REG NASA-LLIS-1550-2005 Lessons Learned - Streamlining and Standardizing Project Planning Documents (prepared during formulation and into implementation phases).pdf

上传人:deputyduring120 文档编号:1019173 上传时间:2019-03-21 格式:PDF 页数:3 大小:14.99KB
下载 相关 举报
REG NASA-LLIS-1550-2005 Lessons Learned - Streamlining and Standardizing Project Planning Documents (prepared during formulation and into implementation phases).pdf_第1页
第1页 / 共3页
REG NASA-LLIS-1550-2005 Lessons Learned - Streamlining and Standardizing Project Planning Documents (prepared during formulation and into implementation phases).pdf_第2页
第2页 / 共3页
REG NASA-LLIS-1550-2005 Lessons Learned - Streamlining and Standardizing Project Planning Documents (prepared during formulation and into implementation phases).pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1550Lesson Info:a71 Lesson Number: 1550a71 Lesson Date: 2005-01-01a71 Submitting Organization: ARCa71 Authored by: Donald R MendozaSubject: Streamlining and Standardizing Project Planning Documents (prepared during formulation and into implementation phases) Abstract: Advanced

2、 Air Transportation Technologies (AATT) was a nine-year effort and experienced significant changes in documentation requirements from Headquarters and the lead center. This had an effect on the policies, procedures, formats, and content for project planning and formulation documents including the pr

3、ogram, project and sub-project plans (or IBPDs), along with related other agreements and supportive plans (e.g. Program Commitment Agreements, Risk Management/Mitigation Plans, Tech Transfer Plans, etc.) Examples include everything from title and formatting changes to basic content requirements incl

4、uding the program and project Work Breakdown Structure (WBS): The WBS continues to be a key tool that is recognized as being one of the most important basic “building blocks” around which a program and project(s) should be developed. Its potential for being the central “structure”, providing the bas

5、is for successful financial and Earned Value management and control, along with project metrics, technical and performance tracking, and schedule development cannot be denied. AATT experienced confusing and sometimes unclear guidance regarding the best way to develop a WBS for projects focused on co

6、ncept exploration and development and demonstration. Both NASA and private sector training provide theory and emphasize the key role and importance of a good WBS, but do not provide “hands-on” real world applications and assistance in creating a WBS for these types of projects. The various types of

7、WBS formats and approaches are offered (e.g. organizational versus product versus work, etc.), but clear guidance as to real world applications of the best approach and how to do it, within the constraints and limitations of the NASA financial management system and full cost accounting, is lacking.

8、Description of Driving Event: Continual top-level changes in management and their specific requirements (or lack thereof) for Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-program and project formulation/implementation planning documentation. Lesso

9、n(s) Learned: Much time and resources are wasted when disruptive top-level requirements are passed down without clear guidance as to what is really required that will satisfy future reviews and decision gates. When this guidance is continually changed due to changes in managers who set them, it adds

10、 to the waste of time and resources. Recommendation(s): A degree of logical and practical standardization for appropriate basic requirements and guidelines would go a long way to reduce added administrative burden and constant “re-doing”, sometimes 2-3 times in a single year. Consistent definitions,

11、 format, and content requirements should be passed down clearly with enough detail to assure understanding and compliance at the project and sub-project management levels. Whenever possible, good real world NASA applications and examples should be provided along with subject matter references and ex

12、pertise that should be made accessible and available to the implementing project management staff. These requirements should not change from year to year, but rather remain constant and uniform to the greatest extent that is practical and feasible. The resource savings in terms of freeing up both ma

13、nager and researcher time for the important things they should be focusing on would be significant. In addition, confusion and inconsistencies created between different organization and/or managements at different locations and/or levels would be reduced. Evidence of Recurrence Control Effectiveness

14、: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Aeronautics Researcha71 Space OperationsAdditional Key Phrase(s): Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Program and Project ManagementAdditional Info: Approval Info: a71 Approval Organization: ARCProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1