TIA-2001 4-E-2010 Interoperability Specification (IOS) for cdma2000 Access Network Interfaces C Part 4 (A1 A1p A2 and A5 Interfaces).pdf

上传人:孙刚 文档编号:1060279 上传时间:2019-03-31 格式:PDF 页数:528 大小:6.34MB
下载 相关 举报
TIA-2001 4-E-2010 Interoperability Specification (IOS) for cdma2000 Access Network Interfaces C Part 4 (A1 A1p A2 and A5 Interfaces).pdf_第1页
第1页 / 共528页
TIA-2001 4-E-2010 Interoperability Specification (IOS) for cdma2000 Access Network Interfaces C Part 4 (A1 A1p A2 and A5 Interfaces).pdf_第2页
第2页 / 共528页
TIA-2001 4-E-2010 Interoperability Specification (IOS) for cdma2000 Access Network Interfaces C Part 4 (A1 A1p A2 and A5 Interfaces).pdf_第3页
第3页 / 共528页
TIA-2001 4-E-2010 Interoperability Specification (IOS) for cdma2000 Access Network Interfaces C Part 4 (A1 A1p A2 and A5 Interfaces).pdf_第4页
第4页 / 共528页
TIA-2001 4-E-2010 Interoperability Specification (IOS) for cdma2000 Access Network Interfaces C Part 4 (A1 A1p A2 and A5 Interfaces).pdf_第5页
第5页 / 共528页
点击查看更多>>
资源描述

1、 TIA-2001.4-E January 2010 Interoperability Specification (IOS) forcdma2000Access Network Interfaces Part 4 (A1, A1p, A2, and A5 Interfaces) NOTICE TIA Engineering Standards and Publications are designed to serve the public interest through eliminating misunderstandings between manufacturers and pur

2、chasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for their particular need. The existence of such Standards and Publications shall not in any respect preclude any member or non-member of

3、 TIA from manufacturing or selling products not conforming to such Standards and Publications. Neither shall the existence of such Standards and Publications preclude their voluntary use by Non-TIA members, either domestically or internationally. Standards and Publications are adopted by TIA in acco

4、rdance with the American National Standards Institute (ANSI) patent policy. By such action, TIA does not assume any liability to any patent owner, nor does it assume any obligation whatever to parties adopting the Standard or Publication. This Standard does not purport to address all safety problems

5、 associated with its use or all applicable regulatory requirements. It is the responsibility of the user of this Standard to establish appropriate safety and health practices and to determine the applicability of regulatory limitations before its use. (From Project No. PN-3-4545.4-RV5, formulated un

6、der the cognizance of the TIA TR-45 Mobile (b) there is no assurance that the Document will be approved by any Committee of TIA or any other body in its present or any other form; (c) the Document may be amended, modified or changed in the standards development or any editing process. The use or pra

7、ctice of contents of this Document may involve the use of intellectual property rights (“IPR”), including pending or issued patents, or copyrights, owned by one or more parties. TIA makes no search or investigation for IPR. When IPR consisting of patents and published pending patent applications are

8、 claimed and called to TIAs attention, a statement from the holder thereof is requested, all in accordance with the Manual. TIA takes no position with reference to, and disclaims any obligation to investigate or inquire into, the scope or validity of any claims of IPR. TIA will neither be a party to

9、 discussions of any licensing terms or conditions, which are instead left to the parties involved, nor will TIA opine or judge whether proposed licensing terms or conditions are reasonable or non-discriminatory. TIA does not warrant or represent that procedures or practices suggested or provided in

10、the Manual have been complied with as respects the Document or its contents. If the Document contains one or more Normative References to a document published by another organization (“other SSO”) engaged in the formulation, development or publication of standards (whether designated as a standard,

11、specification, recommendation or otherwise), whether such reference consists of mandatory, alternate or optional elements (as defined in the TIA Engineering Manual, 4th edition) then (i) TIA disclaims any duty or obligation to search or investigate the records of any other SSO for IPR or letters of

12、assurance relating to any such Normative Reference; (ii) TIAs policy of encouragement of voluntary disclosure (see Engineering Manual Section 6.5.1) of Essential Patent(s) and published pending patent applications shall apply; and (iii) Information as to claims of IPR in the records or publications

13、of the other SSO shall not constitute identification to TIA of a claim of Essential Patent(s) or published pending patent applications. TIA does not enforce or monitor compliance with the contents of the Document. TIA does not certify, inspect, test or otherwise investigate products, designs or serv

14、ices or any claims of compliance with the contents of the Document. ALL WARRANTIES, EXPRESS OR IMPLIED, ARE DISCLAIMED, INCLUDING WITHOUT LIMITATION, ANY AND ALL WARRANTIES CONCERNING THE ACCURACY OF THE CONTENTS, ITS FITNESS OR APPROPRIATENESS FOR A PARTICULAR PURPOSE OR USE, ITS MERCHANTABILITY AN

15、D ITS NONINFRINGEMENT OF ANY THIRD PARTYS INTELLECTUAL PROPERTY RIGHTS. TIA EXPRESSLY DISCLAIMS ANY AND ALL RESPONSIBILITIES FOR THE ACCURACY OF THE CONTENTS AND MAKES NO REPRESENTATIONS OR WARRANTIES REGARDING THE CONTENTS COMPLIANCE WITH ANY APPLICABLE STATUTE, RULE OR REGULATION, OR THE SAFETY OR

16、 HEALTH EFFECTS OF THE CONTENTS OR ANY PRODUCT OR SERVICE REFERRED TO IN THE DOCUMENT OR PRODUCED OR RENDERED TO COMPLY WITH THE CONTENTS. TIA SHALL NOT BE LIABLE FOR ANY AND ALL DAMAGES, DIRECT OR INDIRECT, ARISING FROM OR RELATING TO ANY USE OF THE CONTENTS CONTAINED HEREIN, INCLUDING WITHOUT LIMI

17、TATION ANY AND ALL INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING DAMAGES FOR LOSS OF BUSINESS, LOSS OF PROFITS, LITIGATION, OR THE LIKE), WHETHER BASED UPON BREACH OF CONTRACT, BREACH OF WARRANTY, TORT (INCLUDING NEGLIGENCE), PRODUCT LIABILITY OR OTHERWISE, EVEN IF ADVISED OF THE

18、 POSSIBILITY OF SUCH DAMAGES. THE FOREGOING NEGATION OF DAMAGES IS A FUNDAMENTAL ELEMENT OF THE USE OF THE CONTENTS HEREOF, AND THESE CONTENTS WOULD NOT BE PUBLISHED BY TIA WITHOUT SUCH LIMITATIONS. TIA-2001.4-E i Table of Contents 1 2 1.0 Introduction 1 3 1.1 Overview 1 4 1.1.1 Purpose . 1 5 1.1.2

19、Scope 1 6 1.2 References 2 7 1.2.1 Normative References 2 8 1.2.2 Informative References. 3 9 1.3 Terminology . 4 10 1.3.1 Acronyms 4 11 1.3.2 Definitions 7 12 1.4 Message Body, Coding, and Ordering of Elements 8 13 1.5 Forward Compatibility Guidelines . 9 14 1.6 Message Processing Guidelines 10 15

20、1.7 Message Definition Guidelines. 11 16 1.8 Message Sending Guidelines 11 17 1.9 MSC BS Functional Partitioning. 12 18 2.0 Message Procedures . 13 19 2.1 Call Processing Message Procedures 13 20 2.1.1 Complete Layer 3 Information . 13 21 2.1.1.1 Successful Operation 13 22 2.1.1.2 Failure Operation

21、13 23 2.1.2 Connection Management (CM) Service Request 13 24 2.1.2.1 Successful Operation 13 25 2.1.2.2 Failure Operation 14 26 2.1.2.3 Abnormal Operation . 14 27 2.1.3 Connection Management (CM) Service Request Continuation 14 28 2.1.3.1 Successful Operation 14 29 2.1.3.2 Failure Operation 14 30 2.

22、1.4 Paging Request . 15 31 2.1.4.1 Successful Operation 15 32 2.1.4.2 Failure Operation 15 33 2.1.5 Paging Response. 15 34 2.1.5.1 Successful Operation 15 35 2.1.5.2 Failure Operation 16 36 2.1.5.3 Abnormal Operation . 16 37 2.1.6 Progress 16 38 2.1.6.1 Successful Operation 16 39 2.1.6.2 Failure Ope

23、ration 16 40 2.1.7 Assignment Request . 17 41 2.1.7.1 Successful Operation 17 42 2.1.7.2 Failure Operation 17 43 2.1.8 Assignment Complete. 17 44 2.1.8.1 Successful Operation 17 45 2.1.8.2 Failure Operation 18 46 2.1.9 Assignment Failure. 18 47 2.1.9.1 Successful Operation 18 48 2.1.9.2 Failure Oper

24、ation 18 49 2.1.10 Connect. 18 50 2.1.10.1 Successful Operation 18 51 2.1.10.2 Failure Operation 18 52 2.1.11 Service Release. 18 53 2.1.11.1 Base Station Initiated 18 54 2.1.11.1.1 Successful Operation . 19 55 TIA-2001.4-E ii 2.1.11.1.2 Failure Operation . 19 1 2.1.11.2 MSC Initiated . 19 2 2.1.11.

25、2.1 Successful Operation . 19 3 2.1.11.2.2 Failure Operation . 19 4 2.1.12 Service Release Complete 19 5 2.1.12.1 MSC Initiated . 19 6 2.1.12.1.1 Successful Operation . 20 7 2.1.12.1.2 Failure Operation . 20 8 2.1.12.2 BS Initiated . 20 9 2.1.12.2.1 Successful Operation . 20 10 2.1.12.2.2 Failure Op

26、eration . 20 11 2.1.13 Clear Request 20 12 2.1.13.1 Successful Operation 20 13 2.1.13.2 Failure Operation 20 14 2.1.14 Clear Command 21 15 2.1.14.1 Successful Operation 21 16 2.1.14.2 Failure Operation 21 17 2.1.15 Clear Complete . 21 18 2.1.15.1 Successful Operation 21 19 2.1.15.2 Failure Operation

27、 22 20 2.1.16 Alert With Information . 22 21 2.1.16.1 Successful Operation 22 22 2.1.16.2 Failure Operation 22 23 2.1.17 BS Service Request. 22 24 2.1.17.1 Successful Operation 22 25 2.1.17.2 Failure Operation 22 26 2.1.18 BS Service Response 22 27 2.1.18.1 Successful Operation 23 28 2.1.18.2 Failur

28、e Operation 23 29 2.1.19 Additional Service Notification 23 30 2.1.19.1 Successful Operation 23 31 2.1.19.2 Failure Operation 23 32 2.1.20 Additional Service Request 23 33 2.1.20.1 Successful Operation 23 34 2.1.20.2 Failure Operation 24 35 2.1.21 Bearer Update Request . 24 36 2.1.21.1 Successful Op

29、eration 24 37 2.1.21.2 Failure Operation 24 38 2.1.22 Bearer Update Response. 24 39 2.1.22.1 Successful Operation 24 40 2.1.22.2 Failure Operation 24 41 2.1.23 Bearer Update Required 24 42 2.1.23.1 Successful Operation 24 43 2.1.23.2 Failure Operation 25 44 2.2 Supplementary Services Message Procedu

30、res 25 45 2.2.1 Flash with Information 25 46 2.2.1.1 Successful Operation 25 47 2.2.1.2 Failure Operation 25 48 2.2.2 Flash with Information Ack 26 49 2.2.2.1 Successful Operation 26 50 2.2.2.2 Failure Operation 26 51 2.2.3 Feature Notification 26 52 2.2.3.1 Successful Operation 26 53 2.2.3.2 Failur

31、e Operation 26 54 2.2.4 Feature Notification Ack 26 55 2.2.4.1 Successful Operation 26 56 TIA-2001.4-E iii 2.2.4.2 Failure Operation 27 1 2.2.5 PACA Command 27 2 2.2.5.1 Successful Operation 27 3 2.2.5.2 Failure Operation 27 4 2.2.6 PACA Command Ack 27 5 2.2.6.1 Successful Operation 27 6 2.2.6.2 Fai

32、lure Operation 27 7 2.2.7 PACA Update . 27 8 2.2.7.1 Successful Operation 27 9 2.2.7.2 Failure Operation 28 10 2.2.8 PACA Update Ack . 28 11 2.2.8.1 Successful Operation 28 12 2.2.8.2 Failure Operation 28 13 2.2.9 Radio Measurements for Position Request . 28 14 2.2.9.1 Successful Operation 29 15 2.2

33、.9.2 Failure Operation 29 16 2.2.10 Radio Measurements for Position Response. 29 17 2.2.10.1 Successful Operation 29 18 2.2.10.2 Failure Operation 29 19 2.3 Mobility Management Message Procedures. 29 20 2.3.1 Authentication Request. 29 21 2.3.1.1 Successful Operation 30 22 2.3.1.2 Failure Operation

34、30 23 2.3.2 Authentication Response 30 24 2.3.2.1 Successful Operation 30 25 2.3.2.2 Failure Operation 30 26 2.3.3 SSD Update Request. 30 27 2.3.3.1 Successful Operation 30 28 2.3.3.2 Failure Operation 30 29 2.3.4 SSD Update Response 31 30 2.3.4.1 Successful Operation 31 31 2.3.4.2 Failure Operation

35、 31 32 2.3.5 Base Station Challenge. 31 33 2.3.5.1 Successful Operation 31 34 2.3.5.2 Failure Operation 31 35 2.3.6 Base Station Challenge Response. 31 36 2.3.6.1 Successful Operation 32 37 2.3.6.2 Failure Operation 32 38 2.3.7 Location Updating Request 32 39 2.3.7.1 Successful Operation 32 40 2.3.7

36、.2 Failure Operation 32 41 2.3.8 Location Updating Accept 32 42 2.3.8.1 Successful Operation 32 43 2.3.8.2 Failure Operation 33 44 2.3.9 Location Updating Reject . 33 45 2.3.9.1 Successful Operation 33 46 2.3.9.2 Failure Operation 33 47 2.3.10 Parameter Update Request 33 48 2.3.10.1 Successful Opera

37、tion 33 49 2.3.10.2 Failure Operation 33 50 2.3.11 Parameter Update Confirm . 33 51 2.3.11.1 Successful Operation 33 52 2.3.11.2 Failure Operation 34 53 2.3.12 Privacy Mode Command 34 54 2.3.12.1 Successful Operation 34 55 2.3.12.2 Failure Operation 34 56 TIA-2001.4-E iv 2.3.13 Privacy Mode Complete

38、 . 34 1 2.3.13.1 Successful Operation 35 2 2.3.13.2 Failure Operation 35 3 2.3.14 Status Request. 35 4 2.3.14.1 Successful Operation 35 5 2.3.14.2 Failure Operation 35 6 2.3.15 Status Response 35 7 2.3.15.1 Successful Operation 35 8 2.3.15.2 Failure Operation 35 9 2.3.16 User Zone Update Request . 3

39、5 10 2.3.16.1 Successful Operation 36 11 2.3.16.2 Failure Operation 36 12 2.3.17 User Zone Update. 36 13 2.3.17.1 Successful Operation 36 14 2.3.17.2 Failure Operation 36 15 2.3.18 User Zone Reject 36 16 2.3.18.1 Successful Operation 36 17 2.3.18.2 Failure Operation 36 18 2.3.19 Registration Request

40、. 36 19 2.3.19.1 Successful Operation 36 20 2.3.19.2 Failure Operation 37 21 2.3.20 Mobile Station Registered Notification 37 22 2.3.20.1 Successful Operation 37 23 2.3.20.2 Failure Operation 37 24 2.3.21 BS Authentication Request. 37 25 2.3.21.1 Successful Operation 37 26 2.3.21.2 Failure Operation

41、 37 27 2.3.22 BS Authentication Request Ack . 37 28 2.3.22.1 Successful Operation 37 29 2.3.22.1 Failure Operation 38 30 2.3.23 BS Security Mode Request. 38 31 2.3.23.1 Successful Operation 38 32 2.3.23.2 Failure Operation 38 33 2.3.24 Security Mode Request. 38 34 2.3.24.1 Successful Operation 38 35

42、 2.3.24.2 Failure Operation 38 36 2.3.25 Security Mode Response 38 37 2.3.25.1 Successful Operation 38 38 2.3.25.2 Failure Operation 38 39 2.3.26 Authentication Report. 39 40 2.3.26.1 Successful Operation 39 41 2.3.26.2 Failure Operation 39 42 2.3.27 Authentication Report Response. 39 43 2.3.27.1 Su

43、ccessful Operation 39 44 2.3.27.2 Failure Operation 39 45 2.3.28 Event Notification. 39 46 2.3.28.1 Successful Operation 39 47 2.3.28.2 Failure Operation 40 48 2.3.29 Event Notification Ack . 40 49 2.3.29.1 Successful Operation 40 50 2.3.29.2 Failure Operation 40 51 2.4 Handoff Message Procedures .

44、40 52 2.4.1 Handoff Required . 40 53 2.4.1.1 Successful Operation 40 54 2.4.1.2 Failure Operation 41 55 2.4.2 Handoff Request . 41 56 TIA-2001.4-E v 2.4.2.1 Successful Operation 41 1 2.4.2.2 Failure Operation 41 2 2.4.3 Handoff Request Acknowledge 42 3 2.4.3.1 Successful Operation 42 4 2.4.3.2 Failu

45、re Operation 42 5 2.4.4 Handoff Command . 42 6 2.4.4.1 Successful Operation 42 7 2.4.4.2 Failure Operation 43 8 2.4.5 Handoff Commenced 44 9 2.4.5.1 Successful Operation 44 10 2.4.5.2 Failure Operation 44 11 2.4.6 Handoff Complete 44 12 2.4.6.1 Successful Operation 44 13 2.4.6.2 Failure Operation 45

46、 14 2.4.7 Handoff Required Reject 45 15 2.4.7.1 Successful Operation 45 16 2.4.7.2 Failure Operation 45 17 2.4.8 Handoff Failure. 45 18 2.4.8.1 Successful Operation 45 19 2.4.8.2 Failure Operation 46 20 2.4.9 Handoff Performed . 46 21 2.4.9.1 Successful Operation 46 22 2.4.9.2 Failure Operation 46 2

47、3 2.5 Facility Management Message Procedures. 46 24 2.5.1 Block. 46 25 2.5.1.1 Successful Operation 46 26 2.5.1.2 Failure Operation 47 27 2.5.2 Block Acknowledge 47 28 2.5.2.1 Successful Operation 47 29 2.5.2.2 Failure Operation 47 30 2.5.3 Unblock 47 31 2.5.3.1 Successful Operation 47 32 2.5.3.2 Fa

48、ilure Operation 47 33 2.5.4 Unblock Acknowledge . 48 34 2.5.4.1 Successful Operation 48 35 2.5.4.2 Failure Operation 48 36 2.5.5 Reset Circuit . 48 37 2.5.5.1 Reset Circuit (at the BS) . 48 38 2.5.5.1.1 Successful Operation . 48 39 2.5.5.1.2 Failure Operation . 48 40 2.5.5.2 Reset Circuit (at the ci

49、rcuit-switched MSC). 49 41 2.5.5.2.1 Successful Operation . 49 42 2.5.5.2.2 Failure Operation . 49 43 2.5.6 Reset Circuit Acknowledge 49 44 2.5.6.1 Reset Circuit Acknowledge (from BS) . 49 45 2.5.6.1.1 Successful Operation . 49 46 2.5.6.1.2 Failure Operation . 49 47 2.5.6.2 Reset Circuit Acknowledge (from circuit-switched MSC). 50 48 2.5.6.2.1 Successful Operation . 50 49 2.5.6.2.2 Failure Operation . 50 50 2.5.7 Reset . 50 51 2.5.7.1 Successful Operation 50 52 2.5.7.2 Failure Operation 51 53 2.5.8 Reset Acknowledge 51 54 2.5.8.1 Successful Operation 51 55 2.5.8.2 Failure Operation 51

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1