GMKOREA EDS-T-5525-2008 FUEL SYSTEM STATIC ELECTRICITY TEST.pdf

上传人:ideacase155 文档编号:757176 上传时间:2019-01-19 格式:PDF 页数:6 大小:110.21KB
下载 相关 举报
GMKOREA EDS-T-5525-2008 FUEL SYSTEM STATIC ELECTRICITY TEST.pdf_第1页
第1页 / 共6页
GMKOREA EDS-T-5525-2008 FUEL SYSTEM STATIC ELECTRICITY TEST.pdf_第2页
第2页 / 共6页
GMKOREA EDS-T-5525-2008 FUEL SYSTEM STATIC ELECTRICITY TEST.pdf_第3页
第3页 / 共6页
GMKOREA EDS-T-5525-2008 FUEL SYSTEM STATIC ELECTRICITY TEST.pdf_第4页
第4页 / 共6页
GMKOREA EDS-T-5525-2008 FUEL SYSTEM STATIC ELECTRICITY TEST.pdf_第5页
第5页 / 共6页
点击查看更多>>
资源描述

1、GM DAEWOO Auto Size of vector force of unit point charge having plus polarity 4.2. Static Charge Meter; Device that measures charge differential between two points as a measure of the electric field 4.3. Electric Charge Sensor; Device that senses fluid flow and computes charge density per area for a

2、verage flow 5. TEST PREPARATION 5.1. TEST EQUIPMENT 13.0 V 0.2 V 6.1.3. Measurement Procedure Prior to test (prior to test temperature soaking), ensure vehicle ready condition. Measure the resistance between the ground and the static charge measurement points. Measurement Points: Assembly areas betw

3、een parts, sharp edge areas, corrosion prevention areas, non-conductive material areas, etc. Fill Aircraft Oil into Fuel Tank and activate Fuel Pump. Use Conductivity Meter to measure conductivity of aircraft oil using unit of Picosiemens/Meter. Measure and record Fuel Flow Pressure. The distance be

4、tween Static Charge Meter and target measurement point shall be 5Cm. Measure plus voltage at each measurement point. At the point of the highest plus voltage, measure its variation over time and record. In general, measurements should be at about 10 minute intervals. However, interval can be varied

5、considering plus voltage variation time. For Cold Test, cold protection clothing shall be worn EDS-T-5525FUEL SYSTEM STATIC ELECTRICITY TEST PAGE: 4/5 ISSUED DATE: 1998. 01. 08 REVISED DATE: 2008. 11. 04 VERSION: 3 GM DAEWOO Auto 13.0 V 0.2 V 6.2.2. Measurement Procedure Move vehicle to Cold Chamber

6、 and replace Fuel Tank with an empty tank. Lift test vehicle with a lift jack by about 30Cm from floor and install a support platform underneath to facilitate test measurement. Here, make sure that the support platform is stably fixed when vehicle is moved a little. Pour in Aircraft oil for testing

7、into Fuel Tank, use power supply to admit test voltage directly to Fuel Pump power line so that other electrical devices are not powered. Eliminate fuel line at Injector end to prevent Aircraft Oil from going into Injector. Use a connection pipe to enable fuel feedback. Allow 24 hour soaking of test

8、 vehicle with Fuel Pump only in operation in the Cold Chamber. Measure Insulation Resistance of non-conductive parts to vehicle body prior to vehicle soaking. Measure and record resistance values of conductive parts. The distance between Static Charge Meter and target measurement points shall be 5Cm

9、. At each measurement point, measure plus voltage. At the point of the most plus voltage measured, record plus voltage variation against time. In general, measurements should be taken at 10 minute interval. However, the interval can be varied in consideration of plus voltage variation time. Upon com

10、pletion of test, replace all parts including Fuel Tank and Fuel Lines of Aircraft Oil flow. 6.3. Fuel Filter Test 6.3.1. Test Preparation Apply 150 psi water pressure on all test samples to check for leakage. Use only samples with no leak for testing. Install test sample as in Figure 3. Figure 3. Fu

11、el Filter Installation EDS-T-5525FUEL SYSTEM STATIC ELECTRICITY TEST PAGE: 5/5 ISSUED DATE: 1998. 01. 08 REVISED DATE: 2008. 11. 04 VERSION: 3 GM DAEWOO Auto & Technology Test Temperature shall be 20 and perform soaking prior to testing for 12 hours at 20 . 6.3.2. Test procedure Measure Conductivity

12、 and Temperature of Aircraft Oil and turn on Fuel Pump. Adjust fuel flow within Fuel Line to be 0.50 gpm 0.02 gpm. Observe Fuel Filter operation for 15 minutes and indicate position of any static discharge. Measure static charge at the point of discharge for 6 hours. Upon completion of testing, ther

13、e shall not be any leakage at water pressure of 150 psi. 7. EVALUATION 7.1. TEST RESULT CRITERIA (after 48 hours of system operation) SAT UNSAT Electric Field Level (KV/m) 3K Note 1) 30K or more Note 1) 30K or more: When Electric Field Level is 30KV/m or higher, there is risk of arc generation betwe

14、en plastic fuel line and grounded vehicle parts. 7.2. Vehicle Grounding All parts/components related to a Fuel System should be made of conductive material as much as possible. When non-conductive material parts are applied, they must be grounded to the vehicle body to prevent static charge generati

15、on. If such requirements have not been satisfied, the above system and vehicle test should be performed. If all fuel system parts are made of conductive materials or have been properly grounded to vehicle body, then measure resistance between all parts and vehicle body. If measured resistance values

16、 are 10 Ohm or less, perform System Test at room temperature (202 ) and Relative Humidity 20% 40 % condition and record static charges generated, 8. INSTRUCTIONS FOR SAFETY The tests defined in this standard involve risks of fire or explosion. Therefore, make sure to use Aircraft Oil specified above and install fire extinguisher near test location prior to testing. 9. REFERENCE MATERIAL SAE J1645

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1