NASA UFGS-23 36 00 00 40-2011 AIR TERMINAL UNITS《航空集散站装置》.pdf

上传人:ideacase155 文档编号:836587 上传时间:2019-02-20 格式:PDF 页数:31 大小:106.58KB
下载 相关 举报
NASA UFGS-23 36 00 00 40-2011 AIR TERMINAL UNITS《航空集散站装置》.pdf_第1页
第1页 / 共31页
NASA UFGS-23 36 00 00 40-2011 AIR TERMINAL UNITS《航空集散站装置》.pdf_第2页
第2页 / 共31页
NASA UFGS-23 36 00 00 40-2011 AIR TERMINAL UNITS《航空集散站装置》.pdf_第3页
第3页 / 共31页
NASA UFGS-23 36 00 00 40-2011 AIR TERMINAL UNITS《航空集散站装置》.pdf_第4页
第4页 / 共31页
NASA UFGS-23 36 00 00 40-2011 AIR TERMINAL UNITS《航空集散站装置》.pdf_第5页
第5页 / 共31页
点击查看更多>>
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 36 00.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-23 36 00 (November 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR COND

2、ITIONINGSECTION 23 36 00.00 40AIR TERMINAL UNITS02/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 GENERAL REQUIREMENTS1.4 QUALITY ASSURANCE1.5 COORDINATIONPART 2 PRODUCTS2.1 BYPASS SINGLE-DUCT AIR TERMINAL UNITS2.1.1 Configuration2.1.2 Casing2.1.3 Diverter Assembly2.1.4 Multi-Outlet Attenuator Sect

3、ion2.1.5 Hot-Water Heating Coil2.1.6 Electric Heating Coil2.1.7 Electric Controls2.1.8 Electronic Controls2.1.9 Pneumatic Controls2.1.9.1 Pneumatic Damper Operator2.1.9.2 Velocity Controllers2.1.10 Thermostat2.2 DUAL-DUCT AIR TERMINAL UNITS2.2.1 Configuration2.2.2 Casing2.2.2.1 Casing Lining2.2.3 Vo

4、lume Damper2.2.4 Attenuator Section2.2.5 Multi-Outlet Attenuator Section2.2.6 Pneumatic Controls2.2.6.1 Pneumatic Damper Operator2.2.6.2 Velocity Controllers2.2.6.3 Thermostat2.2.7 Electronic Controls2.2.7.1 Damper ActuatorSECTION 23 36 00.00 40 Page 1Provided by IHSNot for ResaleNo reproduction or

5、networking permitted without license from IHS-,-,-2.2.7.2 Velocity Control2.2.7.3 Thermostat2.2.8 DDC Controls2.2.8.1 Damper Actuators2.2.8.2 Velocity Sensors2.2.8.3 Terminal Unit Controller2.2.8.4 Room Sensor2.2.9 Control Sequence2.3 FAN-POWERED AIR TERMINAL UNITS2.3.1 Configuration2.3.2 Casing2.3.

6、2.1 Casing Lining2.3.3 Volume Damper2.3.4 Fan Section2.3.4.1 Lining2.3.4.2 Motor2.3.4.3 Air Filter2.3.5 Attenuator Section2.3.6 Hot-Water Heating Coil2.3.7 Electric Heating Coil2.3.8 Factory-Mounted and -Wired Controls2.3.9 Control Panel Enclosure2.3.10 Electric Controls2.3.11 Pneumatic Controls2.3.

7、11.1 Pneumatic Damper Operator2.3.11.2 Velocity Controller2.3.11.3 Thermostat2.3.12 Electronic Controls2.4 INDUCTION AIR TERMINAL UNITS2.4.1 Configuration2.4.2 Casing2.4.2.1 Casing Lining2.4.3 Volume Damper2.4.4 Induction Damper2.4.5 Hot-Water Heating Coil2.4.6 Electric Heating Coil2.4.7 Pneumatic C

8、ontrols2.4.7.1 Damper Operator2.4.7.2 Velocity Controller2.4.7.3 Induction Damper Operator2.4.7.4 Thermostat2.4.8 Electronic Controls2.4.8.1 Damper Actuator2.4.8.2 Velocity Controller2.4.8.3 Induction Damper Operator2.4.8.4 Thermostat2.5 SHUTOFF SINGLE-DUCT AIR TERMINAL UNITS2.5.1 Configuration2.5.2

9、 Casing2.5.2.1 Casing Lining2.5.3 Regulator Assembly2.5.3.1 Automatic Flow-Control Assembly2.5.4 Regulator Assembly2.5.5 Volume Damper2.5.6 Attenuator Section2.5.7 Multi-Outlet Attenuator Section2.5.8 Hot-Water Heating Coil2.5.9 Electric Heating Coil2.5.10 Electric ControlsSECTION 23 36 00.00 40 Pag

10、e 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.5.10.1 Damper Actuator2.5.10.2 Thermostat2.5.11 Pneumatic Controls2.5.11.1 Pneumatic Damper Operator2.5.11.2 Velocity Controllers2.5.11.3 Thermostat2.5.12 Electronic Controls2.5.12.1 Damper Actuato

11、r2.5.12.2 Velocity Controller2.5.12.3 Thermostat2.5.13 DDC Controls2.5.13.1 Damper Actuators2.5.13.2 Terminal Unit Controller2.5.13.3 Room Sensor2.5.14 Control Sequence2.6 INTEGRAL-DIFFUSER AIR TERMINAL UNITS2.6.1 Configuration2.6.2 Casing2.6.2.1 Casing Lining2.6.3 Volume Damper2.6.4 Diffuser2.6.5 E

12、lectric Controls2.6.5.1 Damper Actuator2.6.5.2 Thermostat2.6.6 Pneumatic Controls2.6.6.1 Pneumatic Damper Operator2.6.6.2 Velocity Controller2.6.6.3 Thermostat2.6.7 Electronic Controls2.6.7.1 Damper Actuator2.6.7.2 Velocity Controller2.6.7.3 Thermostat2.6.8 Control Sequence2.7 HIGH-PRESSURE DUAL-DUC

13、T MIXING BOXES2.7.1 Construction2.7.2 Casing Leakage2.7.3 Inlet Valve Leakage2.7.4 Mixed-Air Temperature Requirements2.7.5 Volume Control Requirements2.7.6 Sound Level Requirements2.7.7 Control Requirements2.8 LOW-PRESSURE DUAL-DUCT MIXING BOXES2.8.1 Casing Leakage2.8.2 Inlet Valve Leakage2.8.3 Mixe

14、d-Air Temperature Requirements2.8.4 Sound Level Requirements2.8.5 Control Requirements2.9 SOURCE QUALITY CONTROL2.9.1 Identification2.9.2 Verification of PerformancePART 3 EXECUTION3.1 INSTALLATION3.2 CONNECTIONS3.2.1 Hot-Water Piping3.3 OPERATION AND MAINTENANCE3.4 FIELD QUALITY CONTROL3.4.1 Leak T

15、estSECTION 23 36 00.00 40 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4.2 Operational Test3.5 STARTUP SERVICE3.6 DEMONSTRATION- End of Section Table of Contents -SECTION 23 36 00.00 40 Page 4Provided by IHSNot for ResaleNo reproduction or

16、 networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 36 00.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-23 36 00 (November 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 23 36 00.00 40

17、AIR TERMINAL UNITS02/11*NOTE: This guide specification covers the requirements for bypass single-duct air terminal units, dual-duct air terminal units, fan-powered air terminal units, induction air terminal units, shutoff single-duct air terminal units and integral-diffuser air terminal units for ai

18、r handling systems.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For b

19、racketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a

20、 Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Clearly portray system dynamics in drawings and schedules so that equipment functions as required.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to

21、in the text by basic designation only and listed in SECTION 23 36 00.00 40 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you a

22、dd a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specificat

23、ion when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AIR DIFFUSION COUNCIL (ADC)ADC Standards Manual (5th Edit

24、ion) Flexible Duct Performance Installation StandardsAIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)AHRI 880 (2008) Performance Rating of Air TerminalsAMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE)ASHRAE 130 (2008) Method of Testing for Rating Ducted

25、Air Terminal UnitsASTM INTERNATIONAL (ASTM)ASTM A653/A653M (2010) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip ProcessASTM C 1071 (2005e1) Standard Specification for Fibrous Glass Duct Lining Insulation (Thermal and Sound Ab

26、sorbing Material)ASTM E 84 (2010b) Standard Test Method for Surface Burning Characteristics of Building MaterialsNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA 250 (2008) Enclosures for Electrical Equipment (1000 Volts Maximum)NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (2011) Natio

27、nal Electrical CodeSECTION 23 36 00.00 40 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NFPA 90A (2009; Errata 09-1) Standard for the Installation of Air Conditioning and Ventilating SystemsUNDERWRITERS LABORATORIES (UL)UL 181 (2005; Reprint

28、Oct 2008) Factory-Made Air Ducts and Air ConnectorsUL 486A-486B (2003; Reprint Feb 2010) Wire Connectors1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Sub

29、mittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed

30、through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ desig

31、nation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for

32、Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; s

33、ubmittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL

34、PROCEDURES:SD-01 Preconstruction SubmittalsRecords of Existing ConditionsSD-02 Shop DrawingsSECTION 23 36 00.00 40 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- Bypass Single-Duct Air Terminal Units Dual-Duct Air Terminal Units Fan-Powered A

35、ir Terminal Units Induction Air Terminal Units Shutoff Single-Duct Air Terminal Units Integral-Diffuser Air Terminal Units High-Pressure Dual-Duct Mixing Boxes Low-Pressure Dual-Duct Mixing Boxes Record DrawingsSD-03 Product Data Bypass Single-Duct Air Terminal Units Dual-Duct Air Terminal Units Fan

36、-Powered Air Terminal Units Induction Air Terminal Units Shutoff Single-Duct Air Terminal Units Integral-Diffuser Air Terminal Units High-Pressure Dual-Duct Mixing Boxes Low-Pressure Dual-Duct Mixing Boxes Spare PartsSD-10 Operation and Maintenance DataOperation and Maintenance Manuals1.3 GENERAL RE

37、QUIREMENTS*NOTE: If Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS is not included in the project specification, applicable requirements therefrom should be inserted and the following paragraph deleted.*Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST

38、SYSTEMS applies to work specified in this section.Submit itemized lists for all materials, equipment, and fixtures to be incorporated in the work 30_ days prior to commencement of work. Lists must include manufacturers style or catalog numbers, specification SECTION 23 36 00.00 40 Page 8Provided by

39、IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-and drawing reference numbers, warranty information, and fabrication site information. Submit product data for each type of air terminal unit indicated, including rated capacities, furnished specialties, sound-powe

40、r ratings, and accessories: a. Bypass Single-Duct Air Terminal Unitsb. Dual-Duct Air Terminal Unitsc. Fan-Powered Air Terminal Unitsd. Induction Air Terminal Unitse. Shutoff Single-Duct Air Terminal Unitsf. Integral-Diffuser Air Terminal Unitsg. High-Pressure Dual-Duct Mixing Boxesh. Low-Pressure Du

41、al-Duct Mixing Boxes Submit records of existing conditions consisting of the results of Contractors survey of work area conditions and features of existing structures and facilities within and adjacent to the jobsite. Commencement of work constitutes acceptance of existing conditions.Submit shop dra

42、wings which detail equipment assemblies and indicate dimensions, required clearances, method of field assembly, components, and location and size of each field connection. Include a schedule showing unique model designation, room location, model number, size, and accessories furnished. Include wirin

43、g diagrams to show power, signal, and control wiring.Provide units with the configuration, capacity, and static-pressure characteristics indicated.Ensure dimensional data stated constitutes nominal sizing, which has been adjusted by the manufacturer when necessary to accommodate acoustic material th

44、ickness.Ensure units proposed are identical to units having at least 2 years of proven satisfactory field service.*NOTE: Select or delete the following paragraph after checking current “Directory of Air Diffusion Council (ADC Standards Manual) Certified Products.“*Provide certification that units and spare parts are ADC Standards Manual tested and rated.1.4 QUALITY ASSURANCEIndicate d

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1