NAVY MIL-I-60595 (1)-1970 INITIATOR CARTRIDGE ACTUATED XM107 METAL PARTS ASSEMBLY《XM107火药驱动起始装置金属装配件》.pdf

上传人:eventdump275 文档编号:979935 上传时间:2019-03-12 格式:PDF 页数:3 大小:118.72KB
下载 相关 举报
NAVY MIL-I-60595 (1)-1970 INITIATOR CARTRIDGE ACTUATED XM107 METAL PARTS ASSEMBLY《XM107火药驱动起始装置金属装配件》.pdf_第1页
第1页 / 共3页
NAVY MIL-I-60595 (1)-1970 INITIATOR CARTRIDGE ACTUATED XM107 METAL PARTS ASSEMBLY《XM107火药驱动起始装置金属装配件》.pdf_第2页
第2页 / 共3页
NAVY MIL-I-60595 (1)-1970 INITIATOR CARTRIDGE ACTUATED XM107 METAL PARTS ASSEMBLY《XM107火药驱动起始装置金属装配件》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MILITARY SPEC IF ICAT IOE METAL PARTS ASSEMBLY INITIATOR, CARTRIDGX ACTUATED, mi07 This anendment forms a part of Military Specification MIL-0595(MU) dated 25 October 1966. Paragraph 2.1 Under STANDARD delete the followkg: “MIL-STD-639 “MIL-STD-i167 - Ammunition Data Card“ - Surface Roughness Values

2、 Preferred for Army Ordnance Materiel“ - Following the parenthetical note of paragraph 2.1, add tne following: “2.2 Other publications.- The following document forms a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on date of invitation for

3、 bids or request for proposal shall apply. ASA B46.1 - Surface Texture (Application for copies should be addressed to the herican Standards Association, 10 East 40th Street, New York, N.Y. 10016) * Paragraph 3.2: Delete in its-entirety, Paragraph 4.1: Delete and substitute: “4.1 Responsibility for i

4、nspection. - Unless otherwise specified in the contract or purchase order, the supplier is responsible Tor the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the

5、 performance of the inspection requirements speci- fied herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forti in the specification where such inspections are deemed necessary to assure su7plies and services conform to prescribed r

6、equirements. 1377 I- / + 3 PAGES. - - - Y - - _- . -.- THIS DOCUMENT CONTAINS Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Paragraph 4.3.2, fines 8 and 9: delete “The Ordnance Standard Finish Blocks prescribed in MIL-STD-639“ and substitute: spech

7、ens prescribed in ASA B46.i“ “Lile roughness comparison Paragraph 4.3.2.3 Delete and substitute: “4.3.2.3 Pin , initiator , Drawir,g C11730531, covering a detail of Drawing F10535977. CRITICAL None defined MAJOR 101. 102. 103. 104. 105. i06 * 107. 108. 109s no. lu. 112. il3 4 33.4. 115. 116. 117. 11

8、8. 119. 120 121. MINOR 201. 202. 203 204. 205 206. 207. Concentricity of groove in head with body Concentricity of head with body Pitch iameter, max. Diameter of body Diameter of head (front) Diameter of head (rear) Diameter of groove in body Diameter of groove in head Diameter of pin hole Width of

9、head groove Width of slot in head Location of pin hole from rear head Location of pin hole from front head Location of body groove Thickness of head (rear) Hardness Met al defect ive :?rotective finish inadequate Surface finish improper Burr Foreign matter Pitch diameter, min. Minor diameter, max. W

10、idth across hea flats Total length Radius of body groove Radii or chamfer missing or incorrect Surface finish improper except as otherwise classified. Page 2 of 3 Pages Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Visual Visual Visual !Gage Visual Visual Gage Gage

11、Gage Gage Visual Visual Visual Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Add paragraph 4.3.2.13 : “4.3.2.13 Screw Pin, Drawing C11730532, covering a detail of Drawing Fi0535977 Defect CRITICAL None defined MAJOR 101. 102. MINOR 201. 202. 203. 2

12、04. 205. 206. 207. 208. 209. 210 211. Pitch diameter, min. Locking element missing or incorrect Pitch diameter, max. Major diameter, Max. Diameter of head Length of body Thickness of head Depth of slot Width of slot Profile of head Radius or chamfer missing or incorrect Protective finish inadequate

13、Surface finish improper Pmagraph 5.2: Delete in its .entirety. Custodian: Army-Mu Xethod of Inspection Gage Visual/Gage Gage Gage Gage Gage Gage Gage Gage Visual Visual Visual Visual Preparing Activity: Army - MU Project No. 1377-A385 J Page 3 of 3 Pages Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1