NAVY MIL-A-23282 B (4)-1977 ACTUATOR《解脱保险装置》.pdf

上传人:confusegate185 文档编号:976882 上传时间:2019-03-13 格式:PDF 页数:5 大小:181.53KB
下载 相关 举报
NAVY MIL-A-23282 B (4)-1977 ACTUATOR《解脱保险装置》.pdf_第1页
第1页 / 共5页
NAVY MIL-A-23282 B (4)-1977 ACTUATOR《解脱保险装置》.pdf_第2页
第2页 / 共5页
NAVY MIL-A-23282 B (4)-1977 ACTUATOR《解脱保险装置》.pdf_第3页
第3页 / 共5页
NAVY MIL-A-23282 B (4)-1977 ACTUATOR《解脱保险装置》.pdf_第4页
第4页 / 共5页
NAVY MIL-A-23282 B (4)-1977 ACTUATOR《解脱保险装置》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 MIL-A-23282B (4) 13 777770b 0463774 4 * MIL-A-23282B (OS) AMENDMENT4 2 February 1977 Superceding AMENDMENT3 3 March 1969 1aI;ITARY SPECIFICATICN AClUAmR This amndmnt fomis a part of Military Specification MIL-A-23282B(Wep) of 19 April 1965 and is aproved for use by the Naval Sea Systems Cannard, De

2、partment of the Navy, and is available for use by all Departments and Agencies of the Department of Defense. this amadnent basic specification ML-A-23282B(Wep) is changed to read MILrA-23282B(OS). * . wherever it appears in specification, delete “Bureau of Naval Weapns“ and substitute “Naval Sea Sys

3、temc copmiand“; alco delete llBUWEPS“ and substitute iiNAVSFA“. Page 1, paragraph 1.1: Delete “Torpedo Mk 37 Mxs O and 1“ and substitute “Torpedo Mk 37 Mxs O, O (M) , 1, 2, and 3“. Bottcan of page 1, add the following: Beneficial ccamients (reccmmdations, additions, deletions) and any pertinent data

4、 which may be of use in inproving this document should be addressed to: Station (611), Standardization DiVision, Indian Head, M 20640 by using the self-addressed Standardization Document nprovemnt Proposal (DD Form 1426) appearing at the end of this document or by letter. carmianahg Officer, Naval r

5、dnance Page 5, paragraph 3.2.7 (Interchangeability): Delete. Page 6, paragraph 3.3.2.1. I 3.3.2.1 Clutch circuit resistance. Each magnetic particle clutch circuit shall have a dc resistance of 5720 0h-w plus or minus 7r per- cent, tested at 22 degrees centigrade plus or minus 3 degrees centigrade wh

6、en tested as in 4.5.4.2.“ Delete and substitute: Page 8, paragraph 3.3.4.1, line 8: Delete “6.7 volts or mre than 8.1 volts“ and substitute “5.3 volts or mre than 6.9 volts with a 1020 f. 20 ohm load“. Page 9, Figure 1: Page 10, paragraph 3.3.6.1: Replace figure with new Figure 1, attached. Delete l

7、ast four lines and substitute I. . . current of 7 plus or minus 2 milliamperes (ma) dc energizes the magnetic particle clutch coil across termina 1s 1 and 2 of P40 (Drawing 694739). Test as in 4.5.4.6.1“. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,

8、MIL-A- 2 3 2 8 2B (OS ) AMENDMENT 4 a Page 10, paragraph 3.3.6.2: Delete last four lines and substitute “, and a current: of 7 plus or minus 2 ma dc energizes the magnetic particle clutch coil: across terminals 2- and 3 of P40 (Drawing 694739). Test as in 4.5,4.6; 2.“ Page 13, Figure 2: Replace f

9、igure with new Figure 2, attached,. * Page 15, paragraph 4.1, Delete and substitute: “4.1 Responsibility for inspection. Unless otherwise specified in the contract, the contractor is responsible for the performance of all inspec- tion requirements as specified herein. Except as otherwise specified i

10、n the contract, the contractor may use his own or any other facilities suit- able for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such i

11、nspections are deemed.necessary to assure supplies and services conform to prescribed requirements .I Page 16, paragraph 4.2.1, lines 4 and 5: Delete “Torpedo Mk 37 Mods O and 1 and substitute “Torpedo Mk 37 Mods O, O (M) , 1, 2, and 3“. Page 21. II 4.5.4.2.5 Add the following new paragraph: Followi

12、ng the assembly of the complete actuator, use the multimeter. (4.5.3.4) to. ensure that the wiring conforms to schematic dia- gram (Drawing 694739) and that the pin to pin resistances are as set forth in Table I. Table I RESISTANCE IN OHMS Pins on Output Shaft Fully P40 Counterclockwise 5-6 7,900 51

13、0%- 5- 7 10,000 +lo% 6-7 2,100 ZlO% 9-10 .490 510% 9-11 625 510% 10-11 135 210% 13-14 - *Output Shaft Moving Clockwise Potentiometer used is to have a resolution of 0.15% max 10,000 510% potentiometer used is to have a resolution of 0.15% max Potentiometer used is to have a resolution of 0.15% max 6

14、25 210% Potentiometer used is to have a resolution of O. 15% max Polarity 14 is + volts Output Shaft Fully Clockwise 2,100 510% 10,000 +lo% 7,900 +lo% - 135 510% 625 +lo% 490 +lo% I *During output, the shaft movement shall be continuous without interruption.“ 2 Provided by IHSNot for ResaleNo reprod

15、uction or networking permitted without license from IHS-,-,-MIL-A-23282B (4) 13 W 47799Ob 04b377b 8 m MIGA-23282 (OS) zQmmEwr4 Page 24, paragraphs 4.5.4.6.1 and 4.5.4.6.2. “4.5.4.6.1 With the actuator munte as in 4.5.4.4.1, the actuator Delete and substitute: adjustnient set connected as in 4.5.4.4.

16、2, and with the puiley driven at 5000 to 6000 rpm in a cw direction (as Viewed facing the pulley), energize the magnetic particle clutch coil connected across terminals 1 and 2 of P40 with 7 plus or minus 2 ma. The output ann shall mve as cpecified in 3.3.6.1. 4.5.4.6.2 With the actuator munted and

17、driven as in 4.5.4.6.1, energize the magnetic particle clutch coil connecteci across terminals 2 and 3 of P40 with 7 plus or minus 2 ma. as specified in 3.3.6.2.“ The output arm shall mve Page 31, paragraph 6.1: Delete ttTbo Mk 37 WS O and 1“ and substitute Tbrpedo Mk 37 Bkds O, O (M) , 1, 2, and 3“

18、 * After Page 31: Delete the old DD Form 1426 and add the attached DD Form 1426 to end of specification, The margins of this armxmnt are marked with an asterisk to indicate where changes (additions, modifications, corrections, deletions) fran the previous issue me made. and the Govenunent assumes n

19、o liability whatsoever for any inaccuracies in these notations. the requirements of this document based on the entire content irrespective of the mirginal notations an relationship to the last previous issue. This was done as a convenience only Bidders and contractors are cautioned to evaluate CUStO

20、dian: Navy - os -s Preparing Activity: Navy - Os Project No. 1355-N387 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-A-232ZB (Li) 13, IS POSITIVE (+) WHEN OUTPUT SHAFT IS MOV- ING CLOCKWISE MIL-A- 23 2 8W( O S) AMENDENT 4 1 I W 9999906 0Lib37

21、97 T 1 ouTJ?ur SHAFT - LIIWAITY & sM0o”NESS OF OPEEATION 1 4- P14 OF CONNECTOR P40 IS NEGATIVE (-) WHEN OUTPUT SHAFT IS MOV- 1 NOT IN M3TION - MIDPOSITION TIm-t FIGURF: 1 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-A-23282B (LI) 13 9997706

22、0463798 i W DurL?z CYCLE TERMINALS 1 AND 2 OF P40 12.5 f -5 MA 7 TERMINALS 2 AND 3 I OF P40 TERMINALS 2 AND 3 OF P40 13.5 f .5 MA 2MAMAx TERMINALS 1 AND 2 OF P40 -L - t F2 ONE EZ&ENT OF A IXITY CYCLE WIiERE: FROM 6 To 150 SECONDS AND WRERF: THE DUTY CYCLE 7 IS i800 SECONDS MI-. t MAY VARY ANY INCREMENTAL IIME MAY VARY BY 25$ OF ITS OWN VALUE. * U. S. GOVERNMENT PRINTING OFFICE 1977.703-020/1&8 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • GOST 8 106-2001 State system for ensuring the uniformity of measurements State verification schedule for instruments measuring the radiance and radiant intensity of heat sources wi温.pdf GOST 8 106-2001 State system for ensuring the uniformity of measurements State verification schedule for instruments measuring the radiance and radiant intensity of heat sources wi温.pdf
  • GOST 8 107-1981 State system for ensuring the uniformity of measurements State special standard and all-union verification schedule for means measuring absolute pressure within then 3 .pdf GOST 8 107-1981 State system for ensuring the uniformity of measurements State special standard and all-union verification schedule for means measuring absolute pressure within then 3 .pdf
  • GOST 8 111-1974 The state system for ensuring the uniformity of measurements Dead-weight compaund pressure and vacuum gauges MVP-2 5 type Verification methods and means《国家测量一致性保证体制.pdf GOST 8 111-1974 The state system for ensuring the uniformity of measurements Dead-weight compaund pressure and vacuum gauges MVP-2 5 type Verification methods and means《国家测量一致性保证体制.pdf
  • GOST 8 113-1985 State system for ensuring the uniformity of measurements Vernier callipers Verification methods《ГСИ 卡尺 检定方法》.pdf GOST 8 113-1985 State system for ensuring the uniformity of measurements Vernier callipers Verification methods《ГСИ 卡尺 检定方法》.pdf
  • GOST 8 114-1974 State system for ensuring the uniformity of measurements Vertical optical length comparators Methods an means of verification《ГСИ 立式光学测长仪 检定方法与工具》.pdf GOST 8 114-1974 State system for ensuring the uniformity of measurements Vertical optical length comparators Methods an means of verification《ГСИ 立式光学测长仪 检定方法与工具》.pdf
  • GOST 8 118-1985 State system for ensuring the uniformity of measurements Analogue electronic a c Voltmeters Methods of verification《ГСИ 交流模拟式伏特计 检定方法》.pdf GOST 8 118-1985 State system for ensuring the uniformity of measurements Analogue electronic a c Voltmeters Methods of verification《ГСИ 交流模拟式伏特计 检定方法》.pdf
  • GOST 8 120-2014 State system for ensuring the uniformity of measurements State traceability scheme for the instruments instruments intendend for measuring pH《确保测量一致性的国家系统 pH值测量仪器用国.pdf GOST 8 120-2014 State system for ensuring the uniformity of measurements State traceability scheme for the instruments instruments intendend for measuring pH《确保测量一致性的国家系统 pH值测量仪器用国.pdf
  • GOST 8 122-1999 State system for ensuring the uniformity of measurements Rotameters Methods of verification《ГСИ 转子流量计 检定方法与工具》.pdf GOST 8 122-1999 State system for ensuring the uniformity of measurements Rotameters Methods of verification《ГСИ 转子流量计 检定方法与工具》.pdf
  • GOST 8 127-1974 Shock-motion parameter measurements Terms and definitions《ГСИ击打动作参数测量 术语和定义》.pdf GOST 8 127-1974 Shock-motion parameter measurements Terms and definitions《ГСИ击打动作参数测量 术语和定义》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1