IEC TS 62257-4-2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 4 System selection and design《农村电气化用可再生能源和混合系统的建议.第4部分 系统选择和设计》.pdf

上传人:lawfemale396 文档编号:1238259 上传时间:2019-08-24 格式:PDF 页数:76 大小:2MB
下载 相关 举报
IEC TS 62257-4-2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 4 System selection and design《农村电气化用可再生能源和混合系统的建议.第4部分 系统选择和设计》.pdf_第1页
第1页 / 共76页
IEC TS 62257-4-2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 4 System selection and design《农村电气化用可再生能源和混合系统的建议.第4部分 系统选择和设计》.pdf_第2页
第2页 / 共76页
IEC TS 62257-4-2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 4 System selection and design《农村电气化用可再生能源和混合系统的建议.第4部分 系统选择和设计》.pdf_第3页
第3页 / 共76页
IEC TS 62257-4-2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 4 System selection and design《农村电气化用可再生能源和混合系统的建议.第4部分 系统选择和设计》.pdf_第4页
第4页 / 共76页
IEC TS 62257-4-2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 4 System selection and design《农村电气化用可再生能源和混合系统的建议.第4部分 系统选择和设计》.pdf_第5页
第5页 / 共76页
点击查看更多>>
资源描述

1、 IEC TS 62257-4 Edition 2.0 2015-12 TECHNICAL SPECIFICATION Recommendations for renewable energy and hybrid systems for rural electrification Part 4: System selection and design IEC TS 62257-4:2015-12(en) THIS PUBLICATION IS COPYRIGHT PROTECTED Copyright 2015 IEC, Geneva, Switzerland All rights rese

2、rved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from either IEC or IECs member National Committee in the country of the requester. If

3、 you have any questions about IEC copyright or have an enquiry about obtaining additional rights to this publication, please contact the address below or your local IEC member National Committee for further information. IEC Central Office Tel.: +41 22 919 02 11 3, rue de Varemb Fax: +41 22 919 03 00

4、 CH-1211 Geneva 20 infoiec.ch Switzerland www.iec.ch About the IEC The International Electrotechnical Commission (IEC) is the leading global organization that prepares and publishes International Standards for all electrical, electronic and related technologies. About IEC publications The technical

5、content of IEC publications is kept under constant review by the IEC. Please make sure that you have the latest edition, a corrigenda or an amendment might have been published. IEC Catalogue - webstore.iec.ch/catalogue The stand-alone application for consulting the entire bibliographical information

6、 on IEC International Standards, Technical Specifications, Technical Reports and other documents. Available for PC, Mac OS, Android Tablets and iPad. IEC publications search - www.iec.ch/searchpub The advanced search enables to find IEC publications by a variety of criteria (reference number, text,

7、technical committee,). It also gives information on projects, replaced and withdrawn publications. IEC Just Published - webstore.iec.ch/justpublished Stay up to date on all new IEC publications. Just Published details all new publications released. Available online and also once a month by email. El

8、ectropedia - www.electropedia.org The worlds leading online dictionary of electronic and electrical terms containing more than 30 000 terms and definitions in English and French, with equivalent terms in 15 additional languages. Also known as the International Electrotechnical Vocabulary (IEV) onlin

9、e. IEC Glossary - std.iec.ch/glossary More than 60 000 electrotechnical terminology entries in English and French extracted from the Terms and Definitions clause of IEC publications issued since 2002. Some entries have been collected from earlier publications of IEC TC 37, 77, 86 and CISPR. IEC Cust

10、omer Service Centre - webstore.iec.ch/csc If you wish to give us your feedback on this publication or need further assistance, please contact the Customer Service Centre: csciec.ch. IEC TS 62257-4 Edition 2.0 2015-12 TECHNICAL SPECIFICATION Recommendations for renewable energy and hybrid systems for

11、 rural electrification Part 4: System selection and design INTERNATIONAL ELECTROTECHNICAL COMMISSION ICS 27.160 ISBN 978-2-8322-3071-8 Registered trademark of the International Electrotechnical Commission Warning! Make sure that you obtained this publication from an authorized distributor. 2 IEC TS

12、62257-4:2015 IEC 2015 CONTENTS FOREWORD . 6 INTRODUCTION . 8 1 Scope 9 2 Normative references 9 3 Terms and definitions 9 4 Functional requirements of production and distribution subsystems . 10 4.1 General . 10 4.2 Overall needs to be satisfied . 11 4.2.1 Main factors to be considered 11 4.2.2 Need

13、s and characteristics to be considered . 11 4.3 Introduction to subsystems . 14 4.4 Functional description of a production subsystem . 15 4.4.1 General . 15 4.4.2 Detailed functions to be achieved by a production subsystem 15 4.4.3 Detailed performances criteria to be achieved by a production subsys

14、tem . 16 4.5 Functional description of a distribution subsystem 16 4.5.1 Detailed functions to be achieved by a distribution subsystem (or rural micro-grid) . 16 4.5.2 Detailed performances criteria to be achieved by a distribution subsystem . 17 4.6 Functional description of a demand subsystem . 18

15、 4.7 Constraints to be complied with by production distribution and demand subsystems . 18 5 Energy management rules . 19 5.1 General . 19 5.2 Functional description for an energy management of an isolated system 20 5.3 Demand side management 21 6 Expected results from the sizing process . 21 6.1 Ov

16、erview. 21 6.2 Participants in the sizing process 21 6.3 Elements for comparing various design proposals . 21 6.4 Frameworks for proposal. 22 6.4.1 General . 22 6.4.2 General commitments to supply . 22 6.4.3 Assumptions and classification of input 24 6.4.4 Technical characteristics for the main equi

17、pment proposed . 28 6.4.5 Characteristics for a photovoltaic array 29 6.4.6 Characteristics for wind turbines 30 6.4.7 Characteristics for the generator set 31 6.4.8 Characteristics for micro hydro turbines . 32 6.4.9 Characteristics for biomass generators 33 6.4.10 Characteristics for power convert

18、ers 33 6.4.11 Characteristics for the load manager/meter 35 6.4.12 Characteristics for system controllers 35 6.4.13 Characteristics for batteries . 36 IEC TS 62257-4:2015 IEC 2015 3 6.4.14 Characteristics for links and wiring 37 6.4.15 Energy outputs 37 6.4.16 Presentation of the costs . 38 6.4.17 D

19、esign warranty . 38 6.4.18 Steps to reduce the impact of climatic hazards on system performance . 39 6.4.19 Presentation of the environmental and social impact 39 6.4.20 Presentation of the socio- economic impact assessment 39 6.5 Proposal for a sizing process 39 6.6 Impact of design assumptions on

20、system sizing and cost 39 6.7 Guarantee of results . 41 7 Data acquisition rules for system management 41 7.1 Overview. 41 7.2 General . 41 7.3 Levels of data acquisition and data necessity 42 7.3.1 General . 42 7.3.2 Information to provide to the energy manager and relevant data to be collected 42

21、7.3.3 Information to provide to the operator and relevant data to be collected 44 7.3.4 Information to provide to the user and relevant data to be collected . 45 7.3.5 Summary of the information required . 46 7.3.6 Scientific data collection 46 7.4 Data to be collected 46 7.5 Operating conditions, e

22、lectrical and engineering requirements for data acquisition 48 Annex A (informative) Example for detailed performance criteria and levels for a production subsystem . 49 Annex B (informative) Example for detailed performance criteria and levels for a distribution subsystem 50 Annex C (informative) E

23、xample framework for proposal specification . 51 C.1 Knowledge of site . 51 C.2 Knowledge of consumption data 51 C.3 Knowledge of resources 52 C.4 Technical characteristics for the main equipment proposed . 53 C.4.1 Photovoltaic modules . 53 C.4.2 Modules supporting structure . 53 C.5 Characteristic

24、s for wind turbines . 53 C.5.1 Wind turbine 53 C.5.2 Structure support . 54 C.6 Characteristics for the generator set . 54 C.7 Characteristics for micro hydro turbine 55 C.8 Characteristics for biomass generators . 55 C.9 Characteristics for power converters . 55 C.10 Characteristics for load manage

25、r/meter . 56 C.11 Characteristics for system controllers . 57 C.12 Characteristics for battery . 57 C.13 Energy outputs 58 C.13.1 From renewable energies 58 C.13.2 From fossil energies 58 Annex D (informative) Formula for costs calculations . 59 4 IEC TS 62257-4:2015 IEC 2015 D.1 Yearly cash flow 59

26、 D.2 Calculation of total life cycle cost 59 D.3 Calculation of the levelized cost of energy 60 D.4 Annualized maintenance, operating, and replacement expense. 60 D.5 Further economic calculations applicable to energy businesses 61 Annex E (informative) Proposal for a sizing process 63 E.1 General .

27、 63 E.2 Comments on the proposed sizing process . 64 E.2.1 General . 64 E.2.2 Step 01: Definition of power requirements to be fulfilled 65 E.2.3 Step 02: Conversion of available weather data into relevant data 66 E.2.4 Step 03: Statement of economic data to be accounted for 67 E.2.5 Step 04: Invento

28、ry of the constraints to account for . 67 E.2.6 Step 05: Management assumptions . 68 E.2.7 Step 06: Technical choices 69 E.2.8 Step 07: Calculations . 70 E.2.9 Step 08: Analysis of the results 70 E.2.10 Step 09: Examination of the opportunity of other choices . 71 E.2.11 Step 10: Change in technical

29、 choices 71 E.2.12 Step 11: Definition of desired equipment characteristics 71 E.2.13 Step 12: Identification of existing/available equipment complying with the characteristics . 71 E.2.14 Step 13: New calculations 71 E.2.15 Step 14: Analysis of the results 71 E.2.16 Step 15: Examining the opportuni

30、ty of other choices 71 E.2.17 Step 16: New choices of equipment . 71 E.2.18 Step 17: Technical characteristics for the finally chosen equipment . 72 E.2.19 Step 18: Forwarding the results to the project implementer 72 E.2.20 Step 19: Modification of the input data . 72 Figure 1 Factors involved in t

31、he design of a system . 11 Figure 2 Functional diagram of a radial structure for rural micro-grid 18 Figure 3 Functional impact of energy management and safety . 19 Figure E.1 Sizing process flow chart 64 Table 1 Technical factors needs or characteristics to be considered . 12 Table 2 Economic facto

32、rs needs and characteristics to be considered 12 Table 3 Site characteristics 13 Table 4 Regulations and requirements to be considered 14 Table 5 Participants in the sizing process 21 Table 6 Perspectives to be considered . 23 Table 7 Commitments indicators 24 Table 8 Knowledge of site 25 Table 9 Kn

33、owledge of consumption data 26 Table 10 Knowledge of resources: data accuracy levels 26 Table 11 Knowledge of resources: data retained for considered site 28 Table 12 Knowledge of resources: range of data history 28 IEC TS 62257-4:2015 IEC 2015 5 Table 13 Characteristics for photovoltaic modules . 2

34、9 Table 14 Characteristics for modules supporting structure . 29 Table 15 Characteristics for the wind turbine . 30 Table 16 Characteristics for wind turbine structure . 30 Table 17 Characteristics for the generator set 31 Table 18 Characteristics for micro hydro turbines 32 Table 19 Characteristics

35、 for biomass generators 33 Table 20 Characteristics for power converters . 34 Table 21 Characteristics for load manager/meter . 35 Table 22 Characteristics for system controllers 36 Table 23 Characteristics for batteries . 36 Table 24 Characteristics for links and wiring 37 Table 25 Energy output fr

36、om renewable energies. 37 Table 26 Energy output from fossil energies 37 Table 27 Energy output from storage . 38 Table 28 Incidence of energy management assumptions on system sizing . 40 Table 29 Incidence of cost management assumptions on system dimensions 41 Table 30 Information required by the e

37、nergy manager and data to collect 43 Table 31 Information required by the operator and data to collect 45 Table 32 Information required by the user and data to collect 45 Table 33 Summary of the needed information 46 Table 34 Minimum set of data to be collected 47 Table 35 Relationship between requi

38、red information and system architecture 48 Table A.1 Detailed performance criteria and levels for a production subsystem 49 Table A.2 Typical example of Table A.1 . 49 Table B.1 Detailed performance criteria and levels for a distribution subsystem . 50 Table B.2 Typical example of Table B.2 . 50 Tab

39、le E.1 Description of utilities to be power supplied . 65 Table E.2 Consumption characteristics 66 Table E.3 Meteorological data used for sizing 66 Table E.4 Proposals for types of cost to be accounted for 67 Table E.5 Site constraints inventory . 67 Table E.6 Impact of energy management assumptions

40、 on plant sizing . 68 Table E.7 Impact of cost management assumptions on plant sizing . 69 6 IEC TS 62257-4:2015 IEC 2015 INTERNATIONAL ELECTROTECHNICAL COMMISSION _ RECOMMENDATIONS FOR RENEWABLE ENERGY AND HYBRID SYSTEMS FOR RURAL ELECTRIFICATION Part 4: System selection and design FOREWORD 1) The

41、International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international co-operation on all questions concerning standardization in the electrical and

42、electronic fields. To this end and in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publication(s)”). Their preparation is entrusted to technical comm

43、ittees; any IEC National Committee interested in the subject dealt with may participate in this preparatory work. International, governmental and non- governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely with the International Organization f

44、or Standardization (ISO) in accordance with conditions determined by agreement between the two organizations. 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international consensus of opinion on the relevant subjects since each technical committe

45、e has representation from all interested IEC National Committees. 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC Publications is ac

46、curate, IEC cannot be held responsible for the way in which they are used or for any misinterpretation by any end user. 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications transparently to the maximum extent possible in their national and regi

47、onal publications. Any divergence between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter. 5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity assessment services and, in

48、 some areas, access to IEC marks of conformity. IEC is not responsible for any services carried out by independent certification bodies. 6) All users should ensure that they have the latest edition of this publication. 7) No liability shall attach to IEC or its directors, employees, servants or agen

49、ts including individual experts and members of its technical committees and IEC National Committees for any personal injury, property damage or other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC Publications. 8) Attention is drawn to the Normative references cited in this p

展开阅读全文
相关资源
  • IEC TS 62492-1-2008 Industrial process control devices - Radiation thermometers - Part 1 Technical data for radiation thermometers《工业过程控制装置 辐射温度计 第1部分 辐射温度计的技术数.pdfIEC TS 62492-1-2008 Industrial process control devices - Radiation thermometers - Part 1 Technical data for radiation thermometers《工业过程控制装置 辐射温度计 第1部分 辐射温度计的技术数.pdf
  • IEC TR2 61464-1998 Insulated bushings - Guide for the interpretation of dissolved gas analysis (DGA) in bushings where oil is the impregnating medium of the mai.pdfIEC TR2 61464-1998 Insulated bushings - Guide for the interpretation of dissolved gas analysis (DGA) in bushings where oil is the impregnating medium of the mai.pdf
  • IEC TR 61241-2-2-1993 Electrical apparatus for use in the presence of combustible dust part 2 test methods section 2 method for determining the electrical resis.pdfIEC TR 61241-2-2-1993 Electrical apparatus for use in the presence of combustible dust part 2 test methods section 2 method for determining the electrical resis.pdf
  • IEC TR 60972-1989 Classification and interpretation of new lighting products《新型照明产品的分类和说明》.pdfIEC TR 60972-1989 Classification and interpretation of new lighting products《新型照明产品的分类和说明》.pdf
  • IEC TR 60943 Edition 21-2009 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals《特殊终端中电气设备部件用关于允许.pdfIEC TR 60943 Edition 21-2009 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals《特殊终端中电气设备部件用关于允许.pdf
  • IEC TR 60943 AMD 1-2008 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals Amendment 1《电气设备部件(特别.pdfIEC TR 60943 AMD 1-2008 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals Amendment 1《电气设备部件(特别.pdf
  • IEC TR 60919-2-2008 Performance of high-voltage direct current (HVDC) systems with line-communicated converters - Part 2 Faults and switching《带线性通信转换器的高压直流(HVDC.pdfIEC TR 60919-2-2008 Performance of high-voltage direct current (HVDC) systems with line-communicated converters - Part 2 Faults and switching《带线性通信转换器的高压直流(HVDC.pdf
  • IEC TR 60870-6-505 Edition 11-2006 Telecontrol equipment and systems - Part.6-505 Telecontrol protocols compatible with ISO standards and ITU-T recommendations .pdfIEC TR 60870-6-505 Edition 11-2006 Telecontrol equipment and systems - Part.6-505 Telecontrol protocols compatible with ISO standards and ITU-T recommendations .pdf
  • IEC TR 60344 CORR1-2012 Calculation of d c resistance of plain and coated copper conductors of low-frequency cables and wires - Application guide Corrigendum 1《.pdfIEC TR 60344 CORR1-2012 Calculation of d c resistance of plain and coated copper conductors of low-frequency cables and wires - Application guide Corrigendum 1《.pdf
  • IEC 62560 CORR1-2012 Self-ballasted LED-lamps for general lighting services by voltage 50 V - Safety specifications Corrigendum 1《普通照明用50 V以上自镇流LED灯 安全要求 勘误表1》.pdfIEC 62560 CORR1-2012 Self-ballasted LED-lamps for general lighting services by voltage 50 V - Safety specifications Corrigendum 1《普通照明用50 V以上自镇流LED灯 安全要求 勘误表1》.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > IEC

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1