NAVY MIL-A-28716 (1)-1977 AMPLIFIER AUDIO FREQUENCY AM-3729( ) SR《AM-3729( ) SR音频放大器》.pdf

上传人:dealItalian200 文档编号:976927 上传时间:2019-03-13 格式:PDF 页数:1 大小:65.25KB
下载 相关 举报
NAVY MIL-A-28716 (1)-1977 AMPLIFIER AUDIO FREQUENCY AM-3729( ) SR《AM-3729( ) SR音频放大器》.pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 . - MIL-A-287Ib (I) 58 9999906 OISqLlIb 5 - MIL-A-28716( EC) AMMENDMENT I 28 March 1977 MILITARY SPECIFICATION AMPLIFIER, AUIO FREQUENCY, AM-3729( )/SR This amendment forms a part of Military Specification MIL-A-28716(EC) dated 15 October 1969. PAGE 4 3.2.3: Delete and substitute the following: “3.

2、2.3 All modular assemblies shall be physically and electrically interchangeable, on modular level only, with their counterpart in the Government furnished equipment (see 3.12). potted assemblies provided in the GFE equipment may be replaced by repairable printed circuit boards using standard parts i

3、n accordance with MIL-E-16400. The PAGE 10 Delete and substitute the following: 3.14.17.1: Il3.14.17.1 Quantitative reliability requirement. The equipment shall have a mean-time-between failure (MTBF) of not less than 1,000 hours at the 90 percent lower confidence level. PAGE 16 4.5.1: “4.5.1 Reliab

4、ility test. the Detail Requirements of MIL-STD-781 and the requirements of the fixed time type reliability test of this specification (see 4.5.2). Delete and substitute the following: The contractor shall conduct reliability tests in accordance with 4.5.2: Temperature and vibration shall be in accor

5、dance with Test Level C of MIL-STD-781. 4.5.3: “4.5.3 Reliability production tests. Following satisfactory completion of reliability qualification testing (see 4.5.2); five units shall be randomly selected by the Government quality assurance representative from each successive 1,000 units produced,

6、five units every 60 days, if less than 1,000 units are produced in 60 days, shall be selected. ducted shall be as specified in 4.5.1 and 4.5.2. withheld pending satisfactory completion of the reliability production test, except as stated in 4.5.3.1. Add the following at the end of the paragraph: Acc

7、eptance i of units on order shall be withheld pending satisfaciory completion of the qualification test.“ Delete and substitute the following: The reliability tests to be con- Final acceptance of units on order shall not be Add the following new paragraph: “4.5.3.1 Rejected equipment. In the event o

8、f rejection, acceptance of all remaining.units on No equip- order shall be withheld pending a complete review and analysis of the cause for failure. ment shall be selected more than once for reliability testing. failure is equipment manufacturer design, corrective action shall be performed on all eq

9、uipments delivered under the contract. If the failure is due to equipment manufacturer workmanship, appro- priate corrective action shall be taken on all equipment remaining to be delivered on the contracts. In order to demonstrate effective corrective action, another random sample of five units sha

10、ll be selected and tested as described in 4.5.1 and 4.5.2. This sample is in addition to the quantity L, required in 4.5.3. Acceptance of material can be resumed pending satisfactory completion of the additional testing. The contractor shall forward a complete report of the failure, cause of failure

11、, corrective action and results of the additional test sample, to the contracting officer prior to acceptance of the remaining material on order, In the event that the cause for 4.5.5: Delete entire paragraph. - i Preparing activity: (Project 5820-N686) FSC 5820 NAVY -EC *US. GOVERNMENT PRiklNG OFFICE: 1977-7050 - P Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 61850-7-420-2009 Communication networks and systems for power utility automation - Part 7-420 Basic communication structure - Distributed energy resources logical nodes (IEC.pdf DIN EN 61850-7-420-2009 Communication networks and systems for power utility automation - Part 7-420 Basic communication structure - Distributed energy resources logical nodes (IEC.pdf
  • DIN EN 61850-8-1-2012 Communication networks and systems for power utility automation - Part 8-1 Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO.pdf DIN EN 61850-8-1-2012 Communication networks and systems for power utility automation - Part 8-1 Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO.pdf
  • DIN EN 61850-9-1-2004 Communication networks and systems in substations - Part 9-1 Specific communication service mapping (SCSM) - Sampled values over serial unidirectional multidr.pdf DIN EN 61850-9-1-2004 Communication networks and systems in substations - Part 9-1 Specific communication service mapping (SCSM) - Sampled values over serial unidirectional multidr.pdf
  • DIN EN 61850-9-2-2012 Communication networks and systems for power utility automation - Part 9-2 Specific communication service mapping (SCSM) - Sampled values over ISO IEC 8802-3 .pdf DIN EN 61850-9-2-2012 Communication networks and systems for power utility automation - Part 9-2 Specific communication service mapping (SCSM) - Sampled values over ISO IEC 8802-3 .pdf
  • DIN EN 61851-22-2002 Electrical equipment of electric road vehicles - Electric vehicles conductive charging system - Part 2-2 AC electric vehicle charging station (IEC 61851-22 200.pdf DIN EN 61851-22-2002 Electrical equipment of electric road vehicles - Electric vehicles conductive charging system - Part 2-2 AC electric vehicle charging station (IEC 61851-22 200.pdf
  • DIN EN 61853-1-2011 Photovoltaic (PV) module performance testing and energy rating - Part 1 Irradiance and temperature performance measurements and power rating (IEC 61853-1 2011) .pdf DIN EN 61853-1-2011 Photovoltaic (PV) module performance testing and energy rating - Part 1 Irradiance and temperature performance measurements and power rating (IEC 61853-1 2011) .pdf
  • DIN EN 61855-2003 Household electrical hair care appliances - Methods of measuring the performance (IEC 61855 2003) German version EN 61855 2003《家用电动头发护理用具 性能的测量方法》.pdf DIN EN 61855-2003 Household electrical hair care appliances - Methods of measuring the performance (IEC 61855 2003) German version EN 61855 2003《家用电动头发护理用具 性能的测量方法》.pdf
  • DIN EN 61857-1-2009 Electrical insulation systems - Procedures for thermal evaluation - Part 1 General requirements - Low-voltage (IEC 61857-1 2008) German version EN 61857-1 2009《.pdf DIN EN 61857-1-2009 Electrical insulation systems - Procedures for thermal evaluation - Part 1 General requirements - Low-voltage (IEC 61857-1 2008) German version EN 61857-1 2009《.pdf
  • DIN EN 61857-21-2010 Electrical insulation systems - Procedures for thermal evaluation - Part 21 Specific requirements for general-purpose models - Wire-wound applications (IEC 618.pdf DIN EN 61857-21-2010 Electrical insulation systems - Procedures for thermal evaluation - Part 21 Specific requirements for general-purpose models - Wire-wound applications (IEC 618.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1