NASA UFGS-43 41 16 16 40-2011 VERTICAL ATMOSPHERIC TANKS AND VESSELS《垂直的大气储罐和器皿》.pdf

上传人:deputyduring120 文档编号:836613 上传时间:2019-02-20 格式:PDF 页数:15 大小:63.24KB
下载 相关 举报
NASA UFGS-43 41 16 16 40-2011 VERTICAL ATMOSPHERIC TANKS AND VESSELS《垂直的大气储罐和器皿》.pdf_第1页
第1页 / 共15页
NASA UFGS-43 41 16 16 40-2011 VERTICAL ATMOSPHERIC TANKS AND VESSELS《垂直的大气储罐和器皿》.pdf_第2页
第2页 / 共15页
NASA UFGS-43 41 16 16 40-2011 VERTICAL ATMOSPHERIC TANKS AND VESSELS《垂直的大气储罐和器皿》.pdf_第3页
第3页 / 共15页
NASA UFGS-43 41 16 16 40-2011 VERTICAL ATMOSPHERIC TANKS AND VESSELS《垂直的大气储罐和器皿》.pdf_第4页
第4页 / 共15页
NASA UFGS-43 41 16 16 40-2011 VERTICAL ATMOSPHERIC TANKS AND VESSELS《垂直的大气储罐和器皿》.pdf_第5页
第5页 / 共15页
点击查看更多>>
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-43 41 16.16 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-43 41 16.16 (August 2010)UFGS-43 41 13.19 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 43 - PRO

2、CESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGEEQUIPMENTSECTION 43 41 16.16 40VERTICAL ATMOSPHERIC TANKS AND VESSELS02/11PART 1 GENERAL1.1 REFERENCES1.2 ADMINISTRATIVE REQUIREMENTS1.2.1 Preconstruction Requirements1.2.1.1 Record Drawing of Existing Conditions1.2.1.2 Fabrication Drawings1.2.1

3、.3 Equipment Room Drawings1.2.1.4 Installation Drawings1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.5 PRODUCT DELIVERY AND STORAGEPART 2 PRODUCTS2.1 LOADING CONDITIONS2.2 CHEMICAL STORAGE REQUIREMENTS2.3 CAPACITY AND DIMENSIONAL REQUIREMENTS2.3.1 Liquid Level Gauge2.4 TANK CONSTRUCTION REQUIREMENTS2.5 ACCES

4、SORIES2.5.1 Flanged Nozzles2.5.2 Inlet Nozzles2.5.3 Outlet Nozzles2.5.4 Vent2.5.5 Flanged Manways2.5.6 Removable Cover2.5.7 Tiedown Lugs2.5.8 Tank Lifting Lugs2.5.9 Identification Plate2.5.10 Certification PlatePART 3 EXECUTIONSECTION 43 41 16.16 40 Page 1Provided by IHSNot for ResaleNo reproduction

5、 or networking permitted without license from IHS-,-,-3.1 INSTALLATION3.2 OPERATION AND MAINTENANCE MANUAL3.3 HYDROSTATIC TEST3.4 CLEANING3.5 INSPECTION3.6 RECORD DRAWINGS- End of Section Table of Contents -SECTION 43 41 16.16 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permi

6、tted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-43 41 16.16 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-43 41 16.16 (August 2010)UFGS-43 41 13.19 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION

7、43 41 16.16 40VERTICAL ATMOSPHERIC TANKS AND VESSELS02/11*NOTE: This specification covers the requirements for fiberglass-reinforced polyester storage tanks and accessories for use in aggressive chemical service at atmospheric pressures and is limited to flat-bottomed, aboveground, vertical, cylindr

8、ical tanks.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed

9、 items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteri

10、a Change Request (CCR).*PART 1 GENERAL*NOTE: This section does not cover vertical tanks with dished or conical bottoms, vertical tanks for buried service, pressure vessels, and horizontal tanks for both above ground and buried services.Related work specified elsewhere includes:Cast-in-place concrete

11、Anchor bolts (provide calculations that determine bolt types, sizes and quantities required.)SECTION 43 41 16.16 40 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Plastic pipeAcid-resistant pipeChemical valvesLiquid level gagesAs a minimum, sh

12、ow on drawings:The physical location of each tankThe location of all accessories to be furnishedwith each tankConcrete-foundation details for each tankAnchoring details for each tank to the foundationA schedule with connections, size, quantity, and location of tanks.Specify connection usage such as

13、drain, vent, or overflow and location by top or side. Coordinate this schedule with all accessories and their locations shown on drawings.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text b

14、y basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wiz

15、ards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to

16、 the extent referenced. The publications are referred to within the text by the basic designation only.ASME INTERNATIONAL (ASME)ASME B16.5 (2009) Pipe Flanges and Flanged Fittings: NPS 1/2 Through NPS 24 Metric/Inch StandardSECTION 43 41 16.16 40 Page 4Provided by IHSNot for ResaleNo reproduction or

17、 networking permitted without license from IHS-,-,-ASTM INTERNATIONAL (ASTM)ASTM C 581 (2003; R 2008e1) Standard Practice for Determining Chemical Resistance of Thermosetting Resins Used in Glass-Fiber-Reinforced Structures, Intended for Liquid ServiceASTM D 5948 (2005e1) Standard Specification for

18、Molding Compounds, ThermosettingBRITISH STANDARDS INSTITUTE (BSI)BS EN 13121-3 (2008; AMD 2010) GRP Tanks and Vessels for Use Above Ground Part 3: Design and WorkmanshipINTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)ISO 7005-2 (1988) Metallic Flanges Part 2: Cast Iron FlangesNATIONAL AERONAUTIC

19、S AND SPACE ADMINISTRATION (NASA)RCBEA 2.63 (2004) Tank and Storage Tank Un-pressurizedRCBEA GUIDE (2004) NASA Reliability Centered Building and Equipment Acceptance Guide1.2 ADMINISTRATIVE REQUIREMENTS*NOTE: If Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS is not inclu

20、ded in the project specification, applicable requirements thereof should be inserted and the following paragraph deleted.*Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS applies to work specified in this section.1.2.1 Preconstruction Requirements1.2.1.1 Record Drawing of

21、Existing ConditionsSubmit record drawing of existing conditions, including any underground utilities, 30 _ days prior to start of construction work.1.2.1.2 Fabrication DrawingsSubmit fabrication drawings for fiberglass-reinforced polyester storage tanks, including construction and anchorage details,

22、 30 _ days prior to start of construction work.Submit manufacturers standard color charts for laminates for visual inspection of surface finish and color.SECTION 43 41 16.16 40 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Submit manufacturer

23、s catalog data for storage tanks including spare parts.1.2.1.3 Equipment Room DrawingsShow on drawings of equipment room layout structural and fenestration features, and items requiring installation that could reduce the available space. Detail all ductwork and piping.1.2.1.4 Installation DrawingsSu

24、bmit installation drawings for fiberglass-reinforced polyester storage tanks including all foundation and anchorage details 30 _ days prior to start of construction work. Also submit equipment foundation data including equipment weight and operating loads, horizontal and vertical loads, seismic data

25、, wind loadshurricane force windloads,location and projection of anchor bolts, horizontal and vertical clearances for installation, plan dimensions of foundations and relative elevations, and other installation requirements such as utility services.Also include in submittal coordination drawings sho

26、wing the processes, structural, and architectural elements of the work. Indicate where conflicts or clearance problems exist between the various functions. Clearly show on drawings:a. Manufacturers certification that storage tanks are suitable for storage of specified chemicals,b. Signed statements

27、providing confirmation that installers have knowledge of the requirements of the applicable standards, including NASA RCBEA GUIDE, and specifically RCBEA 2.63, and installation practices to ensure installation in a sound, undamaged condition,c. Material, equipment, and fixture lists including manufa

28、cturers style or catalog numbers, specification and drawing reference numbers, warranty information, and fabrication site,d. Equipment and performance data by the storage tank manufacturer indicating use life, safety features, and mechanical automated details.e. Construction equipment lists consisti

29、ng of proposed construction equipment to be used in the project, including descriptive data.f. Manufacturers instructions describing the installation of specified system, including special notices and material safety data sheets, special signage and data relating to impedances, hazards, and safety p

30、recautions.1.3 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a

31、 submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only SECTION 43 41 16.16 40 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-delete an existing “G” if the submittal item i

32、s not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags m

33、ay be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“

34、for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for su

35、bmittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordanc

36、e with Section 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsRecord Drawing of Existing Conditions; G; G, _Material, Equipment, and Fixture Lists; G; G, _Construction Equipment Lists; G; G, _Listing of Product Installation; G; G, _SD-02 Shop DrawingsCoordination Drawings; G; G, _Equi

37、pment Room Layout; G; G, _Fabrication Drawings; G; G, _Installation Drawings; G; G, _SD-03 Product DataEquipment and Performance Data; G; G, _Equipment Foundation Data; G; G, _Storage Tanks; G; G, _SECTION 43 41 16.16 40 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted with

38、out license from IHS-,-,-Accessories; G; G, _SD-04 SamplesManufacturers Standard Color Charts for Laminates; G; G, _.Flanged Nozzles; G; G, _.Inlet Nozzles; G; G, _.Outlet Nozzles; G; G, _SD-05 Design DataDesign Analysis and Calculations; G; G, _SD-06 Test ReportsChemical Resistance Tests; G; G, _Ta

39、nk Integrity; G; G, _Verification of Liquid Level Indication Results; G; G, _Verification of Relief Device Results; G; G, _Hydrostatic Tests; G; G, _SD-07 CertificatesCertificates of Conformance; G; G, _ InstallersSD-08 Manufacturers InstructionsManufacturers Instructions; G; G, _SD-09 Manufacturers

40、 Field ReportsManufacturers Field Reports; G; G, _SD-10 Operation and Maintenance DataOperation and Maintenance Manual; G; G, _.SD-11 Closeout SubmittalsRecord Drawings; G; G, _.1.4 QUALITY ASSURANCESubmit listing of product installation for fiberglass-reinforced polyester storage tanks identifying

41、at least five units, similar to those proposed for use, that have been in successful service for a minimum of five years. Identify purchaser, address of installation, service organization, and date of installation.SECTION 43 41 16.16 40 Page 8Provided by IHSNot for ResaleNo reproduction or networkin

42、g permitted without license from IHS-,-,-30 _ days prior to commencement of work, submit certificates of conformance verifying compliance with the standards and specifications for the following items:a. Storage tanksb. Installer1.5 PRODUCT DELIVERY AND STORAGEHandle and store tanks per manufacturers

43、 guidelines to prevent damage. Deliver each tank in compliance with specifications and provide verification of no damage, surface defects, or poor quality laminates.All damaged or defective tanks or removable covers will be rejected. Remove immediately from the project site.Concurrent with delivery of tanks, submit three copies of manufacturers Operation and Maintenance Manual.PART 2 PRODUCTS2.1 LOADING CONDITIONS*NOTE: Show equipment and accessory loads affecting tank shells and tops, if required. Show windload for exterior tanks and tank top design load when top manways are specified.*

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1