ITU-T N 12-1988 MEASUREMENTS TO BE MADE DURING THE LINE - UP PERIOD THAT PRECEDES A SOUND - PROGRAMME TRANSMISSION《测量过程中排成直线时期前的声音程序传输 维护国际声音程序和电视传输电路(研究组IV)》.pdf

上传人:amazingpat195 文档编号:800275 上传时间:2019-02-04 格式:PDF 页数:3 大小:42.26KB
下载 相关 举报
ITU-T N 12-1988 MEASUREMENTS TO BE MADE DURING THE LINE - UP PERIOD THAT PRECEDES A SOUND - PROGRAMME TRANSMISSION《测量过程中排成直线时期前的声音程序传输 维护国际声音程序和电视传输电路(研究组IV)》.pdf_第1页
第1页 / 共3页
ITU-T N 12-1988 MEASUREMENTS TO BE MADE DURING THE LINE - UP PERIOD THAT PRECEDES A SOUND - PROGRAMME TRANSMISSION《测量过程中排成直线时期前的声音程序传输 维护国际声音程序和电视传输电路(研究组IV)》.pdf_第2页
第2页 / 共3页
ITU-T N 12-1988 MEASUREMENTS TO BE MADE DURING THE LINE - UP PERIOD THAT PRECEDES A SOUND - PROGRAMME TRANSMISSION《测量过程中排成直线时期前的声音程序传输 维护国际声音程序和电视传输电路(研究组IV)》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、INTERNATIONAL TELECOMMUNICATION UNION)45G134 . TELECOMMUNICATIONSTANDARDIZATION SECTOROF ITU-!).4%.!.#%G0G0/&G0G0).4%2.!4)/.!,3/5.$G0G13G002/2!-%G0G0!.$G0G04%,%6)3)/.42!.3-)33)/.G0G0#)2#5)43-%!352%-%.43G0G04/G0G0“%G0G0-!$%G0G0$52).4(%G0G0,).%G0G13G050G0G00%2)/$G0G04(!4G0G002%#%$%3!G0G03/5.$G0G13G002

2、/2!-%G0G042!.3-)33)/.)45G134G0G0RecommendationG0G0. (Extract from the “LUEG0“OOK)NOTES1 ITU-T Recommendation N.12 was published in Fascicle IV.3 of the Blue Book. This file is an extract from theBlue Book. While the presentation and layout of the text might be slightly different from the Blue Book v

3、ersion, thecontents of the file are identical to the Blue Book version and copyright conditions remain unchanged (see below).2 In this Recommendation, the expression “Administration” is used for conciseness to indicate both atelecommunication administration and a recognized operating agency. ITU 198

4、8, 1993All rights reserved. No part of this publication may be reproduced or utilized in any form or by any means, electronic ormechanical, including photocopying and microfilm, without permission in writing from the ITU.Fascicle IV.3 - Rec. N.12 1Recommendation N.12Fascicle IV.3 - Rec. N.12MEASUREM

5、ENTS TO BE MADE DURING THE LINE-UP PERIODTHAT PRECEDES A SOUND-PROGRAMME TRANSMISSIONAfter the connection of the various circuits to form the international sound-programme link (conforming to thelevel diagrams of these circuits) it is necessary to verify, by means of an automatic measuring equipment

6、 (seeRecommendations O.31 1, O.32 2 and O.33 3) or by measurements at individual frequencies, that the received levelat the distant incoming terminal ISPC is at the correct value (see Recommendation N.10) at the following frequencies:for an international sound-programme link composed entirely of 15-

7、kHzsound-programme circuits . 40, 800 and 15 000 Hzfor an international sound-programme link composed entirely of 10-kHzsound-programme circuits 50, 800 and 10 000 Hzfor an international sound-programme link comprising at least one7 kHz sound-programme circuit . 50, 800 and 7 000 Hzfor an internatio

8、nal sound-programme link comprising at least one6.4 kHz sound-programme circuit . 50, 800 and 6 400 Hzfor an international sound-programme link comprising at least one5 kHz sound-programme circuit . 100, 800 and 5 000 Hzfor an international sound-programme link comprising at least oneordinary teleph

9、one circuit . 300, 800 and 3 400 Hz1)The send level during these measurements should be 12 dBm0.In the case of 15-kHz sound-programme links forming a stereophonic pair, it is necessary to verify theinterchannel parameter limits specified in Table 4/N.10.A measurement of other parameters such as nonl

10、inear distortion and noise should be measured on all links andthe results recorded. At the present time the limits cannot be specified.The national sound-programme circuits should be so adjusted that, when they are connected to theinternational sound-programme link, the level diagrams of the interna

11、tional sound-programme circuits are respected. Inthis regard, a useful and quick method which Administrations could use to verify the correct alignment of sound-programme links is given in Annex A of Recommendation N.13.Any necessary adjustments having been made, the national circuits are connected

12、to the international sound-programme link at the terminal ISPCs. This is the end of the line-up period and the beginning of the preparatory periodand is the instant when the complete connection is placed at the disposal of the broadcasting organizations.The latter then proceed to measure and adjust

13、as necessary.References1 CCITT Recommendation Automatic measuring equipment for sound-programme circuits, Vol. IV, Rec. O.31.2 CCITT Recommendation Automatic measuring equipment for stereophonic pairs of sound-programmecircuits, Vol. IV, Rec. O.32.3 CCITT Recommendation Automatic equipment for rapidly measuring stereophonic pairs and monophonicsound-programme circuits, links and connections, Vol. IV, Rec. O.33._1)Or the frequency appropriate to the telephone-type circuit used.

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 14080-2013 Timber structures - Glued laminated timber and glued solid timber - Requirements German version EN 14080 2013《木结构 木料胶合板和胶合实木 要求 德文版本EN 14080-2013》.pdf DIN EN 14080-2013 Timber structures - Glued laminated timber and glued solid timber - Requirements German version EN 14080 2013《木结构 木料胶合板和胶合实木 要求 德文版本EN 14080-2013》.pdf
  • DIN EN 14081-1-2016 Timber structures - Strength graded structural timber with rectangular cross section - Part 1 General requirements German version EN 14081-1 2016《木结构 矩形截面的强度分级结.pdf DIN EN 14081-1-2016 Timber structures - Strength graded structural timber with rectangular cross section - Part 1 General requirements German version EN 14081-1 2016《木结构 矩形截面的强度分级结.pdf
  • DIN EN 14081-2-2013 Timber structures - Strength graded structural timber with rectangular cross section - Part 2 Machine grading additional requirements for initial type testing G.pdf DIN EN 14081-2-2013 Timber structures - Strength graded structural timber with rectangular cross section - Part 2 Machine grading additional requirements for initial type testing G.pdf
  • DIN EN 14081-3-2012 Timber structures - Strength graded structural timber with rectangular cross section - Part 3 Machine grading additional requirements for factory production con.pdf DIN EN 14081-3-2012 Timber structures - Strength graded structural timber with rectangular cross section - Part 3 Machine grading additional requirements for factory production con.pdf
  • DIN EN 14082-2003 Foodstuffs - Determination of trace elements - Determination of lead cadmium zinc copper iron and chromium by atomic absorption spectrometry (AAS) after dry ashin.pdf DIN EN 14082-2003 Foodstuffs - Determination of trace elements - Determination of lead cadmium zinc copper iron and chromium by atomic absorption spectrometry (AAS) after dry ashin.pdf
  • DIN EN 14083-2003 Foodstuffs - Determination of trace elements - Determination of lead cadmium chromium and molybdenum by graphite furnace atomic absorption spectrometry (GFAAS) af.pdf DIN EN 14083-2003 Foodstuffs - Determination of trace elements - Determination of lead cadmium chromium and molybdenum by graphite furnace atomic absorption spectrometry (GFAAS) af.pdf
  • DIN EN 14084-2003 Foodstuffs - Determination of trace elements - Determination of lead cadmium zinc copper and iron by atomic absorption spectrometry (AAS) after microwave digestio.pdf DIN EN 14084-2003 Foodstuffs - Determination of trace elements - Determination of lead cadmium zinc copper and iron by atomic absorption spectrometry (AAS) after microwave digestio.pdf
  • DIN EN 14085-2011 Resilient floor coverings - Specification for floor panels for loose laying German version EN 14085 2010《弹性地板覆盖物 活动铺设地板覆盖物规范 德文版本EN 14085-2010》.pdf DIN EN 14085-2011 Resilient floor coverings - Specification for floor panels for loose laying German version EN 14085 2010《弹性地板覆盖物 活动铺设地板覆盖物规范 德文版本EN 14085-2010》.pdf
  • DIN EN 14086-2003 Paper and board - Measurement of specular gloss - 45 gloss with a parallel beam DIN method German version EN 14086 2003《纸和纸板 光泽度测量 45度平行光束 DIN法》.pdf DIN EN 14086-2003 Paper and board - Measurement of specular gloss - 45 gloss with a parallel beam DIN method German version EN 14086 2003《纸和纸板 光泽度测量 45度平行光束 DIN法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1