NAVY MIL-C-82733 A (2)-2001 CARTRIDGE IMPULSE CCU-22 A A ASSEMBLY《CCU-22 A A型炮筒推动装置》.pdf

上传人:rimleave225 文档编号:978101 上传时间:2019-03-13 格式:PDF 页数:3 大小:19.82KB
下载 相关 举报
NAVY MIL-C-82733 A (2)-2001 CARTRIDGE IMPULSE CCU-22 A A ASSEMBLY《CCU-22 A A型炮筒推动装置》.pdf_第1页
第1页 / 共3页
NAVY MIL-C-82733 A (2)-2001 CARTRIDGE IMPULSE CCU-22 A A ASSEMBLY《CCU-22 A A型炮筒推动装置》.pdf_第2页
第2页 / 共3页
NAVY MIL-C-82733 A (2)-2001 CARTRIDGE IMPULSE CCU-22 A A ASSEMBLY《CCU-22 A A型炮筒推动装置》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、1 of 3INCH-POUNDMIL-C-82733A(OS) AMENDMENT 212 June 2001 SUPERSEDINGAMENDMENT 123 October 2000 MILITARY SPECIFICATION CARTRIDGE, IMPULSE, CCU-22/A/A ASSEMBLY This amendment forms a part of MIL-C-82733A, dated 22 June 1988, is a approved for use withinthe Naval Sea Systems Command, Department of the

2、Navy and is available for use by allDepartments and Agencies of the Department of Defense. PAGE 12.1.1, Under Specifications, Military: Delete in its entirety; “MIL-C-82734 Catapult, Aircraft Ejection Seat, CKU-5/A/A Assembly“. Insert the following; “MIL-DTL-82683 Solid Propellant“ “MIL-DTL-82876 Ca

3、tapult, Aircraft Ejection Seat CKU-5B/A“ PAGE 2* 2.1.1, Under Standards, Military: Delete in its entirety; “MIL-STD-453 Inspection, Radiographic“ * 2.2, Insert the following: “AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM E 1742 Standard Practice for Radiographic Examination (DoD adopted) (

4、Application for copies of ASTMs should be sent to the American Society for Testing and Materials, 100 BarrHarbor Drive, West Conshohocken, PA 19428-2959)“ PAGE 33.1.1, fifth line: Delete “MIL-P-82652. The rate“ and insert “MIL-DTL-82683. The rate“. AMSC NO. N4455 FSC 1377 Distribution Statement A: A

5、pproved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-82733A AMENDMENT 223.3.2: Delete paragraph in its entirety and insert the following: “3.3.2 Cartridge grain. The cartridge grain (cartridge p

6、ropellant grain per drawing 5184356) shall be loaded(when the cartridge case is crimped) within 180 days of the oldest cartridge propellant mix. Whenmanufactured as a subassembly of the CKU-5B/A Rocket Catapult, the provisions of MIL-DTL-82876Section 3.3.1.2 shall apply.“ 3.4, second line: Delete “w

7、ith MIL-C-82734 and test“ and insert “with MIL-C-82876 and test“. PAGE 43.5, first line: Delete “with MIL-P-82652“ and insert “with MIL DTL- 82683“. 3.7, second line: Delete “load of 36-41 pounds“ and insert “load of 46-51 pounds“. PAGE 64.4.3, second line: Delete “with MIL-P-82652. Failure“ and ins

8、ert “with MIL-DTL-82683. Failure“. Last line: Delete “of MIL-P-82652 shall“ and insert “of MIL-DTL-82683 shall“. * 4.4.4, first sentence, Change from: “Four cartridge case and grain assemblies“ to “Two cartridge propellantgrains“. PAGE 7* 4.5.1.5, third line: Change from: “cartridge case and grain a

9、ssembly“ to “cartridge propellant grain“. PAGE 8* 4.5.2.5, first line: Change from: “50“ to “20“. PAGE 94.5.5, Note, first line: Delete “of the CKU-5A/A rocket with MIL-C-82734, a separate“ and insert “of the CKU-5B/A rocket with MIL-DTL-82876, a separate“. * 4.5.6, second line: Change from: MIL-STD

10、-453, radiographic quality level 1“ to “ASTM E 1742, level 2-2T“Eighth line: Change from: “8 years“ to “10 years“. 4.5.7, second line: Delete “at 36-41pounds“ and insert “at 46-51 pounds“. PAGE 106.1, first line: Delete “the CKU-5/A/A aircraft“ and insert “the CKU-5B/A aircraft“. Provided by IHSNot

11、for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-82733A AMENDMENT 23PAGE 116.3.8, second line: Delete “pellets, cartridge case and grain assemblies, propellant“ and insert “pellets,cartridge propellant grains, propellant“. PAGE 126.8, first line: Delete “of 7 year

12、s of 7 years“ and substitute “of 9 years of 9 years“. Note: The margins of this amendment are marked with asterisks to indicate where changes from theprevious amendment were made. This was done as a convenience only and the Government assumes noliability whatsoever for any inaccuracies in these nota

13、tions. Bidders and contractors are cautioned to evaluatethe requirements of this document based on the entire content irrespective of the marginal notations andrelationship to the last previous amendment. . . Preparing activity: Navy OS (Project 1377-0159) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1