FORD WSB-M11A41-A-2012 SOLDER 81 Sn 16 8 Cu 2 5 Zn TO BE USED WITH FORD WSS-M99P1111-A .pdf

上传人:rimleave225 文档编号:748861 上传时间:2019-01-14 格式:PDF 页数:3 大小:50.47KB
下载 相关 举报
FORD WSB-M11A41-A-2012 SOLDER 81 Sn 16 8 Cu 2 5 Zn  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第1页
第1页 / 共3页
FORD WSB-M11A41-A-2012 SOLDER 81 Sn 16 8 Cu 2 5 Zn  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第2页
第2页 / 共3页
FORD WSB-M11A41-A-2012 SOLDER 81 Sn 16 8 Cu 2 5 Zn  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions 2012 07 25 N-Status No replacement A. Wedepohl, NA 2005 02 07 Revised Inserted 3.0; Deleted 3.1, 3.4, 4 1989 09 15 Released NB00E00371818002 R.D.Moore, J.A.F. NAAO. J.P.C.Lines EAO Controlled document at www.MATS Copyright 2012, Ford Global T

2、echnologies, LLC Page 1 of 3 SOLDER, 81 Sn/16.8 Cu/2.5 Zn NOT FOR NEW DESIGN WSB-M11A41-A 1. SCOPE The material defined by this specification is a tin based alloy, developed to comply with the revised OSHA lead standards, virtually eliminating both the lead and arsenic content of previous body solde

3、rs. The tin base solder has a shiny, bright appearance. It is stiffer and more lightweight than previous solders. 2. APPLICATION This specification was originally released for material used as either a sheet steel body fill or as a repair solder. 3. REQUIREMENTS 3.0 STANDARD REQUIREMENTS FOR PRODUCT

4、ION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1111-A). 3.2 SOLDER COMPOSITION (weight percent) Copper 16.3 -17.3 Zinc 2.0 - 3.0 Iron 1.0 max Arsenic 0.02 max Lead 0.1 max Other 0.1 max Tin Remainder Test Metho

5、d: Energy dispersive x-ray fluorescence spectroscopy. 3.3 QUALITY The solder furnished under this specification shall be homogeneous in composition and structure and shall be free from impurities harmful to the working characteristics of the material. 4. GENERAL INFORMATION The information given bel

6、ow is provided for clarification and assistance in meeting the requirements of this specification. 4.1 NEW SOURCE APPROVAL The vendor must do the following: Contact the Body Resident Engineer at the production plant, to determine if there is a need for new suppliers. ENGINEERING MATERIAL SPECIFICATI

7、ON WSB-M11A41-A Copyright 2012, Ford Global Technologies, LLC Page 2 of 3 If there is interest, a plant tryout coordinated by Body and Assembly Engineering is required to determine functional acceptance. If the tryout was satisfactory, the Body Resident Engineer is to notify the Body Materials and C

8、orrosion Engineering Department, in writing, of the successful tryout, and the need for approval of a new supplier. The Body Materials and Corrosion Engineering Department, B&CE will then finalize the approval. 4.2 PHYSICAL PROPERTIES Pasty Range 245 - 316 C Liquidus, min 399C Working Range 218 - 31

9、6 C 4.3 SOLDER APPLICATION PROCEDURE After tinning and wiping the steel surface, apply the solder. It is essential to apply the solder to the body as quickly as possible to maintain the fine grain consistency of the solder. Do not overwork the solder as this can cause the tin to oxidize leaving mino

10、r pinholes and splits in the solder fill. Proper application technique can help prevent complications during the solder finishing operations. Consult the process sheet for tin based solders. 4.4 PADDLES AND PADDLE LUBRICANTS Use a paddle to apply and shape the solder. Different types of paddles are

11、available for forming solder to the various contours of the body. The condition of the paddle used affects the quality of the body fill or repair. The surface of the paddle should be smooth and consistent for best results. Do not use paddles with deeply scored surface patterns. Always keep paddles l

12、ubricated (water soluble paddle lubricant desired for ease of cleanup). 4.5 SOLDER APPLICATION Preheat the tinned surface with a torch to 150 - 200 C. Apply heat by moving the flame over the joint area in a fanning motion. Then firmly pat the solder into place with the paddle. Note: Do not try to sm

13、ooth the solder. This type of solder tends to separate if it is pulled. A flat mushing technique is best. 4.6 SALVAGE Do not mix lead-free solder offal with lead type solder offal. This results in a product mix that cannot be used. 4.7 PROBLEM AREAS If there are pits in the solder fill area, the pro

14、blem may be related to one or more of the following factors: Even heat was not maintained throughout the solder application procedure. The solder was worked too cold. The solder application procedure was completed too slowly, causing coarse-grain solder. Excessive paddle lubricant was used, causing

15、pits and porosity in the solder. The paddle was dragged across the solder instead of patting it into place after the solder had cooled. ENGINEERING MATERIAL SPECIFICATION WSB-M11A41-A Copyright 2012, Ford Global Technologies, LLC Page 3 of 3 The preliminary operations were not performed correctly, c

16、ausing foreign material contamination or poor solder bonding. Note 1: It is very important to determine the cause of the solder pit problem so it can be corrected. This will help prevent chronic solder finishing difficulties. Note 2: (Production body fill applications): Extreme care should be maintained while melting the solder rods in the slush pan. Do not stir or mix for this creates air bubbles which cause solder pits.

展开阅读全文
相关资源
猜你喜欢
  • ASHRAE OR-05-1-3-2005 Impact of Fouling and Cleaning onn Plate Fin and Spine Fin Heat Exchangers Performance《污垢及清洗onn板翅式和脊椎翅式换热器性能的影响》.pdf ASHRAE OR-05-1-3-2005 Impact of Fouling and Cleaning onn Plate Fin and Spine Fin Heat Exchangers Performance《污垢及清洗onn板翅式和脊椎翅式换热器性能的影响》.pdf
  • ASHRAE OR-05-10-1-2005 Brazed Plate Heat Exchangers and Their Applications《钎焊板式换热器及其应用》.pdf ASHRAE OR-05-10-1-2005 Brazed Plate Heat Exchangers and Their Applications《钎焊板式换热器及其应用》.pdf
  • ASHRAE OR-05-10-2-2005 Thermal and Hydraulic Characteristics of Brazed Plate Heat Exchangers - Part I Review of Single-Phase and Two-Phase Adiabatic and Flow Boiling Characteristic.pdf ASHRAE OR-05-10-2-2005 Thermal and Hydraulic Characteristics of Brazed Plate Heat Exchangers - Part I Review of Single-Phase and Two-Phase Adiabatic and Flow Boiling Characteristic.pdf
  • ASHRAE OR-05-10-2005 Symposium on Advances in Brazed-Plate Heat Exchangers for HVAC&R Applications《在HVAC和R应用上的钎焊板式换热器的进步的研讨会》.pdf ASHRAE OR-05-10-2005 Symposium on Advances in Brazed-Plate Heat Exchangers for HVAC&R Applications《在HVAC和R应用上的钎焊板式换热器的进步的研讨会》.pdf
  • ASHRAE OR-05-10-3-2005 Thermal and Hydraulic Characteristics of Brazed Plate Heat Exchangers - Part II Current Research on Evaporators at KTH《钎焊板式换热器的热和水力特性-第2部分 目前的研究对蒸发器在KTH》.pdf ASHRAE OR-05-10-3-2005 Thermal and Hydraulic Characteristics of Brazed Plate Heat Exchangers - Part II Current Research on Evaporators at KTH《钎焊板式换热器的热和水力特性-第2部分 目前的研究对蒸发器在KTH》.pdf
  • ASHRAE OR-05-10-4-2005 CFD Simulation of Heat Transfer in Compact Brazed Plate Heat Exchangers《紧凑型钎焊板式换热器传热的CFD模拟》.pdf ASHRAE OR-05-10-4-2005 CFD Simulation of Heat Transfer in Compact Brazed Plate Heat Exchangers《紧凑型钎焊板式换热器传热的CFD模拟》.pdf
  • ASHRAE OR-05-11-1-2005 Cost-Effective Design of Duel Heat and Energy Recovery Exchangers for 100% Ventalation Air in HVAC Cabinet Units《完全通风HVAC内阁单位的热量和能量回收交换机的 成本效益的设计》.pdf ASHRAE OR-05-11-1-2005 Cost-Effective Design of Duel Heat and Energy Recovery Exchangers for 100% Ventalation Air in HVAC Cabinet Units《完全通风HVAC内阁单位的热量和能量回收交换机的 成本效益的设计》.pdf
  • ASHRAE OR-05-11-2-2005 Evaluation of Demand-Controlled Ventilation and Enthalpy Exchangers in Small Commerical Buildings《在小型商业大厦的通风需求控制和焓交换机的评价》.pdf ASHRAE OR-05-11-2-2005 Evaluation of Demand-Controlled Ventilation and Enthalpy Exchangers in Small Commerical Buildings《在小型商业大厦的通风需求控制和焓交换机的评价》.pdf
  • ASHRAE OR-05-11-2005 Symposium on Energy Recovery Ventilation Energy Humidity and Electronic Implications《能量回收通风的研讨会 能源 湿度 和电子的影响》.pdf ASHRAE OR-05-11-2005 Symposium on Energy Recovery Ventilation Energy Humidity and Electronic Implications《能量回收通风的研讨会 能源 湿度 和电子的影响》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1