REG NASA-LLIS-1000-1997 Lessons Learned Space Shuttle Program Orbiter Quality Assurance.pdf

上传人:fatcommittee260 文档编号:1018645 上传时间:2019-03-21 格式:PDF 页数:3 大小:14.71KB
下载 相关 举报
REG NASA-LLIS-1000-1997 Lessons Learned Space Shuttle Program Orbiter Quality Assurance.pdf_第1页
第1页 / 共3页
REG NASA-LLIS-1000-1997 Lessons Learned Space Shuttle Program Orbiter Quality Assurance.pdf_第2页
第2页 / 共3页
REG NASA-LLIS-1000-1997 Lessons Learned Space Shuttle Program Orbiter Quality Assurance.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1000Lesson Info:a71 Lesson Number: 1000a71 Lesson Date: 1997-02-01a71 Submitting Organization: HQa71 Submitted by: David M. LengyelSubject: Space Shuttle Program/Orbiter/Quality Assurance Description of Driving Event: Leaking Reaction Control System (RCS) Thruster ValvesLesson

2、s) Learned: The orbiter Reaction Control System (RCS) thruster valves continue to leak in flight. NASA has aggressively attacked this problem with some success. Procedural changes have improved thruster reliability, and the incidence of leakage has been reduced but not eliminated.Recommendation(s):

3、 Continued attention must be focused on the elimination of the root causes of RCS valve leakage/failures.Evidence of Recurrence Control Effectiveness: Several remedial actions have been and are being implemented as a result of a 1995 tiger team investigation into the causes of RCS valve leakage/fail

4、ure. This has resulted in many procedural changes and several potential hardware improvement concepts. The procedural changes are reducing the number of in-flight thruster valve failures. Many of the hardware improvements are entering a development testing phase. Examples of procedure and hardware c

5、hanges include:a71 Preventative maintenance flushing. Water flushing of the RCS pilot operated valves (POV) was developed at the White Sands Test Facility (WSTF) and has been verified to remove iron nitrate contamination from the POV.a71 Manifold thruster preventative change-outs. It is now required

6、 to change all thrusters on a Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-manifold when that manifold is drained for any reason. The removed thrusters are sent to WSTF for water flushing and then returned to spares.a71 Hard-filled manifold proces

7、sing. The POV has demonstrated substantially better sealing capability in a fully wetted, hard-filled condition. KSC procedures have been implemented that provide the ability to maintain a hard-filled manifold configuration when performing work on the RCS pods.a71 Minimization of moisture intrusion.

8、 Several additional recommendations have been implemented that specifically address minimizing moisture intrusion into the propellant system.a71 Redesigned POV (RPOV). Another result of the critical examination of the RCS POV failure history was the recommendation that the oxidizer POV be redesigned

9、 to improve the ability to withstand nitrate contamination. The resulting RPOV is proceeding through buildup and development testing. The RPOV design addresses the areas in the current valve that are known to be sensitive to nitrate contamination.a71 Minimization of oxidizer moisture and iron conten

10、t. The presence of iron and water in nitrogen tetroxide greatly increases the potential for precipitation of iron nitrate internal to the POV pilot cavity. Therefore, a molecular sieve is being designed and fabricated to reduce the levels of iron and water in nitrogen tetroxide.Documents Related to

11、Lesson: N/AMission Directorate(s): a71 Space Operationsa71 Exploration SystemsAdditional Key Phrase(s): a71 Aerospace Safety Advisory Panela71 Ground Operationsa71 Hazardous/Toxic Waste/Materialsa71 Logisticsa71 Research & Developmenta71 Safety & Mission Assurancea71 Spacecrafta71 Test & Verificatio

12、nAdditional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 2001-11-01a71 Approval Name: Bill Loewya71 Approval Organization: QSa71 Approval Phone Number: 202-358-0528Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 12066-1998 Installations and equipment for liquefied natural gas - Testing of insulating linings for liquefied natural gas impounding areas German version EN 12066 1997《液化天然.pdf DIN EN 12066-1998 Installations and equipment for liquefied natural gas - Testing of insulating linings for liquefied natural gas impounding areas German version EN 12066 1997《液化天然.pdf
  • DIN EN 12067-2-2004 Gas air ratio controls for gas burners and gas burning appliances - Part 2 Electronic types German version EN 12067-2 2004《气体燃烧器和燃气装置用燃气 空气比率控制装置 第2部分 电子型》.pdf DIN EN 12067-2-2004 Gas air ratio controls for gas burners and gas burning appliances - Part 2 Electronic types German version EN 12067-2 2004《气体燃烧器和燃气装置用燃气 空气比率控制装置 第2部分 电子型》.pdf
  • DIN EN 12068-1999 en 8492 Cathodic protection - External organic coatings for the corrosion protection of buried or immersed steel pipelines used in conjunction with cathodic prote.pdf DIN EN 12068-1999 en 8492 Cathodic protection - External organic coatings for the corrosion protection of buried or immersed steel pipelines used in conjunction with cathodic prote.pdf
  • DIN EN 1207-2005 Chemicals used for treatment of water intended for human consumption - Tetrapotassium pyrophosphate German version EN 1207 2005《人类生活用水处理用化学制品 焦磷酸四钾》.pdf DIN EN 1207-2005 Chemicals used for treatment of water intended for human consumption - Tetrapotassium pyrophosphate German version EN 1207 2005《人类生活用水处理用化学制品 焦磷酸四钾》.pdf
  • DIN EN 12074-2000 Welding consumables - Quality requirements for manufacture supply and distribution of consumables for welding and allied processes German version EN 12074 2000《焊接.pdf DIN EN 12074-2000 Welding consumables - Quality requirements for manufacture supply and distribution of consumables for welding and allied processes German version EN 12074 2000《焊接.pdf
  • DIN EN 12075-1997 Biotechnology - Large-scale process and production - Procedures for fermentation and downstream processes German version EN 12075 1997《生物技术 大规模处理和生产 发酵范及下游处理程序》.pdf DIN EN 12075-1997 Biotechnology - Large-scale process and production - Procedures for fermentation and downstream processes German version EN 12075 1997《生物技术 大规模处理和生产 发酵范及下游处理程序》.pdf
  • DIN EN 12077-2-2008 de 9299 Cranes safety - Requirements for health and safety - Part 2 Limiting and indicating devices German version EN 12077-2 1998+A1 2008《起重机安全 健康和安全要求 第2部分 限制.pdf DIN EN 12077-2-2008 de 9299 Cranes safety - Requirements for health and safety - Part 2 Limiting and indicating devices German version EN 12077-2 1998+A1 2008《起重机安全 健康和安全要求 第2部分 限制.pdf
  • DIN EN 12079-1-2006 Offshore containers and associated lifting sets - Part 1 Offshore container - Design manufacture and marking English version EN 12079-1 2006《海岸集装箱及其相关提升设备 第1部分 .pdf DIN EN 12079-1-2006 Offshore containers and associated lifting sets - Part 1 Offshore container - Design manufacture and marking English version EN 12079-1 2006《海岸集装箱及其相关提升设备 第1部分 .pdf
  • DIN EN 12079-2-2006 Offshore containers and associated lifting sets - Part 2 Lifting sets - Design manufacture and marking English version EN 12079-2 2006《海岸集装箱及其相关提升设备 第2部分 提升设备 设.pdf DIN EN 12079-2-2006 Offshore containers and associated lifting sets - Part 2 Lifting sets - Design manufacture and marking English version EN 12079-2 2006《海岸集装箱及其相关提升设备 第2部分 提升设备 设.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1