1、Lessons Learned Entry: 0143Lesson Info:a71 Lesson Number: 0143a71 Lesson Date: 1992-10-05a71 Submitting Organization: KSCa71 Submitted by: Lisa L. MusgraveSubject: Engine Changeout Platform (ECP) and Engine Service Platform (ESP) Hoisting Description of Driving Event: The ESP and ECP are designed to

2、 support maintenance and replacement of space shuttle main engines (SSMEs) while the orbiter is in a vertical position. Both platforms utilize the same hoisting system, located on level B of the mobile launch platform (MLP). A combination of four hoists raise and lower the platforms through the SSME

3、 exhaust hole. The platforms are secured to the MLP prior to SSME maintenance/installation. A design certification review was performed on the platforms. The review identified three non-compliances to design standards as givin by KSC-STD-Z-0002B, standard for design requirments for lifting and hoist

4、ing equipment. These are (1) no emergency stop switch, (2) no final upper limit switch, and (3) only one holding brake. However, the upper limit switch was shown to be impractical due to varying heights of the platforms, proximity of the platforms to the tail service mast, and independent operation

5、of the winches. A failure in the hoisting system during raising/lowering could cause the platform to tip, resulting in damage/loss of a SSME, ground support equipment, or MLP.Lesson(s) Learned: Failure of wire ropes, winch components, or operator error during hoist operation with ECP/ESP could resul

6、t in damage/loss of flight hardware/GSE.Recommendation(s): Install an emergency stop switch and a redundant holding brake to ECP and ESP hoisting systems to comply with lifting equipment design requirements.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS

7、Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Space Operationsa71 Exploration SystemsAdditional Key Phrase(s): a71 Facilitiesa71 Ground Operationsa71 Ground Equipmenta71 Lifting DevicesAdditional Info: Approval Info: a71 Approval Date: 1994-06-03a71 Approval Name: James G. Klinea71 Approval Organization: KSC/HEIa71 Approval Phone Number: 407-867-7614Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • JUS C H3 018-1983 Welding Determinationof difusible hydrogen in weld metal of unalioyed and low alloyed covered ele-ctrodes《焊接 非合金和低合金涂料焊条焊缝中扩散氢的测定方法》.pdf JUS C H3 018-1983 Welding Determinationof difusible hydrogen in weld metal of unalioyed and low alloyed covered ele-ctrodes《焊接 非合金和低合金涂料焊条焊缝中扩散氢的测定方法》.pdf
  • JUS C H3 019-1985 Filler meta s for vvelding Covered electrodes for manual are surfacing of steels Designation andIdentification《焊接用金属焊料 钢铁手工电弧焊用涂料焊条 命名和识别》.pdf JUS C H3 019-1985 Filler meta s for vvelding Covered electrodes for manual are surfacing of steels Designation andIdentification《焊接用金属焊料 钢铁手工电弧焊用涂料焊条 命名和识别》.pdf
  • JUS C H3 020-1982 VVelding Covered electrodes  Determination of the efficiency metal recovery and deposition coefficients《焊接 涂料焊条效率、金属回收率和熔敷系数的测定》.pdf JUS C H3 020-1982 VVelding Covered electrodes Determination of the efficiency metal recovery and deposition coefficients《焊接 涂料焊条效率、金属回收率和熔敷系数的测定》.pdf
  • JUS C H3 022-1989 Weldiog Covered electrodes for manual metal are welding Deposition of a weld metal pad for chemical analjsis《焊接 手工金属弧焊用药皮电焊条 化学分析用焊接金属垫的配置》.pdf JUS C H3 022-1989 Weldiog Covered electrodes for manual metal are welding Deposition of a weld metal pad for chemical analjsis《焊接 手工金属弧焊用药皮电焊条 化学分析用焊接金属垫的配置》.pdf
  • JUS C H3 023-1990 VVelding Determination of ferite in austenitic weld metal deposited by covered Cr-Ni steel electrodes《焊接 由铬镍钢焊条覆盖的熔敷奥氏体焊接金属的铁氧体的测定》.pdf JUS C H3 023-1990 VVelding Determination of ferite in austenitic weld metal deposited by covered Cr-Ni steel electrodes《焊接 由铬镍钢焊条覆盖的熔敷奥氏体焊接金属的铁氧体的测定》.pdf
  • JUS C H3 051-1981 Filler rods for gas welding of mild and low alloy steels《低碳和低合金钢用气焊用焊条》.pdf JUS C H3 051-1981 Filler rods for gas welding of mild and low alloy steels《低碳和低合金钢用气焊用焊条》.pdf
  • JUS C H3 051-1991 Bare solid filler rods for oxy-acetylene and tungsten inert gas arc (TIG) welding depositing and unalloyed or low alloyed steel Codification《氧乙炔气和钨极隋性气体(TIG)焊接用裸固.pdf JUS C H3 051-1991 Bare solid filler rods for oxy-acetylene and tungsten inert gas arc (TIG) welding depositing and unalloyed or low alloyed steel Codification《氧乙炔气和钨极隋性气体(TIG)焊接用裸固.pdf
  • JUS C H3 074-1982 Copper and copper alloys Electrodes for resistance welding Tech n ical requ i remen ts《铜和铜合金 电阻焊接用电焊条 技术要求》.pdf JUS C H3 074-1982 Copper and copper alloys Electrodes for resistance welding Tech n ical requ i remen ts《铜和铜合金 电阻焊接用电焊条 技术要求》.pdf
  • JUS C H3 081-1986 VVelding Shielding gasesfor vvelding Technicalreguirements《焊接 焊接用保护气体 技术要求》.pdf JUS C H3 081-1986 VVelding Shielding gasesfor vvelding Technicalreguirements《焊接 焊接用保护气体 技术要求》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1