NAVY UFGS-09 26 00-2011 VENEER PLASTER《饰面石膏》.pdf

上传人:bonesoil321 文档编号:984756 上传时间:2019-03-12 格式:PDF 页数:13 大小:57.59KB
下载 相关 举报
NAVY UFGS-09 26 00-2011 VENEER PLASTER《饰面石膏》.pdf_第1页
第1页 / 共13页
NAVY UFGS-09 26 00-2011 VENEER PLASTER《饰面石膏》.pdf_第2页
第2页 / 共13页
NAVY UFGS-09 26 00-2011 VENEER PLASTER《饰面石膏》.pdf_第3页
第3页 / 共13页
NAVY UFGS-09 26 00-2011 VENEER PLASTER《饰面石膏》.pdf_第4页
第4页 / 共13页
NAVY UFGS-09 26 00-2011 VENEER PLASTER《饰面石膏》.pdf_第5页
第5页 / 共13页
点击查看更多>>
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-09 26 00 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-09 26 00 (August 2010)UFGS-09 26 00 (April 2006) UFGS-09215 (September 2003)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVIS

2、ION 09 - FINISHESSECTION 09 26 00VENEER PLASTER05/11PART 1 GENERAL1.1 REFERENCES1.2 GENERAL REQUIREMENTS1.3 SUBMITTALS1.4 SUSTAINABLE DESIGN CERTIFICATION1.5 DELIVERY AND STORAGE1.6 SCHEDULING1.7 ENVIRONMENTAL REQUIREMENTS1.8 FIRE RESISTIVE CONSTRUCTIONPART 2 PRODUCTS2.1 MATERIALS2.1.1 Steel Framing

3、, Furring, and Related Items2.1.2 Vapor Retarder2.1.3 Gypsum Backing Board2.1.4 Gypsum Base2.1.5 Gypsum Veneer Plaster2.1.6 Joint Reinforcement2.1.7 Joint Compound2.1.8 Screws2.1.9 Nails2.1.10 Corner Bead, Casing Bead, and Control JointsPART 3 EXECUTION3.1 STEEL FRAMING3.1.1 Partition Framing System

4、3.1.2 Special Framing3.1.3 Shaftwall Framing System3.1.4 Ceiling Openings3.1.5 Wall Openings3.1.6 BlockingSECTION 09 26 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2 APPLICATION OF GYPSUM BASE3.2.1 Curved Surfaces3.2.2 Cavity Shaftwall

5、 System3.2.3 Control Joints3.2.4 Vapor Retarder3.3 JOINT REINFORCEMENT3.3.1 Mesh Reinforcing3.3.2 Paper Tape Reinforcing3.4 APPLICATION OF GYPSUM VENEER PLASTER3.4.1 Mixing3.4.2 Application3.4.2.1 Base Coat3.4.2.2 Finish Coat3.5 CLEANUP AND PATCHING- End of Section Table of Contents -SECTION 09 26 0

6、0 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-09 26 00 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-09 26 00 (August 2010)UFGS-09 26 00 (April 2006) UFGS-09215 (September 2003)UNIFIED FACILITIES

7、 GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 09 26 00VENEER PLASTER05/11*NOTE: This guide specification covers the requirements for veneer plaster systems.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this gu

8、ide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required

9、 in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: Veneer plaster consists of a 2 to 3 mm 1/16 to 1/8 inch thick plaster coating applied i

10、n one or more coats to a special gypsum lath base over metal or wood framing. Veneer plaster provides a hard, dense finish for areas such as corridors and conference rooms of major facilities where walls are subjected to frequent impact and where appearance is important. It should not be used in sho

11、wer rooms or excessively humid areas.*NOTE: On the drawings, indicate location and extent of each type of veneer plaster and control joints.*SECTION 09 26 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 1 GENERAL1.1 REFERENCES*NOTE: Thi

12、s paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add

13、a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification

14、 when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM C 1002 (2007) Standard Specifi

15、cation for Steel Self-Piercing Tapping Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel StudsASTM C 1047 (2010a) Standard Specification for Accessories for Gypsum Wallboard and Gypsum Veneer BaseASTM C 1396/C 1396M (2009a) Standard Specification for G

16、ypsum BoardASTM C 475/C 475M (2002; R 2007) Joint Compound and Joint Tape for Finishing Gypsum BoardASTM C 514 (2004; R 2009e1) Standard Specification for Nails for the Application of Gypsum BoardASTM C 587 (2004; R 2009) Gypsum Veneer PlasterASTM C 631 (2009) Bonding Compounds for Interior Gypsum P

17、lasteringASTM C 645 (2009a) Nonstructural Steel Framing MembersASTM C 754 (2009a) Installation of Steel Framing SECTION 09 26 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Members to Receive Screw-Attached Gypsum Panel ProductsASTM C 843 (

18、1999; R 2006) Application of Gypsum Veneer PlasterASTM C 844 (2004; R 2010) Application of Gypsum Base to Receive Gypsum Veneer PlasterASTM C 954 (2010) Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Steel Studs from 0.033 in. (0.84 mm) to 0.112 in. (2.84 m

19、m) in ThicknessASTM D 3678 (1997; R 2008e1) Standard Specification for Rigid Poly (Vinyl Chloride) (PVC) Interior-Profile ExtrusionsFM GLOBAL (FM)FM APP GUIDE (updated on-line) Approval Guide http:/ ENVIRONMENTAL INSTITUTE (GEI)GEI Greenguard Standards for Low Emitting ProductsSCIENTIFIC CERTIFICATI

20、ON SYSTEMS (SCS)SCS Scientific Certification Systems (SCS)Indoor AdvantageUNDERWRITERS LABORATORIES (UL)UL Fire Resistance (2011) Fire Resistance Directory1.2 GENERAL REQUIREMENTS*NOTE: Select either the one or two-coat system. The one-coat is slightly lower in cost, requires less installation time,

21、 and requires only one plastering material on the job. The two-coat system has greater crack resistance and is more resistant to damage. The one-coat system should be used where appearance is the sole consideration. The two-coat system should be used where physical abuse is a consideration.*Except w

22、here otherwise indicated or specified, conform to ASTM C 754, ASTM C 843, and ASTM C 844. Apply the gypsum veneer plaster as a one coat two coat system over a special gypsum base. The veneer plaster, gypsum base, and joint reinforcement shall be products of the same manufacturer. The extent and loca

23、tion of veneer plaster shall be as shown on the drawings. Metal framing is specified herein. Wood framing specified in Section 06 10 00 ROUGH CARPENTRY may be used as an option to SECTION 09 26 00 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,

24、-the steel framing.1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” fol

25、lowing a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is su

26、fficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Residen

27、t Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, a

28、nd NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.fo

29、r information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-03 Product DataGypsum baseGypsum veneer plasterDescriptive

30、data and installation instructions.Certification1.4 SUSTAINABLE DESIGN CERTIFICATIONProduct shall be third party certified by GEI Greenguard Indoor Air Quality Certified, SCS Scientific Certification Systems Indoor Advantage or equal. SECTION 09 26 00 Page 6Provided by IHSNot for ResaleNo reproducti

31、on or networking permitted without license from IHS-,-,-Certification shall be performed annually and shall be current.1.5 DELIVERY AND STORAGEDeliver and store plaster materials in the manufacturers original unopened containers. Store materials off the ground within a completely enclosed structure

32、or enclosed within a weathertight covering. Store gypsum base and gypsum backing board flat to prevent warping and protect from excessive exposure to sunlight.1.6 SCHEDULINGCommence application only after the area scheduled for veneer plaster work is completely weathertight. The heating, ventilating

33、, and air-conditioning systems should be complete and in operation prior to application of the plaster. If the mechanical system cannot be activated before veneer plastering is begun, the plastering may proceed in accordance with an approved plan to maintain the environmental conditions specified be

34、low. Apply plaster prior to the installation of finish flooring and acoustic ceiling.1.7 ENVIRONMENTAL REQUIREMENTS*NOTE: Veneer plaster is a very thin coating that will be adversely affected by extreme or non-uniform drying conditions and by rapid changes in temperature. It should not be used in sp

35、aces where adequate environmental control cannot be obtained.*Do not expose the gypsum base to excessive sunlight prior to plaster application, as bond failure of the plaster may result. Maintain a continuous uniform temperature of not less than 10 degrees C 50 degrees F and not more than 27 degrees

36、 C 80 degrees F for at least one week prior to the application of veneer plaster, while the plastering is being done, and for at least one week after the plaster is set. Shield air supply and distribution devices to prevent any uneven flow of air across the plastered surfaces. Provide ventilation to

37、 exhaust moist air to the outside during plaster application and set, and until plaster is dry. In glazed areas, keep windows open top and bottom or side to side 75 to 100 mm 3 to 4 inches. Openings can be reduced in cold weather. For enclosed areas lacking natural ventilation, provide temporary mec

38、hanical means for ventilation. In unglazed areas subjected to hot, dry winds or temperature differentials from day to night of 10 degrees C 20 degrees F or more, screen openings with cheesecloth or similar materials. Avoid rapid drying. During periods of low indoor humidity, provide minimum air circ

39、ulation following plastering and until plaster is dry.1.8 FIRE RESISTIVE CONSTRUCTION*NOTE: For fire-resistive assemblies, drawing details must follow the tested and approved designs. The addition of veneer plaster to an approved gypsum wallboard design will improve the fire-resistive properties of

40、the partitions. Tested and approved designs are published by gypsum wallboard manufacturers, Underwriters Laboratory, SECTION 09 26 00 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-and Factory Mutual, and are included in the Gypsum Associatio

41、n Fire Resistance Design Manual.*Build partitions and ceilings indicated to be of fire resistive construction in compliance with the drawings. For fire-rated assembly comply with the specifications contained in UL Fire Resistance, or FM APP GUIDEfor the Design Numbers indicated.PART 2 PRODUCTS2.1 MA

42、TERIALS*NOTE: The designer must assure that the drawings show the required thickness for gypsum base and gypsum backing board for all application.*Conform to the requirements specified below. Miscellaneous items not otherwise specified shall be as recommended by the veneer plaster system manufacture

43、r and approved prior to use. Powder driven fasteners may be used only when approved in writing.2.1.1 Steel Framing, Furring, and Related ItemsASTM C 645.2.1.2 Vapor RetarderFoil-backed gypsum base or gypsum backing board, or 4-mil polyethylene.2.1.3 Gypsum Backing BoardASTM C 1396/C 1396M, Regular Foil-backed Water-Resistant Type X. Provide boards with square edges as the first ply

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1