SANS 10120-5 HC-1988 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section HC C土.pdf

上传人:deputyduring120 文档编号:1028607 上传时间:2019-03-24 格式:PDF 页数:4 大小:175.87KB
下载 相关 举报
SANS 10120-5 HC-1988 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section HC C土.pdf_第1页
第1页 / 共4页
SANS 10120-5 HC-1988 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section HC C土.pdf_第2页
第2页 / 共4页
SANS 10120-5 HC-1988 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section HC C土.pdf_第3页
第3页 / 共4页
SANS 10120-5 HC-1988 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section HC C土.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA

2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any

3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. Clause 1. 1.1 2. 2.1 2.2 2.3 3. 3.1 3.1.1 3.1.2 3.1.3 3.2 3.2.1 3.2.2 3.2.3 4. SABS 0120 : Part 5 Section HC-1988 Corrosion protection of structural stee

4、lwork PART 5 : CONTRACT ADMl NISTRAT L0 N SECTION HC CONTENIS Page Number START OF CONSTRUCTION . l General . l IMMEDIATELY AFTER THE AUARD OF THE CONTRACT/HANDING OVER OF THE SITE 1 Samples of Blast Cleaning . 1 Samples of Cleanliness 1 Dry Film Thickness Testing . 1 DURING CONSTRUCTION . l Adminis

5、tration l Conditions on site 1 Manufacturers recommendations 1 Inspection 1 Construction methods 1 Sampling of materials . l Plant 1 Dry film thickness 1 QUALITY COWROL AM) OTHER CONSIDERATIONS 1 June 1988 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDARDS 1 SABS 0120 : Part 5 Section

6、HC-1988 Corrosion protection of structural steelwork SABS 1200 HC : CORROSION PROTECTION OF STRUCTURAL STEELWORK NITE: The clause number(s) given at the beginning or after the heading of a clause is/are, unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 HC. START OF CONST

7、RUCTION GENERAL. For the purposes of this part of the code, contract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1 of the Introduction of Part 5 of the code. IMMEDIATELY AFTER THE AWARD OF THE COWRACT/HANDING OVER OF THE SITE SAMPLES OF BLAST

8、CLEANING (Sublause 5.4.3.1). Where required by the project specification, arrange for a sample to be produced of each grade of blast cleaning required. These samples should be kept by the engineer as the standard against which subsequent work will be judged. SAMPLES OF CLEANLINESS (Subclause 5.6). O

9、wing to difficulty in making comparisons with the reference stand- ards, on-the-job tests should be carried out and reference tapes agreed to before work commences so that the tapes may be kept as a standard to be achieved for the contract. DRY FILM THICKNESS TESTING (Subclause 7.3.8). Before commen

10、cement of any corrosion protection, agree on the method of calibration of the instruments to be used for measuring DFT and the significance of the readings. WRING CONSTRUCTION ADMINISTRATION Conditions on Site (Subclauses 5.4 and 5.8). Record the weather conditions and any other conditions on site w

11、hich might affect the cleaning or coating operations during the period in which such operations take place. Manufacturers Recommendations. The manufacturers recommendation should be obtained for each type of material to be applied in the corrosion protection system specified for the contract. Inspec

12、tion. Sufficient notice should be given to the engineer Lo ensure that inspection of the steelwork can be carried out without delaying the coating applications. CONSTRUCTION METHODS Sampling of Materials (Subclause 3.2). The engineer may order sampling of corrosion proLection materials to prove the

13、condition of such materials. Plant (Clause 4). Where the plant used does not produce the specified result, consider alternative plant as may be proposed by the manufacturer of the coating that is being applied. Dry Film Thickness (Subclause 6.5). For shop coatings, DFT readings should be taken at 1

14、m intervals. Ideally, three readings should be taken at each point. For site coatings applied after erection, DFT readings should be taken at the discretion of the inspector acting in agreement with the engineer and may be dictated by accessibility. QUALITY C0NI;ROL AND OTHER CONSIDERATIOW The relevant recommendations of SABS 0157) should be applied to the corrosion protection of structural steel. 1)Quality systems. ub1 pc.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1