GA 221-2000 Repair of Gypsum Board Joint Ridging《石膏板联合起垄的修复》.pdf

上传人:ideacase155 文档编号:1228952 上传时间:2019-08-11 格式:PDF 页数:2 大小:217.55KB
下载 相关 举报
GA 221-2000 Repair of Gypsum Board Joint Ridging《石膏板联合起垄的修复》.pdf_第1页
第1页 / 共2页
GA 221-2000 Repair of Gypsum Board Joint Ridging《石膏板联合起垄的修复》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Printed in U.S.A. Copyright Gypsum Association 2000. All rights reserved.GYPSUM ASSOCIATION810 FIRST STREET NE, #510 WASHINGTON, DC 20002REPAIR OF GYPSUM BOARDJOINT RIDGING(GA-221-2000)Joint ridging, also called beading, is auniform, fine line deformation occurring atgypsum board joints. It is usual

2、ly caused bycompression of the edges or ends of the finishedand decorated gypsum board resulting from theedges or ends being forced together fromexposure to alternating periods of high and lowtemperature and humidity extremes due tothermal or hygrometric expansion.In order to permit the gypsum board

3、 systemto stabilize, it is recommended that repairs notbegin until the affected building has gonethrough at least one complete heating/coolingcycle. Repairs should only be undertaken in awarm, dry environment.Lightly sand the ridge down taking care notto damage the embedded joint reinforcing tape.Ty

4、pical Joint Before RidgingTypical Joint After RidgingTypical Ridging at Taper-to-Butt JointFill the surface over the joint with topping orall purpose compound, feathering as wide asnecessary to create an essentially flat surface.Allow compound to dry for at least 24 hoursbefore proceeding. After the

5、 compound is dry, itmay be lightly sanded to feather the edges andremove any remaining trowel marks. Examinethe sanded joint to determine whether or not theridge has been eliminated. If the examinationindicates that the ridge has not been adequatelyconcealed, additional feathering coats of jointcomp

6、ound may be required. Allow each coat ofjoint compound to dry at least 24 hours beforesanding.The repaired joint should be painted with acoat of drywall primer and allowed to drythoroughly prior to the application of finaldecoration.Typical Ridge From Misaligned FramingMEMBER COMPANY LIST2001AMERICA

7、N GYPSUMBPB AMERICA, INCCONTINENTAL GYPSUM COMPANYG-P GYPSUM CORPORATIONJAMES HARDIE GYPSUMLAFARGE GYPSUMNATIONAL GYPSUM COMPANYPABCO GYPSUMA Division of Pacific Coast Building Products, Inc.TEMPLE-INLAND FOREST PRODUCTS CORPORATIONUNITED STATES GYPSUM COMPANYWESTROC INC.GYPSUM ASSOCIATION810 First Street NE, #510Washington, DC 20002202-289-5440Fax: 202-289-3707www.gypsum.org

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 行业标准 > GA公共安全

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1