GMW GMW16952-2013 Cowl Grille Flex Fuel Reservoir Access Cover Durability Test Procedure Issue 1 English.pdf

上传人:wealthynice100 文档编号:757946 上传时间:2019-01-19 格式:PDF 页数:8 大小:248.50KB
下载 相关 举报
GMW GMW16952-2013 Cowl Grille Flex Fuel Reservoir Access Cover Durability Test Procedure Issue 1 English.pdf_第1页
第1页 / 共8页
GMW GMW16952-2013 Cowl Grille Flex Fuel Reservoir Access Cover Durability Test Procedure Issue 1 English.pdf_第2页
第2页 / 共8页
GMW GMW16952-2013 Cowl Grille Flex Fuel Reservoir Access Cover Durability Test Procedure Issue 1 English.pdf_第3页
第3页 / 共8页
GMW GMW16952-2013 Cowl Grille Flex Fuel Reservoir Access Cover Durability Test Procedure Issue 1 English.pdf_第4页
第4页 / 共8页
GMW GMW16952-2013 Cowl Grille Flex Fuel Reservoir Access Cover Durability Test Procedure Issue 1 English.pdf_第5页
第5页 / 共8页
点击查看更多>>
资源描述

1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW16952 Cowl Grille Flex Fuel Reservoir Access Cover Durability Test Procedure Copyright 2013 General Motors Company All Rights Reserved August 2013 Page 1 of 8 1 Scope Note: Nothing in this standard supercedes applicable laws and regulations. Note: I

2、n the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. This requirement ensures that the cowl grille access cover for Flex fuel reservoir will work properly during the vehicle life time, remain locked when closed avoiding noise and

3、 other inconvenience during its operation. 1.2 Foreword. This document is the GM Worldwide Air Inlet Panel (AIP) Testing Standard. Its purpose is to establish a common test methodology for AIP Flex Fuel Cover systems to ensure that a high quality world class system is consistently developed and prod

4、uced. This is a living document and any suggestions or revisions will be reviewed and/or updated annually by the AIP Global Subsystem Leadership Team (GSSLT). 1.3 Applicability. This standard applies to cowl grilles that have the cover to access the cold start reservoir used for flex fuel vehicles.

5、This test is defined to check the durability of the cover on the open/close operation during the vehicle life time. This standard applies to all original equipment and replacement Flex Fuel Cover components for passenger cars, Multipurpose Passenger Vehicles (MPV), and trucks. 2 References Note: Onl

6、y the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. GMW3600 2.3 Additional References. GM Security Guidelines 3 Resources 3.1 Facilities. 3.1.1 Calibration. The test facilities and equipment shall be

7、in good working order and shall have a valid calibration label. 3.1.2 Alternatives. Alternative test facilities and equipment may also be used. However, all measuring variables as specified in this standard shall be determined correctly with respect to their physical definition. 3.2 Equipment. Test

8、equipment must be capable to be fully automatized to perform the open/close operation besides operating inside a climatic chamber. 3.2.1 Thermal Chamber large enough to contain one complete test bucks and capable of -40 C to +100 C with controlled humidity. 3.2.2 Flex Fuel Cover Fixture. Copyright G

9、eneral Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16952 Copyright 2013 General Motors Company All Rights Reserved August 2013 Page 2 of 8 Figure 1: Fl

10、ex Fuel Cover Fixture 3.3 Test Vehicle/Test Piece. Three (3) AIPs with Flex Fuel Cover. 3.3.1 Unless otherwise specified, five samples of components or systems shall be tested. 3.3.2 All components/systems used in testing shall be within drawing specifications and have supporting data prior to start

11、 of test. 3.4 Test Time. Calendar time: 10 days Test hours: 40 hours Coordination hours: 4 hours 3.5 Test Required Information. 3.5.1 GM Validation is to be notified of test failures within 24 hour period of occurrence. 3.5.2 Supplier to develop five phase document for all test failures. 3.5.3 Produ

12、ct Security. Security protocol for the test vehicle must be followed per GM Security Guidelines. 3.6 Personnel/Skills. Not applicable. 4 Procedure 4.1 Preparation. Not applicable. 4.2 Conditions. The cowl grille must be fixed in a device simulating the car condition of installation (including push-p

13、ins, screws, etc.) 4.2.1 Environmental Conditions. The following conditions apply to all tests unless otherwise specified: Temperature: +23 C 3 C. Voltage: VNOMINAL 0.3 V at motor terminals. Humidity 50% to 75% unless otherwise specified. Each sample should be tested for 2 lives. Each life should be

14、 performed according to the environmental conditions and quantity of cycles below: 60% (240 cycles) at 23 C 3 C. 10% (40 cycles) at 80 C 3 C. 10% (40 cycles) at -30 C 3 C (for South American and Hot countries, use -15 C, see Deviations). 20% (80 cycles) at 38 C 3 C, 95% Relative Humidity (RH) 5% RH.

15、 4.2.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports, etc. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for Resale

16、No reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16952 Copyright 2013 General Motors Company All Rights Reserved August 2013 Page 3 of 8 4.3 Instructions. 4.3.1 Unlock the clips simulating the users fingers (size, direction, velocity and pres

17、sure), pull (or push) the cover until it is fully open and close the cover again, applying pressure on its surface simulating the effect of the human hand, until the clips are completely locked. 4.3.2 Keep the test cycles on hold while the temperature of the chamber is changing from one condition to

18、 another. 4.3.3 Check for each environmental condition if the locking clips lose their function and if the hinges present deformations. 4.3.4 At the end of the test, the cover must keep the open/close function. The locking clips should be capable of keeping the cover locked by itself when closed. 5

19、Data 5.1 Calculations. Not applicable. 5.2 Interpretation of Results. Not applicable. 5.3 Test Documentation. 5.3.1 Samples of components or material released to this standard shall be tested for conformity with the requirements of this standard and approved by the responsible GM department prior to

20、 the start of delivery of production level components or materials. Any change to the component or material, e.g., design, function, properties, manufacturing process and/or location of manufacture requires a new release of the product. It is the sole responsibility of the supplier to provide the cu

21、stomer, unsolicited, with documentation of any change or modification to the product/process, and to apply for a new release. If not otherwise agreed to, the entire verification test shall be repeated and documented by the supplier prior to start of delivery of the modified or changed product. In so

22、me cases, a shorter test can be agreed to between the responsible GM department and the supplier. 5.3.2 Record measurements and results on the data sheet in Appendix A as specified by individual procedures. 5.3.3 Document the test results in a test certificate or report. Test reports shall include a

23、ll of the following: test equipment serial numbers, calibration information, test data sheets in Appendix A and attached to Appendix B, description of test material (including design revision, lot or batch, options, etc.,) test specification date, pertinent setup information, and photographs. The Su

24、pplier shall write evaluation reports to document the results of all their validation activities and shall make the test results and evaluation reports available to GM Engineers upon request. See GMW3600. All reports are to be in the English language. Document all test results, parameters and findin

25、gs. 5.3.4 Photos of the test fixture and test sample. 6 Safety This standard may involve hazardous materials, operations, and equipment. This standard does not propose to address all the safety problems associated with its use. It is the responsibility of the user of this standard to establish appro

26、priate safety and health practices and determine the applicability of regulatory limitations prior to use. 7 Notes 7.1 Glossary. 5-Phase document: Supplier to use current approved 5-phase to be provided by GM Product Engineering. 5-Phase to include at a minimum 1. Issue Description. 2. Root Cause An

27、alysis. 3. Containment. 4. Implementation. 5. Evaluation/Validation. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16952 Copyright 2013

28、 General Motors Company All Rights Reserved August 2013 Page 4 of 8 7.2 Acronyms, Abbreviations, and Symbols. AIP Air Inlet Panel GSSLT Global Subsystem Leadership Team MPV Multipurpose Passenger Vehicle RH Relative Humidity 8 Coding System This standard shall be referenced in other documents, drawi

29、ngs, etc., as follows: Test to GMW16952 9 Release and Revisions This standard was originated in April 2013. It was first approved by the AIP GSSLT in August 2013. It was first published in August 2013. Issue Publication Date Description (Organization) 1 AUG 2013 Initial publication. Copyright Genera

30、l Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16952 Copyright 2013 General Motors Company All Rights Reserved August 2013 Page 5 of 8 Appendix A: Datas

31、heet Data Sheet A1: Cowl Grille Flex Fuel Reservoir Access Cover Durability Results Sample No. Initial Measurements (Ambient Temperature) Locking Effort Unlocking Effort - clip 1 Unlocking Effort - clip 2 240 cycles (Ambient Temperature) Measurement Locking Effort Unlocking Effort - clip 1 Unlocking

32、 Effort - clip 2 80 C soaking (minimum 4 hours) 40 cycles (80 C) Measurement Locking Effort Unlocking Effort - clip 1 Unlocking Effort - clip 2 -15 C soaking (minimum 4 hours) 40 cycles (-30 C) Measurement Locking Effort Unlocking Effort - clip 1 Unlocking Effort - clip 2 38 C/95% RH soaking (minimu

33、m 4 hours) 80 cycles (38 C/95% RH) Measurement Locking Effort Unlocking Effort - clip 1 Unlocking Effort - clip 2 Ambient Temperature soaking (minimum 4 hours) Final Measurements - 1st life Locking Effort Unlocking Effort - clip 1 Unlocking Effort - clip 2 1st Life Test Conclusion 240 cycles (Ambien

34、t Temperature) Measurement Locking Effort Unlocking Effort - clip 1 Unlocking Effort - clip 2 Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARD

35、S GMW16952 Copyright 2013 General Motors Company All Rights Reserved August 2013 Page 6 of 8 80 C soaking (minimum 4 hours) 40 cycles (80 C) Measurement Locking Effort Unlocking Effort - clip 1 Unlocking Effort - clip 2 -15 C soaking (minimum 4 hours) 40 cycles (-30 C) Measurement Locking Effort Unl

36、ocking Effort - clip 1 Unlocking Effort - clip 2 38 C/95% RH soaking (minimum 4 hours) 80 cycles (38 C/95% RH) Measurement Locking Effort Unlocking Effort - clip 1 Unlocking Effort - clip 2 Ambient Temperature soaking (minimum 4 hours) Final Measurements - 2nd life Locking Effort Unlocking Effort -

37、clip 1 Unlocking Effort - clip 2 2nd Life Test Conclusion Replicate datasheet for each sample. If running more than 2 lives, make appropriate changes to the datasheet. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networkin

38、g permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16952 Copyright 2013 General Motors Company All Rights Reserved August 2013 Page 7 of 8 Appendix B: Test Setup Example Figure B1: Flex Fuel Cover Test Setup Example Copyright General Motors Company Provided by IHS under l

39、icense with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16952 Copyright 2013 General Motors Company All Rights Reserved August 2013 Page 8 of 8 Deviations In case of South American markets or hot count

40、ries (countries where the minimum temperature is never below -15 C), the minimum temperature of the test should be -15 C instead of -30 C. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ETSI TS 124 327-2014 Digital cellular telecommunications system (Phase 2+) Universal Mobile Telecommunications System (UMTS) LTE Mobility between 3GPP Wireless Local Area Network (.pdf ETSI TS 124 327-2014 Digital cellular telecommunications system (Phase 2+) Universal Mobile Telecommunications System (UMTS) LTE Mobility between 3GPP Wireless Local Area Network (.pdf
  • ETSI TS 124 327-2014 Digital cellular telecommunications system (Phase 2+) Universal Mobile Telecommunications System (UMTS) LTE Mobility between 3GPP Wireless Local Area Network (_1.pdf ETSI TS 124 327-2014 Digital cellular telecommunications system (Phase 2+) Universal Mobile Telecommunications System (UMTS) LTE Mobility between 3GPP Wireless Local Area Network (_1.pdf
  • ETSI TS 124 333-2016 Universal Mobile Telecommunications System (UMTS) LTE Proximity-services (ProSe) Management Objects (MO) (V13 4 0 3GPP TS 24 333 version 13 4 0 Release 13)《通用移.pdf ETSI TS 124 333-2016 Universal Mobile Telecommunications System (UMTS) LTE Proximity-services (ProSe) Management Objects (MO) (V13 4 0 3GPP TS 24 333 version 13 4 0 Release 13)《通用移.pdf
  • ETSI TS 124 333-2017 Universal Mobile Telecommunications System (UMTS) LTE Proximity-services (ProSe) Management Objects (MO) (V14 0 0 3GPP TS 24 333 version 14 0 0 Release 14)《通用移.pdf ETSI TS 124 333-2017 Universal Mobile Telecommunications System (UMTS) LTE Proximity-services (ProSe) Management Objects (MO) (V14 0 0 3GPP TS 24 333 version 14 0 0 Release 14)《通用移.pdf
  • ETSI TS 124 333-2018 Universal Mobile Telecommunications System (UMTS) LTE Proximity-services (ProSe) Management Objects (MO) (V15 1 0 3GPP TS 24 333 version 15 1 0 Release 15).pdf ETSI TS 124 333-2018 Universal Mobile Telecommunications System (UMTS) LTE Proximity-services (ProSe) Management Objects (MO) (V15 1 0 3GPP TS 24 333 version 15 1 0 Release 15).pdf
  • ETSI TS 124 334-2016 Universal Mobile Telecommunications System (UMTS) LTE Proximity-services (ProSe) User Equipment (UE) to ProSe function protocol aspects Stage 3 (V13 5 0 3GPP T.pdf ETSI TS 124 334-2016 Universal Mobile Telecommunications System (UMTS) LTE Proximity-services (ProSe) User Equipment (UE) to ProSe function protocol aspects Stage 3 (V13 5 0 3GPP T.pdf
  • ETSI TS 124 334-2017 Universal Mobile Telecommunications System (UMTS) LTE Proximity-services (ProSe) User Equipment (UE) to ProSe function protocol aspects Stage 3 (V14 0 0 3GPP T.pdf ETSI TS 124 334-2017 Universal Mobile Telecommunications System (UMTS) LTE Proximity-services (ProSe) User Equipment (UE) to ProSe function protocol aspects Stage 3 (V14 0 0 3GPP T.pdf
  • ETSI TS 124 334-2018 Universal Mobile Telecommunications System (UMTS) LTE Proximity-services (ProSe) User Equipment (UE) to ProSe function protocol aspects Stage 3 (V15 1 0 3GPP T.pdf ETSI TS 124 334-2018 Universal Mobile Telecommunications System (UMTS) LTE Proximity-services (ProSe) User Equipment (UE) to ProSe function protocol aspects Stage 3 (V15 1 0 3GPP T.pdf
  • ETSI TS 124 337-2016 Universal Mobile Telecommunications System (UMTS) LTE IP Multimedia (IM) Core Network (CN) subsystem IP Multimedia Subsystem (IMS) inter-UE transfer Stage 3 (V.pdf ETSI TS 124 337-2016 Universal Mobile Telecommunications System (UMTS) LTE IP Multimedia (IM) Core Network (CN) subsystem IP Multimedia Subsystem (IMS) inter-UE transfer Stage 3 (V.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1