1、 TIA-2001.4-E-3 (Addendum to TIA-2001.4-E) November 2012Interoperability Specification (IOS) for cdma2000Access Network Interfaces- Part 4 (A1, A1p, A2 and A5 Interfaces) NOTICE TIA Engineering Standards and Publications are designed to serve the public interest through eliminating misunderstandings
2、 between manufacturers and purchasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for their particular need. The existence of such Standards and Publications shall not in any respect preclu
3、de any member or non-member of TIA from manufacturing or selling products not conforming to such Standards and Publications. Neither shall the existence of such Standards and Publications preclude their voluntary use by Non-TIA members, either domestically or internationally. Standards and Publicati
4、ons are adopted by TIA in accordance with the American National Standards Institute (ANSI) patent policy. By such action, TIA does not assume any liability to any patent owner, nor does it assume any obligation whatever to parties adopting the Standard or Publication. This Standard does not purport
5、to address all safety problems associated with its use or all applicable regulatory requirements. It is the responsibility of the user of this Standard to establish appropriate safety and health practices and to determine the applicability of regulatory limitations before its use. (From Project No.
6、TIA-PN-2001.4-E-3, formulated under the cognizance of the TIA TR-45 Mobile (b) there is no assurance that the Document will be approved by any Committee of TIA or any other body in its present or any other form; (c) the Document may be amended, modified or changed in the standards development or any
7、 editing process. The use or practice of contents of this Document may involve the use of intellectual property rights (“IPR”), including pending or issued patents, or copyrights, owned by one or more parties. TIA makes no search or investigation for IPR. When IPR consisting of patents and published
8、 pending patent applications are claimed and called to TIAs attention, a statement from the holder thereof is requested, all in accordance with the Manual. TIA takes no position with reference to, and disclaims any obligation to investigate or inquire into, the scope or validity of any claims of IPR
9、. TIA will neither be a party to discussions of any licensing terms or conditions, which are instead left to the parties involved, nor will TIA opine or judge whether proposed licensing terms or conditions are reasonable or non-discriminatory. TIA does not warrant or represent that procedures or pra
10、ctices suggested or provided in the Manual have been complied with as respects the Document or its contents. If the Document contains one or more Normative References to a document published by another organization (“other SSO”) engaged in the formulation, development or publication of standards (wh
11、ether designated as a standard, specification, recommendation or otherwise), whether such reference consists of mandatory, alternate or optional elements (as defined in the TIA Engineering Manual, 4thedition) then (i) TIA disclaims any duty or obligation to search or investigate the records of any o
12、ther SSO for IPR or letters of assurance relating to any such Normative Reference; (ii) TIAs policy of encouragement of voluntary disclosure (see Engineering Manual Section 6.5.1) of Essential Patent(s) and published pending patent applications shall apply; and (iii) Information as to claims of IPR
13、in the records or publications of the other SSO shall not constitute identification to TIA of a claim of Essential Patent(s) or published pending patent applications. TIA does not enforce or monitor compliance with the contents of the Document. TIA does not certify, inspect, test or otherwise invest
14、igate products, designs or services or any claims of compliance with the contents of the Document. ALL WARRANTIES, EXPRESS OR IMPLIED, ARE DISCLAIMED, INCLUDING WITHOUT LIMITATION, ANY AND ALL WARRANTIES CONCERNING THE ACCURACY OF THE CONTENTS, ITS FITNESS OR APPROPRIATENESS FOR A PARTICULAR PURPOSE
15、 OR USE, ITS MERCHANTABILITY AND ITS NONINFRINGEMENT OF ANY THIRD PARTYS INTELLECTUAL PROPERTY RIGHTS. TIA EXPRESSLY DISCLAIMS ANY AND ALL RESPONSIBILITIES FOR THE ACCURACY OF THE CONTENTS AND MAKES NO REPRESENTATIONS OR WARRANTIES REGARDING THE CONTENTS COMPLIANCE WITH ANY APPLICABLE STATUTE, RULE
16、OR REGULATION, OR THE SAFETY OR HEALTH EFFECTS OF THE CONTENTS OR ANY PRODUCT OR SERVICE REFERRED TO IN THE DOCUMENT OR PRODUCED OR RENDERED TO COMPLY WITH THE CONTENTS. TIA SHALL NOT BE LIABLE FOR ANY AND ALL DAMAGES, DIRECT OR INDIRECT, ARISING FROM OR RELATING TO ANY USE OF THE CONTENTS CONTAINED
17、 HEREIN, INCLUDING WITHOUT LIMITATION ANY AND ALL INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING DAMAGES FOR LOSS OF BUSINESS, LOSS OF PROFITS, LITIGATION, OR THE LIKE), WHETHER BASED UPON BREACH OF CONTRACT, BREACH OF WARRANTY, TORT (INCLUDING NEGLIGENCE), PRODUCT LIABILITY OR OT
18、HERWISE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. THE FOREGOING NEGATION OF DAMAGES IS A FUNDAMENTAL ELEMENT OF THE USE OF THE CONTENTS HEREOF, AND THESE CONTENTS WOULD NOT BE PUBLISHED BY TIA WITHOUT SUCH LIMITATIONS. TIA-2001.4-E-3 Revision History Date Publication Description June 2007
19、 A.S0014-D v1.0 For features supported, refer to the Overview 11, section 1.1. August 2009 A.S0014-D v2.0 Updates to support 1x air interface enhancements, EVRC-W B on A2p, EVRC-NW on A2 and A2p and bug fixes. May 2011 A.S0014-D v3.0 Support for callback of an emergency call origination, EVRC-NW cap
20、acity operating point 0, and bug fixes. August 2012 A.S0014-D v4.0 Support for EVRC-B, EVRC-W B, EVRC-NW, EVRC-NW2K, USSD, MSC-BS indication of Device Type and bug fix. TIA-2001.4-E-3 (This page intentionally left blank.) TIA-2001.4-E-3 i Table of Contents 1 2 Foreword . xv 3 1.0 Introduction. 1 4 1
21、.1 Overview . 1 5 1.1.1 Purpose 1 6 1.1.2 Scope . 1 7 1.2 References . 2 8 1.2.1 Normative References 2 9 1.2.2 Informative References 4 10 1.3 Terminology 4 11 1.3.1 Acronyms . 4 12 1.3.2 Definitions 8 13 1.4 Message Body, Coding, and Ordering of Elements . 8 14 1.5 Forward Compatibility Guidelines
22、 10 15 1.6 Message Processing Guidelines. 10 16 1.7 Message Definition Guidelines 11 17 1.8 Message Sending Guidelines . 12 18 1.9 MSC BS Functional Partitioning . 12 19 1.10 Documentation Conventions 13 20 2.0 Message Procedures 15 21 2.1 Call Processing Message Procedures 15 22 2.1.1 Complete Laye
23、r 3 Information 15 23 2.1.1.1 Successful Operation 15 24 2.1.1.2 Failure Operation 15 25 2.1.2 Connection Management (CM) Service Request 15 26 2.1.2.1 Successful Operation 15 27 2.1.2.2 Failure Operation 16 28 2.1.2.3 Abnormal Operation . 16 29 2.1.3 Connection Management (CM) Service Request Conti
24、nuation 16 30 2.1.3.1 Successful Operation 16 31 2.1.3.2 Failure Operation 16 32 2.1.4 Paging Request 17 33 2.1.4.1 Successful Operation 17 34 2.1.4.2 Failure Operation 17 35 2.1.5 Paging Response . 17 36 2.1.5.1 Successful Operation 17 37 2.1.5.2 Failure Operation 18 38 2.1.5.3 Abnormal Operation .
25、 18 39 2.1.6 Progress. 18 40 2.1.6.1 Successful Operation 18 41 2.1.6.2 Failure Operation 18 42 2.1.7 Assignment Request . 18 43 2.1.7.1 Successful Operation 19 44 2.1.7.2 Failure Operation 19 45 2.1.8 Assignment Complete 19 46 2.1.8.1 Successful Operation 19 47 2.1.8.2 Failure Operation 19 48 2.1.9
26、 Assignment Failure . 20 49 2.1.9.1 Successful Operation 20 50 2.1.9.2 Failure Operation 20 51 2.1.10 Connect . 20 52 2.1.10.1 Successful Operation 20 53 2.1.10.2 Failure Operation 20 54 2.1.11 Service Release 20 55 TIA-2001.4-E-3 ii 2.1.11.1 Base Station Initiated . 20 1 2.1.11.1.1 Successful Opera
27、tion 20 2 2.1.11.1.2 Failure Operation. 21 3 2.1.11.2 MSC Initiated 21 4 2.1.11.2.1 Successful Operation 21 5 2.1.11.2.2 Failure Operation. 21 6 2.1.12 Service Release Complete . 21 7 2.1.12.1 MSC Initiated 21 8 2.1.12.1.1 Successful Operation 21 9 2.1.12.1.2 Failure Operation. 22 10 2.1.12.2 BS Ini
28、tiated 22 11 2.1.12.2.1 Successful Operation 22 12 2.1.12.2.2 Failure Operation. 22 13 2.1.13 Clear Request . 22 14 2.1.13.1 Successful Operation 22 15 2.1.13.2 Failure Operation 22 16 2.1.14 Clear Command . 22 17 2.1.14.1 Successful Operation 23 18 2.1.14.2 Failure Operation 23 19 2.1.15 Clear Comp
29、lete 23 20 2.1.15.1 Successful Operation 23 21 2.1.15.2 Failure Operation 23 22 2.1.16 Alert With Information. 24 23 2.1.16.1 Successful Operation 24 24 2.1.16.2 Failure Operation 24 25 2.1.17 BS Service Request. 24 26 2.1.17.1 Successful Operation 24 27 2.1.17.2 Failure Operation 24 28 2.1.18 BS Se
30、rvice Response 24 29 2.1.18.1 Successful Operation 25 30 2.1.18.2 Failure Operation 25 31 2.1.19 Additional Service Notification 25 32 2.1.19.1 Successful Operation 25 33 2.1.19.2 Failure Operation 25 34 2.1.20 Additional Service Request . 25 35 2.1.20.1 Successful Operation 25 36 2.1.20.2 Failure O
31、peration 26 37 2.1.21 Bearer Update Request. 26 38 2.1.21.1 Successful Operation 26 39 2.1.21.2 Failure Operation 26 40 2.1.22 Bearer Update Response 26 41 2.1.22.1 Successful Operation 26 42 2.1.22.2 Failure Operation 26 43 2.1.23 Bearer Update Required . 26 44 2.1.23.1 Successful Operation 26 45 2
32、.1.23.2 Failure Operation 27 46 2.2 Supplementary Services Message Procedures 27 47 2.2.1 Flash with Information . 27 48 2.2.1.1 Successful Operation 27 49 2.2.1.2 Failure Operation 27 50 2.2.2 Flash with Information Ack 28 51 2.2.2.1 Successful Operation 28 52 2.2.2.2 Failure Operation 28 53 2.2.3
33、Feature Notification 28 54 2.2.3.1 Successful Operation 28 55 2.2.3.2 Failure Operation 28 56 TIA-2001.4-E-3 iii 2.2.4 Feature Notification Ack 28 1 2.2.4.1 Successful Operation 28 2 2.2.4.2 Failure Operation 29 3 2.2.5 PACA Command. 29 4 2.2.5.1 Successful Operation 29 5 2.2.5.2 Failure Operation 2
34、9 6 2.2.6 PACA Command Ack 29 7 2.2.6.1 Successful Operation 29 8 2.2.6.2 Failure Operation 29 9 2.2.7 PACA Update 29 10 2.2.7.1 Successful Operation 29 11 2.2.7.2 Failure Operation 30 12 2.2.8 PACA Update Ack 30 13 2.2.8.1 Successful Operation 30 14 2.2.8.2 Failure Operation 30 15 2.2.9 Radio Measu
35、rements for Position Request . 30 16 2.2.9.1 Successful Operation 31 17 2.2.9.2 Failure Operation 31 18 2.2.10 Radio Measurements for Position Response 31 19 2.2.10.1 Successful Operation 31 20 2.2.10.2 Failure Operation 31 21 2.3 Mobility Management Message Procedures 31 22 2.3.1 Authentication Req
36、uest 31 23 2.3.1.1 Successful Operation 32 24 2.3.1.2 Failure Operation 32 25 2.3.2 Authentication Response . 32 26 2.3.2.1 Successful Operation 32 27 2.3.2.2 Failure Operation 32 28 2.3.3 SSD Update Request 32 29 2.3.3.1 Successful Operation 32 30 2.3.3.2 Failure Operation 33 31 2.3.4 SSD Update Re
37、sponse 33 32 2.3.4.1 Successful Operation 33 33 2.3.4.2 Failure Operation 33 34 2.3.5 Base Station Challenge. 33 35 2.3.5.1 Successful Operation 33 36 2.3.5.2 Failure Operation 34 37 2.3.6 Base Station Challenge Response 34 38 2.3.6.1 Successful Operation 34 39 2.3.6.2 Failure Operation 34 40 2.3.7
38、Location Updating Request . 34 41 2.3.7.1 Successful Operation 34 42 2.3.7.2 Failure Operation 34 43 2.3.8 Location Updating Accept. 35 44 2.3.8.1 Successful Operation 35 45 2.3.8.2 Failure Operation 35 46 2.3.9 Location Updating Reject 35 47 2.3.9.1 Successful Operation 35 48 2.3.9.2 Failure Operat
39、ion 35 49 2.3.10 Parameter Update Request. 35 50 2.3.10.1 Successful Operation 35 51 2.3.10.2 Failure Operation 35 52 2.3.11 Parameter Update Confirm 36 53 2.3.11.1 Successful Operation 36 54 2.3.11.2 Failure Operation 36 55 2.3.12 Privacy Mode Command . 36 56 TIA-2001.4-E-3 iv 2.3.12.1 Successful O
40、peration 36 1 2.3.12.2 Failure Operation 36 2 2.3.13 Privacy Mode Complete. 37 3 2.3.13.1 Successful Operation 37 4 2.3.13.2 Failure Operation 37 5 2.3.14 Status Request 37 6 2.3.14.1 Successful Operation 37 7 2.3.14.2 Failure Operation 37 8 2.3.15 Status Response . 37 9 2.3.15.1 Successful Operatio
41、n 38 10 2.3.15.2 Failure Operation 38 11 2.3.16 User Zone Update Request 38 12 2.3.16.1 Successful Operation 38 13 2.3.16.2 Failure Operation 38 14 2.3.17 User Zone Update . 38 15 2.3.17.1 Successful Operation 38 16 2.3.17.2 Failure Operation 38 17 2.3.18 User Zone Reject . 38 18 2.3.18.1 Successful
42、 Operation 38 19 2.3.18.2 Failure Operation 39 20 2.3.19 Registration Request. 39 21 2.3.19.1 Successful Operation 39 22 2.3.19.2 Failure Operation 39 23 2.3.20 Mobile Station Registered Notification. 39 24 2.3.20.1 Successful Operation 39 25 2.3.20.2 Failure Operation 39 26 2.3.21 BS Authentication
43、 Request 39 27 2.3.21.1 Successful Operation 39 28 2.3.21.2 Failure Operation 39 29 2.3.22 BS Authentication Request Ack . 40 30 2.3.22.1 Successful Operation 40 31 2.3.22.1 Failure Operation 40 32 2.3.23 BS Security Mode Request 40 33 2.3.23.1 Successful Operation 40 34 2.3.23.2 Failure Operation 4
44、0 35 2.3.24 Security Mode Request 40 36 2.3.24.1 Successful Operation 40 37 2.3.24.2 Failure Operation 41 38 2.3.25 Security Mode Response 41 39 2.3.25.1 Successful Operation 41 40 2.3.25.2 Failure Operation 41 41 2.3.26 Authentication Report 41 42 2.3.26.1 Successful Operation 41 43 2.3.26.2 Failur
45、e Operation 41 44 2.3.27 Authentication Report Response 41 45 2.3.27.1 Successful Operation 42 46 2.3.27.2 Failure Operation 42 47 2.3.28 Event Notification . 42 48 2.3.28.1 Successful Operation 42 49 2.3.28.2 Failure Operation 42 50 2.3.29 Event Notification Ack. 42 51 2.3.29.1 Successful Operation
46、 42 52 2.3.29.2 Failure Operation 42 53 2.4 Handoff Message Procedures. 43 54 2.4.1 Handoff Required 43 55 2.4.1.1 Successful Operation 43 56 TIA-2001.4-E-3 v 2.4.1.2 Failure Operation 43 1 2.4.2 Handoff Request 43 2 2.4.2.1 Successful Operation 43 3 2.4.2.2 Failure Operation 44 4 2.4.3 Handoff Requ
47、est Acknowledge 44 5 2.4.3.1 Successful Operation 44 6 2.4.3.2 Failure Operation 45 7 2.4.4 Handoff Command 45 8 2.4.4.1 Successful Operation 45 9 2.4.4.2 Failure Operation 45 10 2.4.5 Handoff Commenced 46 11 2.4.5.1 Successful Operation 46 12 2.4.5.2 Failure Operation 46 13 2.4.6 Handoff Complete.
48、47 14 2.4.6.1 Successful Operation 47 15 2.4.6.2 Failure Operation 47 16 2.4.7 Handoff Required Reject . 47 17 2.4.7.1 Successful Operation 47 18 2.4.7.2 Failure Operation 47 19 2.4.8 Handoff Failure . 48 20 2.4.8.1 Successful Operation 48 21 2.4.8.2 Failure Operation 48 22 2.4.9 Handoff Performed .
49、 48 23 2.4.9.1 Successful Operation 48 24 2.4.9.2 Failure Operation 48 25 2.5 Facility Management Message Procedures 49 26 2.5.1 Block . 49 27 2.5.1.1 Successful Operation 49 28 2.5.1.2 Failure Operation 49 29 2.5.2 Block Acknowledge 49 30 2.5.2.1 Successful Operation 49 31 2.5.2.2 Failure Operation 50 32 2.5.3 Unblock. 50 33 2.5.3.1 Successful Operation 50 34 2.5.3.2 Failure Operation 50 35 2.5.4 Unblock Acknowledge . 50 36 2.5.4.1 Successful Operation 50 37 2.5.4.2 Failure Operation 50 38 2.5.5 Reset Circuit. 51 39 2.5.5.1 Reset Circuit (at the BS) 51 40 2.5.5.1.1 Successful Op