transformation project《1000kV交流输变电工程系统调试规程》.pdf DL T 5292-2013 Code of system commissioning for 1000kV AC transmission and transformation project《1000kV交流输变电工程系统调试规程》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1