NAVY MIL-S-82529 (1)-1970 SWITCH THERMAL MARK 56 MOD 1《 MARK 56 MOD 1热动开关》.pdf

上传人:proposalcash356 文档编号:981769 上传时间:2019-03-12 格式:PDF 页数:1 大小:56.13KB
下载 相关 举报
NAVY MIL-S-82529 (1)-1970 SWITCH THERMAL MARK 56 MOD 1《 MARK 56 MOD 1热动开关》.pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MILmY SiXCIFICATIN SWITCH, THERMAL, MARK 56 KID 1 This amendment forms a part of Military Specification MIL-S-82529 (OS) of 18 April 1968 and has been approved by the Naval Ordnance Systems Command, Department of the Navy. ? Wherever it appears in specification “Bureau of Naval Weapons“ shall be cha

2、nged to read “Naval Ordnance Systems Cornniand“ and BuWeps“ shall be changed to read “XAVOFD.“ Page 5, paragraph 4.1. Delete and substitute: “4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the supplier is responsible for the per- forniance of all ins

3、pection requirements as specified herein. Except as . otherwise specified in the contract or order, ths supplier may use his own or any other facilities suitable for the performme of the inspc- t ion requhenients spec if ied here in, unless disapproved by the Government The Goverrinient reserves the

4、 right to perform any of the hspections set forth in the Specification where such inspzctions are deenied necessary to assure supplies and services conform to prescribed requirenients -“ ge 8, paragraph 4.4.1, Item “h“ : Page 18, paragraph 5.2.1, iine 4: e * 0 blete “200 plus or minus 25 rp“ . Il and substitute “600 plus or minus 25 rpm. _. Delete “The gross weigEit of eight pack and substitute “The gross weight of the pack =. . Preparing Activity Havy - OS Project No. 1340-h 300 I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1