NAVY MIL-T-46948 A-1968 THRUSTER CARTRIDGE ACTUATED M11 ASSEMBLY《M11集合发动弹药筒推进器》.pdf

上传人:Iclinic170 文档编号:982734 上传时间:2019-03-12 格式:PDF 页数:10 大小:360.74KB
下载 相关 举报
NAVY MIL-T-46948 A-1968 THRUSTER CARTRIDGE ACTUATED M11 ASSEMBLY《M11集合发动弹药筒推进器》.pdf_第1页
第1页 / 共10页
NAVY MIL-T-46948 A-1968 THRUSTER CARTRIDGE ACTUATED M11 ASSEMBLY《M11集合发动弹药筒推进器》.pdf_第2页
第2页 / 共10页
NAVY MIL-T-46948 A-1968 THRUSTER CARTRIDGE ACTUATED M11 ASSEMBLY《M11集合发动弹药筒推进器》.pdf_第3页
第3页 / 共10页
NAVY MIL-T-46948 A-1968 THRUSTER CARTRIDGE ACTUATED M11 ASSEMBLY《M11集合发动弹药筒推进器》.pdf_第4页
第4页 / 共10页
NAVY MIL-T-46948 A-1968 THRUSTER CARTRIDGE ACTUATED M11 ASSEMBLY《M11集合发动弹药筒推进器》.pdf_第5页
第5页 / 共10页
点击查看更多>>
资源描述

1、29 May 1968 SITPERSEDING MI -46948A( MU) Method of Inspection Visual Visual Visual Visual Manual Manual Manual Visual Visual Visual Visual Visual Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-LI67LIA 33 7777906 0334723 3 I MIL-T-46948A( MU) 4

2、2.2.7 MINOR (Cont Defect Method of Inspection 203. Strapping missing, loose, broken or 204. Contents of box exposed Visual 205. Box damaged Visual 206. Marking missing, incorrect or illegible Visual 207. Number of units incorrect Visual 208. Car seal missing, unsealed or improperly positioned Visua

3、l improperly engaged Manual nd marking.- Level A - Packing and marking shall be in accord- ance idth Drawings C8800969 and 8800970. 5.2 Data cards.- Data card information shall be as specified in MIL-sTD-. Y - - 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license f

4、rom IHS-,-,-MI -46948 (MU) 6.1 A “mechanical failure“ is defined as any deformation or breakage of a part, the occurrence of which is other than a design function. for rejection when the thrusters are tested with no load on the body. 6.2 No load.- Permanent yielding of the body or tubes shall not be

5、 cause 6.3 - Load,- The expected performance of the thruster under conditions simu- lating those existing in aircraft is obtained when thrusters satisfactorily meet conditions of the load firing, 6.4 “Ignition delay“.- is defined as the time lapse between the firing of the cartridge and the beginning of the continuous pressure rise in the body of the thruster. Custodian: Preparing activity: Army - M Army - M Project No. 1377-A241 -,- - 10 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DIN CLC TS 50534-2011 Railway applications - Generic system architectures for onboard electric auxilary power systems German version CLC TS 50534 2010《轨道交通 船上电气辅助动力系统用通用系统架构 德文版本CL.pdf DIN CLC TS 50534-2011 Railway applications - Generic system architectures for onboard electric auxilary power systems German version CLC TS 50534 2010《轨道交通 船上电气辅助动力系统用通用系统架构 德文版本CL.pdf
  • DIN CLC TS 50537-1-2011 Railway applications - Mounted parts of the traction transformer and cooling system - Part 1 HV bushing for traction transformers German version CLC TS 5053.pdf DIN CLC TS 50537-1-2011 Railway applications - Mounted parts of the traction transformer and cooling system - Part 1 HV bushing for traction transformers German version CLC TS 5053.pdf
  • DIN CLC TS 50537-2-2011 Railway applications - Mounted parts of the traction transformer and cooling system - Part 2 Pump for insulating liquid for traction transformers and reacto.pdf DIN CLC TS 50537-2-2011 Railway applications - Mounted parts of the traction transformer and cooling system - Part 2 Pump for insulating liquid for traction transformers and reacto.pdf
  • DIN CLC TS 50537-3-2011 Railway applications - Mounted parts of the traction transformer and cooling system - Part 3 Water pump for traction converters German version CLC TS 50537-.pdf DIN CLC TS 50537-3-2011 Railway applications - Mounted parts of the traction transformer and cooling system - Part 3 Water pump for traction converters German version CLC TS 50537-.pdf
  • DIN CLC TS 50537-4-2011 9375 Railway applications - Mounted parts of the traction transformer and cooling system - Part 4 Gas and liquid actuated (Buchholz) relay for liquid immers.pdf DIN CLC TS 50537-4-2011 9375 Railway applications - Mounted parts of the traction transformer and cooling system - Part 4 Gas and liquid actuated (Buchholz) relay for liquid immers.pdf
  • DIN CLC TS 50539-22-2010 3750 Low-voltage surge protective devices - Surge protective devices for specific application including d c - Part 22 Selection and application principles .pdf DIN CLC TS 50539-22-2010 3750 Low-voltage surge protective devices - Surge protective devices for specific application including d c - Part 22 Selection and application principles .pdf
  • DIN CLC TS 50544-2010 Low voltage d c surge protective device for traction systems - Selection and application rules for surge arresters German version CLC TS 50544 2010《牵引系统用低压直流电.pdf DIN CLC TS 50544-2010 Low voltage d c surge protective device for traction systems - Selection and application rules for surge arresters German version CLC TS 50544 2010《牵引系统用低压直流电.pdf
  • DIN CLC TS 50546-2013 Railway applications - Rolling stock - 3-phase shore (external) supply system for rail vehicles German version CLC TS 50546 2013《轨道交通 轨道车辆 轨道车辆用三相(外部)供应系统 德文版.pdf DIN CLC TS 50546-2013 Railway applications - Rolling stock - 3-phase shore (external) supply system for rail vehicles German version CLC TS 50546 2013《轨道交通 轨道车辆 轨道车辆用三相(外部)供应系统 德文版.pdf
  • DIN CLC TS 60034-18-33-2011 Rotating electrical machines - Part 18-33 Functional evaluation of insulation systems - Test procedures for form-wound windings - Multifactor evaluation.pdf DIN CLC TS 60034-18-33-2011 Rotating electrical machines - Part 18-33 Functional evaluation of insulation systems - Test procedures for form-wound windings - Multifactor evaluation.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1