INTERN CEMS GT-17-2009 Oil Compatibility of Paint《油漆的油兼容性》.pdf

上传人:feelhesitate105 文档编号:785915 上传时间:2019-01-29 格式:PDF 页数:1 大小:83.86KB
下载 相关 举报
INTERN CEMS GT-17-2009 Oil Compatibility of Paint《油漆的油兼容性》.pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 This document is restricted and may not be sent outside Navistar, Inc. or reproduced without permission from Corporate Technical Standards. Suppliers are required to assume all patent liability. 2009 by Navistar, Inc. AUGUST 2009 Page 1 of 1 NAVISTAR, INC. CEMS (CORPORATE ENGINEERING MATERIAL SPECI

2、FICATION) NUMBER: CEMS GT-17 TITLE: Oil Compatibility of Paint CURRENT ISSUE DATE: August 2009 WRITTEN/REVIEWED BY: Materials Engineering APPROVED BY: Materials Engineering SUPERSEDES ISSUE OF: August 2001 PRINTED COPIES OF THIS DOCUMENT MUST BE VERIFIED FOR CURRENT REVISION This specification may i

3、nvolve hazardous materials, equipment, and procedures. This specification does not purport to address all of the safety issues associated with its use. The user is responsible to consult appropriate safety and health practices and to determine the applicability of regulatory limits prior to use. Cha

4、nge Notice: Replaced “International Truck and Engine Corporation” with “Navistar, Inc.” per corporate directive. 1.0 SCOPE This is a method for evaluating the ability of paint to cover oily substrates. 2.0 APPARATUS Recirculating oven capable of maintaining a temperature up to 93 3C (200 5F). 3.0 MA

5、TERIAL 3.1 Bonderite CD-10 or Bonderite 958 zinc phosphated steel panels, 100 x 300 mm (4 x 12 inches), available from Advanced Coatings Technologies, 273 Industrial Drive, Hillsdale, Michigan 49242. 3.2 SAE 10W30 Series 3 engine oil or equivalent 3.3 Absorbent paper, Kleenix, Kimwipes or equivalent

6、 4.0 PROCEDURE 4.1 Dip two panels in the engine oil to a depth equivalent to one half the panel length. 4.2 Remove the panels and allow to drain in vertical position for 15 minutes. 4.3 Place panels vertically in a recirculating oven for 30 minutes at 88 to 93 C (190 to 200 F) 4.4 Remove the panels

7、and allow to cool in still air at 21 to 27 C (70 to 80 F). 4.5 Using absorbent paper, remove excess oil from bottom edge of the panels. 4.6 Prepare two panels according to the method specified for the grade tested in Test Method GT-13, panel preparation, except eliminate the cleaning and priming ste

8、ps. 4.7 After drying, age the prepared panels in a recirculating oven for 72 hours at 49 3 C (120 5 F). Remove and cool to 21 to 27 C (70 to 80 F). 4.8 Examine the panels: any evidence of cratering, paint film “crawl” or dissolution on either the oiled or unoiled portions of the panel will constitute a failure. 5.0 REPORT Report whether the paint passes or fails this test. Copyright Navistar International Corporation Provided by IHS under license with INTERNNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS ISO 4392-2-2002 Hydraulic fluid power - Determination of characteristics of motors - Startability《液压流体动力 电动机特性的测定 稳定性》.pdf BS ISO 4392-2-2002 Hydraulic fluid power - Determination of characteristics of motors - Startability《液压流体动力 电动机特性的测定 稳定性》.pdf
  • BS ISO 4395-2009 Fluid power systems and components - Cylinder piston rod end types and dimensions《液压传动系统和组件 汽缸活塞杆端型号和尺寸》.pdf BS ISO 4395-2009 Fluid power systems and components - Cylinder piston rod end types and dimensions《液压传动系统和组件 汽缸活塞杆端型号和尺寸》.pdf
  • BS ISO 4397-2011 Fluid power connectors and associated components Nominal outside diameters of tubes and nominal hose sizes《液压连接器和相关部件 管子公称外径和公称软管尺寸》.pdf BS ISO 4397-2011 Fluid power connectors and associated components Nominal outside diameters of tubes and nominal hose sizes《液压连接器和相关部件 管子公称外径和公称软管尺寸》.pdf
  • BS ISO 44001-2017 Collaborative business relationship management systems Requirements and framework《业务合作关系管理系统 要求和框架规范》.pdf BS ISO 44001-2017 Collaborative business relationship management systems Requirements and framework《业务合作关系管理系统 要求和框架规范》.pdf
  • BS ISO 4401-2005 Hydraulic fluid power - Four-port directional control valves - Mounting surfaces《液压流体动力 四孔定向控制阀 安装面》.pdf BS ISO 4401-2005 Hydraulic fluid power - Four-port directional control valves - Mounting surfaces《液压流体动力 四孔定向控制阀 安装面》.pdf
  • BS ISO 4406-2017 Hydraulic fluid power Fluids Method for coding the level of contamination by solid particles《液压传动 油液 固体颗粒污染等级代码法》.pdf BS ISO 4406-2017 Hydraulic fluid power Fluids Method for coding the level of contamination by solid particles《液压传动 油液 固体颗粒污染等级代码法》.pdf
  • BS ISO 4407-2002 Hydraulic fluid power - Fluid contamination - Determination of particulate contamination by the counting method using an optical microscope《液压流体动力 流体污染 用光学显微镜计数法测定.pdf BS ISO 4407-2002 Hydraulic fluid power - Fluid contamination - Determination of particulate contamination by the counting method using an optical microscope《液压流体动力 流体污染 用光学显微镜计数法测定.pdf
  • BS ISO 4409-2007 Hydraulic fluid power - Positive-displacement pumps motors and integral transmissions - Methods of testing and presenting basic steady state performance《液压流体传动 变容真.pdf BS ISO 4409-2007 Hydraulic fluid power - Positive-displacement pumps motors and integral transmissions - Methods of testing and presenting basic steady state performance《液压流体传动 变容真.pdf
  • BS ISO 4411-2008 Hydraulic fluid power - Valves - Determination of pressure differential flow characteristics《液压流体动力 阀门 压差 流量特性的测定》.pdf BS ISO 4411-2008 Hydraulic fluid power - Valves - Determination of pressure differential flow characteristics《液压流体动力 阀门 压差 流量特性的测定》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1