NAVY MIL-V-5524 B-1957 VALVES CHECK HYDRAULIC AIRCRAFT TYPE I SYSTEMS《飞行器I型系统液压检验阀》.pdf

上传人:bowdiet140 文档编号:983110 上传时间:2019-03-12 格式:PDF 页数:10 大小:403.57KB
下载 相关 举报
NAVY MIL-V-5524 B-1957 VALVES CHECK HYDRAULIC AIRCRAFT TYPE I SYSTEMS《飞行器I型系统液压检验阀》.pdf_第1页
第1页 / 共10页
NAVY MIL-V-5524 B-1957 VALVES CHECK HYDRAULIC AIRCRAFT TYPE I SYSTEMS《飞行器I型系统液压检验阀》.pdf_第2页
第2页 / 共10页
NAVY MIL-V-5524 B-1957 VALVES CHECK HYDRAULIC AIRCRAFT TYPE I SYSTEMS《飞行器I型系统液压检验阀》.pdf_第3页
第3页 / 共10页
NAVY MIL-V-5524 B-1957 VALVES CHECK HYDRAULIC AIRCRAFT TYPE I SYSTEMS《飞行器I型系统液压检验阀》.pdf_第4页
第4页 / 共10页
NAVY MIL-V-5524 B-1957 VALVES CHECK HYDRAULIC AIRCRAFT TYPE I SYSTEMS《飞行器I型系统液压检验阀》.pdf_第5页
第5页 / 共10页
点击查看更多>>
资源描述

1、MIL-V - 5524BtASG) . 4 JUNE 1957 Class Maximum rated hydraulic system pressure - psi 1500 1,500 3000 3,000 Superseding MIL-v-5524A 17 March 1950 (See section 6.) MILITARY SPECIFICATION VALVES, CHECK, HRALIC, AIRCRAFT, TYPE I SYSTEW This specification has been approved by the Department of the Air Fo

2、rce and by the Navy Bureau of Aeronautics. 1. SCOPE 1.1 Scope.- This specification covers the detail requirements for aircraft hydraulic check valves for use in type I systems (-6s to +160F). sizes, as specified (see 6.3): 1.2 Cassificati0n.- Valves shall be of the following classes, styles, and 1.2

3、.1 Classes.- Check valves shall be furnished in the classes specified in table I. TABLE I Pressure ratings TABLE II Drawings for check valves 1 Stile I CF I CYla I AN 207 AN 2 9 - MS288W - AN6280 f . THIS DOCUMENT CONTAINS / Hydraulic, Aircraft, Petroleum Base MIL-0-6083 Oil; Preservative, Hydraulic

4、 Equipmnt MJLJi-8 7 75 Hydraulic System Components, Aircraft, General Specification for S28890 Valve, Hydraulic Check, 3,000 PSI. Flareless, Type I Systems D-GS Air Farce-Navy Aeronautical Standard Drawings AN6207 AN6249 AN6280 Valve - 1500 PSI Hydraulic Check Valve - 3000 PSI Hydraulic Check Valve

5、- 3000 PSI Hyraulic Check Internal Ports (Copies of specifications and standards required by contractors in connection dth specific procurement functions should be obtained frm the procuring activity or as directed by the contracting officer.) 3. REQUUIREMENTS 3.1 Qualification.- “he hydraulic check

6、 valves furnished under this specification shall. be a product which has been tested and has passed the Qualification tests specified herein. 3.2 General.- “he requiremnts of Specification MIL-H-8775 apply as requirements of this specification with the exceptions and additions specified herein. 3.2.

7、1 in the event the requiranents of the general specification and this speci- fication conflict, the requirements of this specification shall govern. offers fhe least resistance to flow and the minimum possible weight consistent with the requirements of this specification. fied in the applicable AN d

8、rawings and MS standards specified in table II. 3.3 Design and construction.- The design of the check valves shall be one that 3.3.1 The configuration, dimensions,and other details of design shall be as speci- 4. QUALITY ASSURANCE PROVISIONS 4.1 . Classification of tests.- valves shall be classified

9、 as follows: The inspection and testing of the hydraulic check a) Quaification tests (see 4.3) b) Acceptance tests (see 4.4) 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4.2 4.3. General.- The quaity assurance provisions shall be in accordance w

10、ith Speci- fication MIL-ii-tl775 and as specified herein. this specification, as described under h.7, “Test methods,n and in the der listed in tables III and IV. Qualification tests.- Qualificat5on tests shall consist of ail the tests of TABIE III Manufacturers Qualification tests Required on sample

11、 No. 1 (e) o“ Quaification test -4- UA te it shall then be allowed to check before the static head of fluid decreases to 1 psi. the cessation of fluid flow shall be the checking time and shall not exceed l-lE seconds. Checking time.- The valve shall be held in the vertical position defined The time

12、between the release of the PO pet and The valve poppet shall be mechanically actuated to its full open position 6 - I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. Hydraulic line dimensions valve size -4 -5 -6 -8 -10 -12 -i5 Tube OD (in.) Tube le

13、ngth (in.) l4 l5 l.642 1342 i/4 5/16 19-1/2 23 21 1 4.6.3.2 Crackingp ressure.- ire raualy increasing pressure shall be applied at the valve inlet in the free-flw d otion beginning with zero. Cracking pressure shall be observed and ahall be nut less than 2 psi nor greater than 8 psi. Cracking pressu

14、re is defined as the pressure at which the poppet is unseated allawing flaw equal to or exceed- ing 2 cc per minute through the valve in the free-flow direction. 4.6.4 Press.pre rq.- Fressure drop through the valve shall be measured at a flaw equal to the rated flou capacity. manometer connected acr

15、oss the check valve may be used for accurate measurement of the pressure drop. drop through the valve 0,000 cycles of operation at During the first 45,000 cycles 7 the rate of 30 to 100 cycles per minute. Each cycle shall consist of flow through the valve at the rated flou capacity for the she, foll

16、owed by a reversal of the direction of the flow and aFplication af the maximum rated pressure. of this test, the peds pressure, which occurs during the pressure application portion of Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-L MIL-V-5524B Lb 7

17、797706 OLB473Li L I each cycle, shall be 125 *5 percent of the maximum rated pressure. A typical test setup for endurance cycling is indicated in figure 2. Leakage, as specified in 4.6.2.2, shall be checked upon completion of 22,500 cycles, and the requirements.of that test shall be satisfied. Upon

18、conpietion of 50,000, leakage and operation, as specif$ed in 4.6.2.1 and 4.6.3, mspectively, shall be checked, and the requireyents of those tests shall be satisfied. 4.6.6 High- and lar-temperature functioning.- 4.6.6.1 feet of hydraulic oil in the reverse-flow direction. at a temperature not warme

19、r than -6SF for 72 hours if the valve contains nonmetallic parts other than datic seals. this period may be reduced to 24 hours. After this period, the valve poppet shall be actuatedmechanically at least 2 times. Leakage, as specified herein for Acceptance tests, and operation shall be checked at th

20、e end of the test, and the requirements of those tests (4.6.2.2 and 4.6.3, respectively) shall be satisfied. of 160F. While the temperature is being raised, sufficient mechanical actuations shall be made to determine satisfactory operation throughout the temperature Mge. tests shall be made without

21、waiting for the temperature of the whole unit ta stabilize. Lar temperature.- The valve shall be connected to a static head of 1 to 3 If ail parts of the valve except for static seals are metallic, This arrangament shall be maintained 4.6.6.2 Intermediate.- The test arrangement shall be warmed rapid

22、ly to a temperature These check 4.6.6.3 High temperature.- The temperatures shall be maintained at 160F for a length of time sufficient to allai all parts of the check valve to attain this temperature. With a head of 1 to 3 feet of hydraulic oil on the valve, in the reverse-flow direction, the poppe

23、t shall be actuated mechanically at least Leakage, as specified herein for Acceptance tests, and operation shall be checked at the end of the test, and the requirements of those tests (4.6.2.2 and 4.6.3, respectively) shall be satisfied. 2 tines. 4.6.7 Proof pressure.- The proof pressure specified i

24、n table I: BU be applied to the outlet port, wi%h the inlet port Open, at least 2 successive times and held 2 min- utes for each pressure application. The poppet shall be unseated between applications of the test pressures. There shall be no evidence of leakage, failure, or pemnanent set. Proof pres

25、sure Class I Minimum proof pressure (psi) 1500 I 2.250 4.6.8 Burst pressure.- Pressure shall be applied to the inlet port, with the output The valve shall withstand this burst pressure for a period During port plugged, at a maxjmum rate of 25,000 psi per minute until the burst pressures speci- fied

26、in table XI are obtained. of 2 minutes, the QualFfication test, the pressure may be increased above that apecified in order to secure data on actual burst pressures. The valve shall not rupture under this pressure or leak externally. TABLFIXI Burst pressure I Provided by IHSNot for ResaleNo reproduc

27、tion or networking permitted without license from IHS-,-,-1 I MIL-V-5524B 1b m 7777706 0184735 3 m K . MIL-V- 8 8 5 a fi w E 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-55246 Lb m 7777706 0384736 5 m 5. PREPARATION FOR DELIVERP 5.1 Genera

28、l.- The preparation far eliver-y requirements shaU be in accordance with Specification MIL-H-8775. 6. NOTES 6.1 General.- In addition to the Hotes specified herein, the Notes of Specification MIL-H-8775 -applicable to this specification. 6.2 intended use.- The check valves covered by this specificat

29、ion are intended for The fruiction af the check valves is to allow free flow in use iIi aircraft hydraulic systems conforming to Bpecification MIL-H-O, at operating pressures that do not exceed the values specified herein, with hydraulic fluid conforming to Specification MIL-0-5606. one direction on

30、ly, and prevent flou in the opposite direction. - Valves covered by this specification uere formerly procured which speclfication was later renmberad Cover Sheet MIL-V-5524. 6.b It is understood that check valves suppli.ed under contract will be identical in every respect to the sample tested and fo

31、und satisfactory, and to the detail drawings thereof, except for changes previously approved by the overnment. Any unapproved changes frmthe qualjfcatian sample or fromthe drawings will constitute a cause for rejection. awards will bemade only for such products as have, prior to the bid opening date

32、, been tested and approved for inclusion in the applicable Qualified Products List whether or not such products have actuallybeen so listed by that date. are urged to arrange to have the products that they propose to offer to the Federal Government, tested for qualification in order that they may be

33、 eligible to be warded contracts or orders for the products covered by this specification. ation pertaining to qualification of products covered by this specification should be addressed to the Connuander, Wright Air Development Center, Wright-Patterson Air Force Base, Ohio, the activity responsible

34、 for qualification, with a copy to the Bureau of Aeronautics, Navy Department, Washington 25, D. C. 6.5 Provisions for qualification.- With respect to products requiring qualification, 6.5.1 The attention of suppliers is called to this requirement, aid manufacturers Requests for inform- NOTICE: When

35、 Government drawings, specifications, or other data are used for any purpose other than in connection with a definitely related Goverment procurement operation, the United States Govern- ment thereby incurs no responsibility nar any obligation uhatsoever3 and the fact that the Qoverrnnent may have f

36、ormulated, furnished, or in any way suppied the said drawings, specifications, or other &ta is not to be regarded by implication or otherwise as in any manner licensing the holder or any rlher person or corporation, or conveying any rights or permission to manufacture, use, or sell any patented invention that may in any way be reJated thereto. Custodians: Navy - Bureau of Aeronautics Air Force . 10 Preparing Activity: Air Force Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • EN ISO 75-1-2013 en Plastics - Determination of temperature of deflection under load - Part 1 General test method《塑料 载荷下挠曲温度的测定 第1部分 通用试验方法》.pdf EN ISO 75-1-2013 en Plastics - Determination of temperature of deflection under load - Part 1 General test method《塑料 载荷下挠曲温度的测定 第1部分 通用试验方法》.pdf
  • EN ISO 75-2-2013 en Plastics - Determination of temperature of deflection under load - Part 2 Plastics and ebonite《塑料 载荷下挠曲温度的测定 第2部分 塑料和硬橡胶》.pdf EN ISO 75-2-2013 en Plastics - Determination of temperature of deflection under load - Part 2 Plastics and ebonite《塑料 载荷下挠曲温度的测定 第2部分 塑料和硬橡胶》.pdf
  • EN ISO 75-3-2004 en Plastics - Determination of temperature of deflection under load - Part 3 High-strength thermosetting laminates《塑料 载荷下挠曲温度的测定 第3部分 高强度热固性叠层板和长纤维增强塑料 ISO 75-3-20.pdf EN ISO 75-3-2004 en Plastics - Determination of temperature of deflection under load - Part 3 High-strength thermosetting laminates《塑料 载荷下挠曲温度的测定 第3部分 高强度热固性叠层板和长纤维增强塑料 ISO 75-3-20.pdf
  • EN ISO 7500-1-2004 5625 Metallic materials - Verification of static uniaxial testing machines - Part 1 Tension compression testing machines - Verification and calibration of the fo.pdf EN ISO 7500-1-2004 5625 Metallic materials - Verification of static uniaxial testing machines - Part 1 Tension compression testing machines - Verification and calibration of the fo.pdf
  • EN ISO 7500-1-2015 en Metallic materials - Calibration and verification of static uniaxial testing machines - Part 1 Tension compression testing machines - Calibration and verifica.pdf EN ISO 7500-1-2015 en Metallic materials - Calibration and verification of static uniaxial testing machines - Part 1 Tension compression testing machines - Calibration and verifica.pdf
  • EN ISO 7500-2-2006 en Metallic Materials - Verification of Static Uniaxial Testing Machines - Part 2 Tension Creep Testing Machines - Verification of the Applied Load《金属材料 静态单轴向试验机.pdf EN ISO 7500-2-2006 en Metallic Materials - Verification of Static Uniaxial Testing Machines - Part 2 Tension Creep Testing Machines - Verification of the Applied Load《金属材料 静态单轴向试验机.pdf
  • EN ISO 7518-1999 en Technical Drawings - Construction Drawings - Simplified Representation of Demolition and Rebuilding《技术制图 建筑工程制图 拆除和重建的简化画法 ISO 7518-1983》.pdf EN ISO 7518-1999 en Technical Drawings - Construction Drawings - Simplified Representation of Demolition and Rebuilding《技术制图 建筑工程制图 拆除和重建的简化画法 ISO 7518-1983》.pdf
  • EN ISO 7519-1996 en Technical Drawings - Construction Drawings - General Principles of Presentation for General Arrangement and Assembly Drawings《技术制图 建筑工程制图 总体布置图和安装图画法的一般原则ISO 75.pdf EN ISO 7519-1996 en Technical Drawings - Construction Drawings - General Principles of Presentation for General Arrangement and Assembly Drawings《技术制图 建筑工程制图 总体布置图和安装图画法的一般原则ISO 75.pdf
  • EN ISO 7539-1-2012 en Corrosion of metals and alloys - Stress corrosion testing - Part 1 General guidance on testing procedures《腐蚀金属和合金的应力腐蚀测试 第1部分 通用测试程序的指导意见》.pdf EN ISO 7539-1-2012 en Corrosion of metals and alloys - Stress corrosion testing - Part 1 General guidance on testing procedures《腐蚀金属和合金的应力腐蚀测试 第1部分 通用测试程序的指导意见》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1