NAVY MIL-C-24017 B (1)-1988 CARTRIDGE IMPULSE MARK 8 MOD 0《0型8号脉冲炮弹》.pdf

上传人:explodesoak291 文档编号:977622 上传时间:2019-03-13 格式:PDF 页数:2 大小:65.27KB
下载 相关 举报
NAVY MIL-C-24017 B (1)-1988 CARTRIDGE IMPULSE MARK 8 MOD 0《0型8号脉冲炮弹》.pdf_第1页
第1页 / 共2页
NAVY MIL-C-24017 B (1)-1988 CARTRIDGE IMPULSE MARK 8 MOD 0《0型8号脉冲炮弹》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MILITARY SPECIFICATION CARTRIDGE, IMPULSE, MARK 8 MOD O This amendment forms a part of Military Specifcation MlLC-24017B(AS), dated 10 December 1985, and is approved for use within the Naval Air Systems Command, Department of the Navy and is available for use by all Departments and Agencies of the D

2、epartment of Defense. PAGE 3 98.1: Delete “velocity shall be 16.0 feet per second arid Substitute “velocity shall be 7.2 fee? per second”. Delete the following sentence: “The upper limit (UL) of velocity shall be 25.0 feet per second.” 3.8.2: Delete in its entirety 883: Delete in its entirety 3.84:

3、Delete “not greater than 0.020 second” and substitute “not greater than 0.030 second,” PAGE 6 . ,.- *. . 4.6.7: Delete in its entirety and substitute: “4.6.7 Ballistic test. The number of cartridges selected from each production lot for the ballistic test shall be in accordance with table II. For te

4、st firing the Mark 8 impulse cartridges, a 200(Fpound general purpose inertly loaded store shall be mounted on a standard Aero 3A bomb ejector rack, The position of the ejector shall be such that when a bomb W mounted on the ejector nose down and axis vertical, its noce shall be held 7 feet 6 inches

5、 from the ground. Suitable instrumentation for measuring chamber pressure and for determining the time from the closing of the firing circuit to the complete opening of one of the ejector hooks shall be installed. The cartridges shall be conditioned for 12 hours at 700 f 5OF prior to firing in the e

6、jector rack. Firing current shall be 10 f O5 amperes dc. Any cartridge which fails the requirements stated in 88 shall be cause for rejection of the lot represented.” 4,6.7.1 Delete in its entirety and substitute: “4.6.7.1 Velocity at ejection. The velocity M shall be computed using the equation V =

7、 d E= 1.465d = individual velocity at ejection in feet per second where h = vertical height of nose of store (75 feet) g = 32.2 ftk2 d = horizontal ejection distance in feet. me horizontal distance ejected (d) is measured in feet.” AMSC N/A Page 1 of 2 FSC 1371 Distribution Statement A: Approved for

8、 pu,lic release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-.* MlL-G24017B(AS) AMENDMENT 1 PAGE 8 64.5: Delete “is greater than 0.020 second” and Substitute “is greaier than 0.030 second” _. Preparing activity Navy-AS (Project 13TI-N938 ) 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • GOST R 55021-2012 Information technology Guidelines for the organization and representation of data elements for data interchange Coding methods and principles《信息技术 数据交换用数据元素数据元素的组.pdf GOST R 55021-2012 Information technology Guidelines for the organization and representation of data elements for data interchange Coding methods and principles《信息技术 数据交换用数据元素数据元素的组.pdf
  • GOST R 55023-2012 Pipeline valves Home regulators of pressure General specifications《管道阀门 家用压力调压器 通用规格》.pdf GOST R 55023-2012 Pipeline valves Home regulators of pressure General specifications《管道阀门 家用压力调压器 通用规格》.pdf
  • GOST R 55024-2012 Geodetic networks Classification General technical requirements《大地网络 分类 通用要求》.pdf GOST R 55024-2012 Geodetic networks Classification General technical requirements《大地网络 分类 通用要求》.pdf
  • GOST R 55025-2012 Power cables with plastic insulation for rated voltages from 6 up to and including 35 kV General specifications《额定电压大于6 kV且小于等于35 kV的塑料绝缘电力电缆 通用规范》.pdf GOST R 55025-2012 Power cables with plastic insulation for rated voltages from 6 up to and including 35 kV General specifications《额定电压大于6 kV且小于等于35 kV的塑料绝缘电力电缆 通用规范》.pdf
  • GOST R 55026-2012 Design of fans working in potentially explosive atmospheres《工作在潜在爆炸大气环境中电扇的设计》.pdf GOST R 55026-2012 Design of fans working in potentially explosive atmospheres《工作在潜在爆炸大气环境中电扇的设计》.pdf
  • GOST R 55027-2012 Microbiology of food and animal feeding stuffs Horizontal method for detection and enumeration of Campylobacter spp Part 3 Semi-quantitative method《食品和动物饲料的微生物学 弯.pdf GOST R 55027-2012 Microbiology of food and animal feeding stuffs Horizontal method for detection and enumeration of Campylobacter spp Part 3 Semi-quantitative method《食品和动物饲料的微生物学 弯.pdf
  • GOST R 55028-2012 Public roads and highways Geosynthetic for road construction Classification terms and definitions《公共道路和高速公路 道路施工用地工织物 分类 术语和定义》.pdf GOST R 55028-2012 Public roads and highways Geosynthetic for road construction Classification terms and definitions《公共道路和高速公路 道路施工用地工织物 分类 术语和定义》.pdf
  • GOST R 55029-2012 Public roads and highways Geosynthetic for reinforcement of asphalt layers of road pavement Technical requirements《公共道路和高速公路 加固沥青路面层的地工织物 规范》.pdf GOST R 55029-2012 Public roads and highways Geosynthetic for reinforcement of asphalt layers of road pavement Technical requirements《公共道路和高速公路 加固沥青路面层的地工织物 规范》.pdf
  • GOST R 55030-2012 Public roads and highways Geosynthetic for road construction Test method for tensile strength《公共道路和高速公路 道路施工用地工织物 抗拉强度的试验方法》.pdf GOST R 55030-2012 Public roads and highways Geosynthetic for road construction Test method for tensile strength《公共道路和高速公路 道路施工用地工织物 抗拉强度的试验方法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1