NAVY MIL-P-15554 B (2)-1986 PROPELLER REVOLUTION INDICATING EQUIPMENT SYNCHRO (NAVAL) SHOW 180《同步(海军)显示180的螺旋桨转数指示设备》.pdf

上传人:吴艺期 文档编号:980528 上传时间:2019-03-12 格式:PDF 页数:3 大小:110.62KB
下载 相关 举报
NAVY MIL-P-15554 B (2)-1986 PROPELLER REVOLUTION INDICATING EQUIPMENT SYNCHRO (NAVAL) SHOW 180《同步(海军)显示180的螺旋桨转数指示设备》.pdf_第1页
第1页 / 共3页
NAVY MIL-P-15554 B (2)-1986 PROPELLER REVOLUTION INDICATING EQUIPMENT SYNCHRO (NAVAL) SHOW 180《同步(海军)显示180的螺旋桨转数指示设备》.pdf_第2页
第2页 / 共3页
NAVY MIL-P-15554 B (2)-1986 PROPELLER REVOLUTION INDICATING EQUIPMENT SYNCHRO (NAVAL) SHOW 180《同步(海军)显示180的螺旋桨转数指示设备》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MlL-P-155541i ( SH I PS ) AMENDMENT 2 28 November 1986 SUYEKSb:DIKG AMENDMENT 1 1 March 1967 MILLTAKY SPECLPICtlTION PKOPELLKK KEVOLUTION INI) LCATINC EQUIlhENT, SYNCHRO (NAVAL SHIPBOARD USE) his amt?ndmriit forms a part of MIL-P-l5554B(SHlPS), dated 9 November 190 1, ;tiid is approved for use withi

2、n the Naval Sea Systems Command, cpartincnt oi tlie Nrivy, and is available for use by all Departiiieiits and Agencies of tlie Lkyartmeiit of Defense. PAGES 2 and 3 2.1 : Under SPEC1FlCATIONS MILLTARY: Delete “MIL-F-22843.“ 2.1: Under STANDARDS MILITARY: Add “MIL-STD-740 - Airborne and Structure- bo

3、rne Noise Measurements and Acceptance Criteria of Shipboard Equipment.“ PAGE 4 * 3.1: elete and substitute: “3.1 First article. When specified in the contract or purchase order, a sample shall be subjected to first article inspection (see 4.2 and 6.2): PAGE 7 3.13, lines 3 and 4: Delete “grade B noi

4、se requirements of MIL-E-22843, as specified (see 6.1)“ and substitute “noise requirements of MIL-STD-740 for type 3 equipment, as specified (see 6.1). Equipment undergoing structureborne test shall be non-solidly niountd, with acceptance criteria increased by 12 decibels.“ AMSC NIA FSC 6320 DISTRIB

5、UTION STATEMENT A Approved for public release; distribution unlimited 1 of 3 Licensed by Information Handling ServicesProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-* MIL-P-155548 (2) b3 9999906 023b953 3 MIL-P-l5554B(SHIPS) AMENDENT 2 PAGE 11 4.1:

6、Delete and substitute: “4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. in the contract or purchase order, the contractor may use his own or any othe

7、r facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and servi

8、ces conform to prescribed requirements. Except as otherwise specified * 4.1.1 Responsibility for compliance. All items must meet all requirements of sections 3 and 5. a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specificati

9、on shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling in quality conformance does not authorize submirion of known defective material, either indicated or a

10、ctual, nor does it commit the Government to acceptance of defective material.“ The inspection set forth in this specification shall become * * * 4.2: Delete and substitute: “4.2 First article inspection. First article inspection shall consist of the tests specified in 4.2.1.“ 4.2.1, line 1: Delete “

11、qualification“ and substitute “first article.“ At bottom of page: Delete footnote L/ in its entirety. PAGE 13 4.4.2, line 4: Delete “MIL-E-22843 and substitute “MIL-STD-740.“ 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-LSSSYB (2) b3 99997

12、0b 023b95Li 5 HIL-P-l5554B(SHIPS) AMEND.?ENT 2 PAGE 15 * 6.2 Delete and substitute: “6.2 First article. When a first article inspection is required, the items should be a first article sample. The first article should consist of one unit. The contracting officer should include specific instructions

13、in acquisition docu- ments regarding arrangements for examinations, approval of first article test results and disposition of first articles. Invitations for bids should provide that the Government reserves the right to waive the requirement for samples for first article inspection to those bidders

14、offering a product which has been pre- viously acquired or tested by the Government, and that bidders offering such products, who wish to rely on such production or test, must furnish evidence with the bid that prior Government approval is presently appropriate for the pending contract. “ * 6.2.1: D

15、elete in its entirety. LAST PAGE Di) Form 1426, Standardization Document Improvement Proposal: Delete address and substitute: “ COMMANDER NAVAL SEA SYSTEMS COMMAND (SEA 5523) DEPARTMENT OF THE NAVY WASHINGTON, DC 20362-5101“ NOTE: The margins of this amendment are marked with asterisks to indicate w

16、here changes (additions, modifications, corrections, deletions) from the previous amendment were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. 3 Preparing activity : Navy - SH (Project 6320-N023) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1