1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev. 0 2011 08 23 Activated M. Dumitrescu, FNA Controlled document at www.MATS Copyright 2011, Ford Global Technologies, LLC Page 1 of 2 FABRIC, ACE II PATTERN, WARP KNIT WRS-M1H1129-B 25% PIR CONTENT UNLAMINATED 1. SCOPE The material defined
2、 by this specification is ACE II pattern, warp knit. The fabric is made with 25% Post Industrial recycled yarn. 2. APPLICATION This specification was released originally for material used as an interior trim fabric for P415 2011 and 2013 seat bolster. The fabric is backcoated. 3. REQUIREMENTS In add
3、ition, to the requirements listed herein, the fabric shall meet all requirements of WSS-M8P18-A1/A4 as applicable. 3.1 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1111-A). Th
4、is specification contains 25% recycled content as defined by WRS-M99P42-A2. The remaining portion of the material can come from virgin sources. 3.2 FABRIC CONSTRUCTION 3.2.1 Fabric Count, +/- 5% tolerance (ASTM D 3887) Wales 141 wales/10 cm Courses 267 courses/10 cm 3.2.2 Fabric Weight, +/- 10 % tol
5、erance (FLTM BN 106-01) Face fabric 309 g/m2 Backcoat 30 g/m2 Total 339 g/m2 3.3 COMPOSITION (ASTM D 629) Tolerance as specified in WSS-M8P18-A1/A4 Fabric 100% Polyester Backcoat EVA backcoat ENGINEERING MATERIAL SPECIFICATION WRS-M1H1129-B Controlled document at www.MATS Copyright 2011, Ford Global
6、 Technologies, LLC Page 2 of 2 3.4 YARN CONSTRUCTION (ASTM D 1244) Face 78 dtexf36 (sol. dye polyester yarn) Middle 78 dtexf36 (sol dye polyester yarn) Back 78 dtexf36 (polyester text yarn) 4th 78dtexf36 (polyester 100% PIR yarn) 3.5 METHOD OF DYEING Piece Dye/Sol dye 3.6 FINISHING OPERATIONS Knit,H
7、eatset,Setmake,Dye,Bulk, Finish treatment, Back coat, tenter 4. GENERAL INFORMATION This information given below is provided for clarification and assistance in meeting the requirements of this specification. Contact for questions concerning Engineering Material Specifications 4.1 Purchase department will ensure that the material defined in this specification and shipped to any one assembly plant will be produced by one supplier only.