NAVY MIL-W-82599-1972 WIRE INSULATED HARD DRAWN ALLOY OF COPPER-CADMIUM NO 23 AWG《AWG23号铜镉硬质合金绝缘线》.pdf

上传人:towelfact221 文档编号:983251 上传时间:2019-03-12 格式:PDF 页数:8 大小:361.20KB
下载 相关 举报
NAVY MIL-W-82599-1972 WIRE INSULATED HARD DRAWN ALLOY OF COPPER-CADMIUM NO 23 AWG《AWG23号铜镉硬质合金绝缘线》.pdf_第1页
第1页 / 共8页
NAVY MIL-W-82599-1972 WIRE INSULATED HARD DRAWN ALLOY OF COPPER-CADMIUM NO 23 AWG《AWG23号铜镉硬质合金绝缘线》.pdf_第2页
第2页 / 共8页
NAVY MIL-W-82599-1972 WIRE INSULATED HARD DRAWN ALLOY OF COPPER-CADMIUM NO 23 AWG《AWG23号铜镉硬质合金绝缘线》.pdf_第3页
第3页 / 共8页
NAVY MIL-W-82599-1972 WIRE INSULATED HARD DRAWN ALLOY OF COPPER-CADMIUM NO 23 AWG《AWG23号铜镉硬质合金绝缘线》.pdf_第4页
第4页 / 共8页
NAVY MIL-W-82599-1972 WIRE INSULATED HARD DRAWN ALLOY OF COPPER-CADMIUM NO 23 AWG《AWG23号铜镉硬质合金绝缘线》.pdf_第5页
第5页 / 共8页
点击查看更多>>
资源描述

1、MIL-W-2577 61 W 7797706 0095L101 3 A-33-07 MIL-W-82599( OS) 14 February 1972 MILITARY SPIICIFICATION WIRE, INSULATED, HARD DRAWN ALLOY OF com-CADMTTJM, NO. 23 AWG This speciflcatlon has been approved by the Naval Ordnance Systems Conmiand, Department of the Navy 1. SCOPE 1.1 Scope. This specificatio

2、n describes a special purpose hard drawn alloy of copper-cadmium conductor insulated with an-ionometric type poly- olefin for underwater use. shall be referred to as “wire.“ Hereinafter, the insulated No. 23 AWG conductor 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on

3、date of invitation for bids or request for proposals form a part of this specification to the extent specified herein. SPECIFICATION Military - MIL-P-46124 4- MIL-W -82 598 Military MIL-STD-O MIL- STD-202 Plastic,Molding and Extrusion Material I onomer Re sin Wire, Copper-Cadmium Alloy Sampling Proc

4、edures and Tables for Inspect ion by Attributes Test Methods for Electronic and Electrical Component Parts (Copies of specifications, standards, drawings, and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as dir

5、ected by the contracting officer. ) I FSC- 6145 1 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ MIL-W-82597 bL M 7779906 0095qOz 5 r- .= -w-825gg( os) .* 2.2 Other publications. The following documents form a part of this specification to the ext

6、ent specified herein. Bhe igsue in effect on date of invitstion for bids or request for proposals shall apply. Unless otherwise indicated, AEIEEUCAN ilNXEPY FOR rI7ESPING AND MATEBIAIS (ABI241 -E 8 Tension Pest (Apgllance of the wire 4,5.6 Dry spark. A dry spark test shall coneist of passing the wir

7、e through a chain-electrode spark testing device which subjects the insulation to an aternating potential of at least 4000 volts rms at 3000 fiz for at least 0.003 second, or at least 4000 volts rm6 at comercial power frequency for a period of not less than 0.20 second, or a potential of at least 50

8、00 volts dc for a period of not less than 0.01 second. constitute a failure. Any flashover shall 5. PREPARATION FOR DELXVERY 5.1 Preservation, packaging, and packing 5.1.1 Cleaning. Not applicable. -e 5.1.2 Preservation application. Not applicable. 5.1.3 Supply reels. The reels used to ship the wire

9、 my be fiber glass, etal, or wood or conibinations in order of preference. burrs, sharp edges, splinters, or other hazards to the wire. There shall be no The reels shall Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-m-w-82599( OS) have an outside f

10、lange diameter of 22 inches maximum, with a drum diameter of 10 inches minimum; a length of 12-3/4 inches maximum, with a traverse of 10 +1 inchesj and an arbor hole of 3 +i/4 inches. Each flange shall have a 3/4 51/32 inch diameter break hole or “dog hole“ 3/4 inch deep (minimum) on a 3-1/2 +i/32 i

11、nch radius from the center of the reel. 5.1.3.1 Reel winding. The wire must be wound uniformly at 7 pounds tension minimum, and at approximately 1/4 inch traverse advance per revolution of the reel. The inside end shall have a free length of at least 72 inches measured from the reel center, and shal

12、l be protected by insulating sleeving or grommets where it passes through the drum and/or flange of the reel. The sleeving shall extend for at least 3 inches on either side of each point of contact with the drum or flange. end shall be coiled into a diameter of not less than 4 inches. ning end of th

13、e wire must be securely fastened to the reel flange to prevent loosening. The inside The run- 5.1.4 Unit packaging and packing. Wire reels shall be packaged to be - -P-4&24(MR), Type V, Chas 1, $mm being Me8, provide al1 other requirements of this specificat$on are adhered to. This I . .- -.,:_ i. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DL T 5307-2013 Risk assessment code for flood control on construction of hydropower and water resources project《水电水利工程施工度汛风险评估规程》.pdf DL T 5307-2013 Risk assessment code for flood control on construction of hydropower and water resources project《水电水利工程施工度汛风险评估规程》.pdf
  • DL T 5308-2013 Technical specification for construction safety monitoring of hydropower and water resources projects《水电水利工程施工安全监测技术规范》.pdf DL T 5308-2013 Technical specification for construction safety monitoring of hydropower and water resources projects《水电水利工程施工安全监测技术规范》.pdf
  • DL T 5309-2013 Specifications for underwater concrete construction of hydroelectric and hydraulic engineering《水电水利工程水下混凝土施工规范》.pdf DL T 5309-2013 Specifications for underwater concrete construction of hydroelectric and hydraulic engineering《水电水利工程水下混凝土施工规范》.pdf
  • DL T 5310-2013 Specifications for asphalt concrete face rockfill dam and reservoir basin construction《沥青混凝土面板堆石坝及库盆施工规范》.pdf DL T 5310-2013 Specifications for asphalt concrete face rockfill dam and reservoir basin construction《沥青混凝土面板堆石坝及库盆施工规范》.pdf
  • DL T 5311-2013 Specification for aggregate quarrying and processing system of the hydroelectric and water conservancy projects《水电水利工程砂石料开釆及加工系统运行规范》.pdf DL T 5311-2013 Specification for aggregate quarrying and processing system of the hydroelectric and water conservancy projects《水电水利工程砂石料开釆及加工系统运行规范》.pdf
  • DL T 5312-2013 Specification for construction quality checkout and evaluation of electric equipment installation for 1000kV substation《1000kV变电站电气装置安装工程施工质量检验及评定规程》.pdf DL T 5312-2013 Specification for construction quality checkout and evaluation of electric equipment installation for 1000kV substation《1000kV变电站电气装置安装工程施工质量检验及评定规程》.pdf
  • DL T 5313-2014 Guide for safety assessment of large dams for hydropower station in operation《水电站大坝运行安全评价导则》.pdf DL T 5313-2014 Guide for safety assessment of large dams for hydropower station in operation《水电站大坝运行安全评价导则》.pdf
  • DL T 5314-2014 Guide of emergency capability assessment for safety construction in hydropower and water resources projects《水电水利工程施工安全生产应急能力评估导则》.pdf DL T 5314-2014 Guide of emergency capability assessment for safety construction in hydropower and water resources projects《水电水利工程施工安全生产应急能力评估导则》.pdf
  • DL T 5315-2014 Technical code for repair and reinforcement of hydraulic concrete structures《水工混凝土建筑物修补加固技术规程》.pdf DL T 5315-2014 Technical code for repair and reinforcement of hydraulic concrete structures《水工混凝土建筑物修补加固技术规程》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1