NAVY MIL-D-46606 B-1991 DELAY ELEMENT CARTRIDGE M8 ASSEMBLY《M8型炮筒延迟发射装置》.pdf

上传人:twoload295 文档编号:978337 上传时间:2019-03-13 格式:PDF 页数:14 大小:508.30KB
下载 相关 举报
NAVY MIL-D-46606 B-1991 DELAY ELEMENT CARTRIDGE M8 ASSEMBLY《M8型炮筒延迟发射装置》.pdf_第1页
第1页 / 共14页
NAVY MIL-D-46606 B-1991 DELAY ELEMENT CARTRIDGE M8 ASSEMBLY《M8型炮筒延迟发射装置》.pdf_第2页
第2页 / 共14页
NAVY MIL-D-46606 B-1991 DELAY ELEMENT CARTRIDGE M8 ASSEMBLY《M8型炮筒延迟发射装置》.pdf_第3页
第3页 / 共14页
NAVY MIL-D-46606 B-1991 DELAY ELEMENT CARTRIDGE M8 ASSEMBLY《M8型炮筒延迟发射装置》.pdf_第4页
第4页 / 共14页
NAVY MIL-D-46606 B-1991 DELAY ELEMENT CARTRIDGE M8 ASSEMBLY《M8型炮筒延迟发射装置》.pdf_第5页
第5页 / 共14页
点击查看更多>>
资源描述

1、MIL-D-46bObB 13 9999906 0476826 I W I INCH-POUND -1 MILITARY SPECIFICATION MILD-46606B 23 Aori1 1991 SUPERSEDING MILD-46606A 31 July 1968 Amendment 1 DELAY ELEMENT, CARTRIDGE, M8 ASSEMBLY is specification is approved for use by all Departments and Agencies of the Deparhnent of Defense. 1. SCOPE 1.1

2、Scope. This specification covers the requirements for the M8 Cartridge Delay Element (see 6. i). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications, standards, and handbooks. The following specifications and standards form a part of this document to the extent specified herein. U

3、nless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited in the solicitation (see 6.2). 0 SPECIFICATIONS MILITARY MIL-B-550 Barium Chromate MIL-A-2550 Ammunition,

4、General Specification for MIL-B-51092 Baron, Amorphous, Powder MIL-(2-60539 Coating, Anodic, Conventional for Aluminum and Aluminum Alloy Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commandi

5、ng Officer, Naval Ordnance Station, Standardization Branch (3730), Indian Head, Maryland 20640-5000, by using the self addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC NIA FSC 1377 DISTRIBUTION STATEMENT A: Approved for p

6、ublic release; distribution is unlimited. 0 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-4bbBbB 13 = 999990b 047bA27 3 L MIL-D-46606B STANDARDS MILITARY MIL-STD-105 MIL-STD-109 MIL-STD-453 Inspection, Radiographic MIL-STD-8 10 Sampling Proce

7、dures and Tables for Inspection by Attributes Quality Assurance Terms and Definitions Environmental Test Methods and Engineering Guidelines (Unless otherwise indicated, copies of federal and military specifications and standards are available from Standardization Documents Order Desk, Building 4D, 7

8、00 Robbins Avenue, Philadelphia, PA 191 11-5094.) 2.1.2 Other Government documents, drawings, and publications. The following Government drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2). DR

9、AWINGS NAVAL ORDNANCE STATION (CAGE Codes 19200 and 19203) DL8593 163 Delay Element, Cartridge, M8, Assembly 8826728 Ammunition, Container, Metal, M21 for Delay Element, M5 or M8 8826729 Box, Packing, Ammunition, for Delay Element, M5 or M8 in Metal Container M21 (Application for copies should be ad

10、dressed to: Commanding Officer, Naval Ordnance Station, Data Control Branch (Code 3720), Indian Head, MD 20640-5000.) 2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this doc

11、ument, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified in the contract or purchase order, a first article sample shall be subjected to first article inspection (see 4.4, 6.2, and 6.3). 3.2 Conformanc

12、e to documents. The M8 delay element covered by this specification shall be manufactured in accordance with DL8593 163 and all documents listed thereon. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-4660bB 13 W 9999906 0476828 5 W MIL-D4660

13、6B 3.3 Materiais. All materials used in the manufacture of the cartridges shall conform strictly to the specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufact

14、ure. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.4 Components. 3.4.1 Primary components. For the purpose of this specification, the M42 Primer, Delay Charge and the output material charge.are cons

15、idered primary components. Only primary components from a single lot shall be used in a production lot of cartridges; however, one primary component production lot may be used in more than one cartridge production lot (see 6.7). 3.4.1.1 Primer. The primer shall conform to the applicable drawing and

16、reference specification. Only percussion primers from lots manufactured within the last 24 months or recertified within the last 12 months shall be used in these units. Prior to assembly into a delay element, the primer shall be visually examined in accordance with 4.6.5 and radiographically examine

17、d for defects as specified in 4.7.1. 3.4.2 Protective finish. The finish of each component part shall be in accordance with MIL-Cd0539 and the applicable drawing (see 4.7.2). 3.5 Assembly. 3.5.1 Radiographic examination. Each delay element assembly shall be radiographically examined for defects (see

18、 4.7.3). 3.5.2 Vibration. The assembled delay element shall withstand vibration as prescribed in MIL-STD-810, Method 514.3, Test Procedure I, Test Condition 1-3.2.5 without evidence of any disintegration of the primer, propellant, or igniter, or derangement of any component (see 4.7.4 and 6.2). 3.6

19、Functional requirements. 3.6.1 Delay element performance. 3.6.1.1 Misfires. The ignition delay element shall not fail to fire. 3.6.1.2 Ballistics. The ignition delay charge shall consist of barium chromate, as specified in MIL-B-550, and boron, as specified in MIL-B-51092, in the proportion and quan

20、tity fixed by the contractor to produce the ignition delay times required in table I (see 6.6. i). 3.7 Workmanship. Delay elements shall be free of cracks, splits, or other defects which might prevent proper mating with connecting parts or proper functioning of the device. 3 Provided by IHSNot for R

21、esaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-4bbObB 13 W 999990b 0476829 7 H 195 to 205 MIL-D-4660633 .80 1.10 TABLE I. Ballistic reuuirements. Ignition delay time (sec) I I Temperature (O F) I Lower I upper I II -60 to -70 I .90 I 1.30 II 11 65 to 75 I .90 I 1.10

22、II 3.7.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.7.3 Foreign matter. No part or assembly shall contain chips, dirt, grease, rust, corrosion, or other foreign matter. 4. QUALITY ASSUR

23、ANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise specified in the contract or purchase or

24、der, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in this specification where such inspections a

25、re deemed necessary to ensure supplies and services conform to prescribed requirements (see 6.2). 4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors overall inspection s

26、ystem or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspection, as

27、part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements; however, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to accept defective material. 4.1.2 Quality assurance terms and

28、 definitions. Reference shall be made to MIL-STD-109 to define the quality assurance terms used. 4.1.3 Inspections. Inspections shall be in accordance with MIL-A-2550 and MIL-STD-453. 4 O Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-f a MIL-D-4bbO

29、bB 13 = 9999906 0476830 3 = Test Protective finish Vibration I MIGD-46606B Type of test Destructive Nondestructive Sample size 23 Delay bodies X - 23 Primer retainers X - 12 - X (from ballistic sample) 4.2 Classification of inspections. The inspection requirements specified herein are classified as

30、follows: Requirement 3.4.2 3.5.2 3.6 a. b. First article inspection (see 4.4) Quality conformance inspection (see 4.5) Test 4.7.2 4.7.4 4.7.5 4.3 Inspection conditions. Unless otherwise specified in the contract or purchase order (see 6.2), inspection conditions shall be as follows: Function tests a

31、. b. Altitude: Sea level c. d. Atmospheric: 14.7 psia Temperature: Room ambient 20“ to 25“ C (68“ to 77“ F) Humidity: 50 percent relative, maximum 21 X - 4.4 First article inspection. At the beginning of regular production, the contractor shall submit a first article sample to a Government approved

32、facility for evaluation. The sample shall consist of 23 delay bodies, 23 primer retainers, 21 units for ballistics, to be tested as indicated in table II, and 10 sets of unassembled components (including explosive components) for visual and dimensional examination. The first article sample shall be

33、manufactured using the same materials, equipment, processes, and procedures as used in regular production. All parts and materials, including packaging and packing, shall be the same as used for regular production and shall be obtained from the same source of supply. When it becomes necessary to mak

34、e a change in either the primer, propellant, or igniter lot after initial production, 12 assembled delay elements from the first production lot thereafter shall be tested in accordance with 4.7.5. The Government reserves the right to require new first article samples until such time as an acceptable

35、 sample is submitted (see 6.3). TABLE II; First article inspection. 44.1 Examination, tests, and facility, After provisional acceptance at source, the sample shall be inspected for all requirements of the drawings and specifications at a Government laboratory or other such facility specified in the

36、contract (see 6.2). 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-4bbObB 13 W 9999906 0476831 5 W Temperature (O F) -60 to -70 MILD-46606B 4.4.2 Temperature conditioning for ballistic test. The sample shall be temperature conditioned and te

37、sted to determine compliance with 3.6.1.2. The sample for firing shall be conditioned to table III. Not vibrated Vibrated 3 4 TABLE III. Temperature conditioning. 195 to 205 3 4 II 65 to 75 I 3 I 4 II 4.5.1.1 Submission of product. The product shall be submitted in accordance with MIL-STD-105. 4.5.1

38、.2 &at size. Unless otherwise specified (see 6.2), the production lot size shall be not more than 1200. 4.5.2 Examination and tests. The quality conformance sample shall be subjected to the examinations of 4.6 and all the test procedures of 4.7 except for 4.7.4. 4.6 Examination. All delay elements a

39、nd components shall be examined visually and radiographically and characteristics defined in accordance with the applicable drawings. One hundred percent examination shall be performed for all critical defects. Examination for major or minor defects shall be performed on a defect basis in accordance

40、 with the classification of defects. Four power (4X) magnification may be used in performing visual examination for such*defects as burrs and foreign matter. When compliance is in doubt as a result of visual inspection, the characteristic shall be measured or gaged to determine acceptability. All no

41、nconforming items shall be rejected. 4.6.1 Delay Element, M8, Assembly Drawing 8593163. Characteristic Defect . Method of Inspection Critical 1 Any part missing 2 Improper assembly 3 Primer not properly seated 4 5 Primer uncrimped or seal missing Marking missing incorrect or illegible X-ray/Visual X

42、-ray/Visual X-ray N isual Visual Visual 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-P MIL-D-4bbObB 13 I 9999906 047b32 7 0 Characteristic MILD-46606B Defect Method of Inspection Major 101 Concentricity of head with body Gage 102 Junction of del

43、ay body, gasket and primer retainer not properly sealed Visual Metal defective Visual Visual 103 104 Protective finish inadequate or defective 105 Burr Visual 106 Foreign matter present Visual Minor 201 Total length, rnax 202 Diameter of body, rnax 4.6.2 Body Delay, Drawing 8594081, covering a detai

44、l of Drawing 8593163. Critical 1 2 Metal defective Flash hole missing or obstructed Maior loi 103 104 105 106 107 108 109 110 111 112 Minor 201 202 203 204 205 206 207 208 209 210 Pitch diameter, external thread, min Major diameter, external thread, min Concentricity of body with pitch diameter of t

45、hread Diameter of cavity, max Diameter of head, min Diameter of flash hole Diameter of thread relief Length from cavity face to shoulder of head diameter Protective finish inadequate or defective Thread damaged or not full Burr Foreign matter present Pitch diameter of external thread, max Diameter o

46、f wrench hole Diameter of thread pilot Diameter of cavity, min Diameter of head, rnax Diameter of step rear of head Depth of wrench hole Depth to base of cavity Total length Length of step rear of head Gage Gage Visual Visual 7 Gage Gage Gage Gage Gage Gage Gage Gage Visual visual visual Visual Gage

47、 Gage Gage Gage Gage Gage Gage Gage Gage Gage . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-4bbObB 13 W 9997906 047b33 9 W MIL-D-46606B Characteristic Defect Method of Inspection 211 Length of thread pilot 212 Width of thread relief 213 Loc

48、ation of wrench hole 214 215 Surface finish improper Radius or chamfer missing or incorrect Gage Gage Gage Visual Visual 4.6.3 Gasket, Aluminum, Drawing 8594082, covering a detail of Drawing 8593163. Critical None defined Major 101 Diameter, outside, min 102 Diameter, inside, max 103 Metal defective

49、 104 Burr 105 Foreign matter present Minor 201 Diameter, outside, rnax 202 Diameter, inside, min 203 Thickness 204 Surface finish improper Gage Gage Visual Visual Visual Gage Gage Gage Visual 4.6.4 Primer, Retainer, Drawing 8594083, covering a detail of Drawing 8593163. Critical 1 2 Depth of primer pocket 3 Metal defective Flash hole missing or obstructed Major 101 102 103 104 105 106 107 108 109 110 111 Pitch diameter of interna

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1