1、Process management for avionics Management plan Part 2: Preparation and maintenance of an electronic COTS assembly management plan PD IEC/TS 62239-2:2017 BSI Standards Publication WB11885_BSI_StandardCovs_2013_AW.indd 1 15/05/2013 15:06National foreword This Published Document is the UK implementati
2、on of IEC/TS 62239-2:2017. The UK participation in its preparation was entrusted to Technical Committee GEL/107, Process management for avionics. A list of organizations represented on this committee can be obtained on request to its secretary. This publication does not purport to include all the ne
3、cessary provisions of a contract. Users are responsible for its correct application. The British Standards Institution 2017. Published by BSI Standards Limited 2017 ISBN 978 0 580 95202 9 ICS 03.100.50; 31.020; 49.060 Compliance with a British Standard cannot confer immunity from legal obligations.
4、This Published Document was published under the authority of the Standards Policy and Strategy Committee on 31 March 2017. Amendments/corrigenda issued since publication Date Text affected PUBLISHED DOCUMENT PD IEC/TS 62239-2:2017 IEC TS 62239-2 Edition 1.0 2017-02 TECHNICAL SPECIFICATION Process ma
5、nagement for avionics Management plan Part 2: Preparation and maintenance of an electronic COTS assembly management plan INTERNATIONAL ELECTROTECHNICAL COMMISSION ICS 03.100.50; 31.020; 49.060 ISBN 978-2-8322-3905-6 Registered trademark of the International Electrotechnical Commission Warning! Make
6、sure that you obtained this publication from an authorized distributor. PD IEC/TS 62239-2:2017 2 IEC TS 62239-2:2017 IEC 2017 CONTENTS FOREWORD . 4 INTRODUCTION . 6 1 Scope 7 2 Normative references 7 3 Terms, definitions and abbreviated terms 7 3.1 Terms and definitions 8 3.2 Abbreviated terms . 14
7、4 Technical requirements . 15 4.1 General . 15 4.2 COTS assembly selection . 16 4.2.1 General . 16 4.2.2 Design assurance 16 4.3 COTS assembly application 16 4.3.1 General . 16 4.3.2 Functionality 17 4.3.3 COTS assembly compatibility 17 4.3.4 Assembly materials 17 4.3.5 Heat dissipation and cooling
8、17 4.3.6 Integrity analysis . 17 4.3.7 Reliability analysis . 18 4.3.8 Useful life 19 4.3.9 Storage life 19 4.3.10 Failure modes and effects analysis 19 4.3.11 Maintainability and testability . 19 4.3.12 Markings 20 4.3.13 Safety 20 4.3.14 Acceptance by the plan owner . 20 4.4 Electronic COTS assemb
9、ly manufacturer selection . 20 4.4.1 General . 20 4.4.2 Electronic COTS assembly manufacturer quality system 22 4.4.3 Franchised distributor quality system . 22 4.4.4 Electronic COTS assembly derating and stress analysis 22 4.4.5 Electronic COTS assembly qualification/characterization . 22 4.4.6 Ele
10、ctronic components used in electronic COTS assembly: Selection/qualification and acceptance 23 4.4.7 Electronic COTS assembly manufacturing and handling 23 4.4.8 Electronic COTS assembly qualification approval 23 4.4.9 Electronic COTS assembly final acceptance 23 4.4.10 Configuration management and
11、documentation . 23 4.4.11 Plan owner documentation . 24 4.4.12 Electronic COTS assembly manufacturer documentation . 25 4.4.13 Life cycle management 25 4.4.14 COTS assembly availability risk management 25 4.4.15 Equipment/system corrective action and product (electronic COTS assembly) change notices
12、 . 26 4.4.16 Electronic COTS assembly substitution or alternative source . 26 5 Plan administration 26 PD IEC/TS 62239-2:2017IEC TS 62239-2:2017 IEC 2017 3 5.1 Plan content and organization . 26 5.2 Plan terms, definitions and abbreviated terms . 27 5.3 Plan focal point . 27 5.4 Plan references 27 5
13、.5 Plan applicability . 27 5.6 Plan implementation . 27 5.7 Plan acceptance . 27 Annex A (informative) Template for tailoring the requirements of IEC TS 62239-2 28 Annex B (informative) Cross-reference between IEC TS 62239-2 and SAE EIA-933B 29 Annex C (informative) Electronic COTS assembly design g
14、uidelines and COTS assembly manufacturers risk assessment 31 C.1 COTS assembly design guidelines 31 C.1.1 Open system architecture 31 C.1.2 Risk assessment and performance 31 C.1.3 Assembly criticality 31 C.2 COTS assembly manufacturers risk assessment 31 Annex D (informative) Typical electronic COT
15、S assembly mitigation methods and techniques 46 Annex E (informative) Requirements matrix for IEC TS 62239-2 . 54 Bibliography 61 Table 1 Electronic COTS assembly manufacturer selection recommendations . 21 Table A.1 Template for tailoring requirements of IEC TS 62239-2 28 Table B.1 Cross-reference
16、between IEC TS 62239-2 and SAE EIA-933B requirements . 29 Table C.1 Template for electronic COTS assembly manufacturers risk assessment 33 Table C.2 Template for the plan owners mitigation and risk assessment of the electronic COTS assembly manufacturer analysed in Table C.1 39 Table D.1 Typical ele
17、ctronics COTS assembly mitigation methods and techniques 46 Table E.1 Requirements matrix for IEC TS 62239-2 . 54 PD IEC/TS 62239-2:2017 4 IEC TS 62239-2:2017 IEC 2017 INTERNATIONAL ELECTROTECHNICAL COMMISSION _ PROCESS MANAGEMENT FOR AVIONICS MANAGEMENT PLAN Part 2: Preparation and maintenance of a
18、n electronic COTS assembly management plan FOREWORD 1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international co-operation on all
19、questions concerning standardization in the electrical and electronic fields. To this end and in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publica
20、tion(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with may participate in this preparatory work. International, governmental and non- governmental organizations liaising with the IEC also participate in this preparation. IEC
21、 collaborates closely with the International Organization for Standardization (ISO) in accordance with conditions determined by agreement between the two organizations. 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international consensus of opi
22、nion on the relevant subjects since each technical committee has representation from all interested IEC National Committees. 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National Committees in that sense. While all reasonable efforts are made to
23、ensure that the technical content of IEC Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any misinterpretation by any end user. 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications transparentl
24、y to the maximum extent possible in their national and regional publications. Any divergence between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter. 5) IEC itself does not provide any attestation of conformity. Independent certific
25、ation bodies provide conformity assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any services carried out by independent certification bodies. 6) All users should ensure that they have the latest edition of this publication. 7) No liability shall
26、attach to IEC or its directors, employees, servants or agents including individual experts and members of its technical committees and IEC National Committees for any personal injury, property damage or other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal
27、fees) and expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC Publications. 8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is indispensable for the correct application of this public
28、ation. 9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of patent rights. IEC shall not be held responsible for identifying any or all such patent rights. The main task of IEC technical committees is to prepare International Standards. In
29、exceptional circumstances, a technical committee may propose the publication of a technical specification when the required support cannot be obtained for the publication of an International Standard, despite repeated efforts, or the subject is still under technical development or where, for any oth
30、er reason, there is the future but no immediate possibility of an agreement on an International Standard. Technical specifications are subject to review within three years of publication to decide whether they can be transformed into International Standards. IEC TS 62239-2, which is a technical spec
31、ification, has been prepared by IEC Technical Committee 107: Process management for avionics. PD IEC/TS 62239-2:2017IEC TS 62239-2:2017 IEC 2017 5 The text of this technical specification is based on the following documents: Enquiry draft Report on voting 107/288/DTS 107/293/RVDTS Full information o
32、n the voting for the approval of this technical specification can be found in the report on voting indicated in the above table. This document has been drafted in accordance with the ISO/IEC Directives, Part 2. A list of all parts in the IEC 62239 series, published under the general title Process ma
33、nagement for avionics Management plan, can be found on the IEC website. The committee has decided that the contents of this document will remain unchanged until the stability date indicated on the IEC website under “http:/webstore.iec.ch“ in the data related to the specific document. At this date, t
34、he document will be reconfirmed, withdrawn, replaced by a revised edition, or amended. A bilingual version of this publication may be issued at a later date. PD IEC/TS 62239-2:2017 6 IEC TS 62239-2:2017 IEC 2017 INTRODUCTION The purpose of this document is to define the requirements for developing a
35、n electronic commercial off the shelf (COTS) assembly management plan (CAMP), hereinafter also called the plan, to assure customers that all of the electronic COTS assemblies in the equipment of the plan owner are selected and applied in controlled processes, and that the technical requirements deta
36、iled in this document are accomplished. In general the owners of an electronic COTS assembly management plan are original (electronic) equipment manufacturers (OEMs) and system integrators for the aerospace, defence and high performance (ADHP) electronics industry. The objective is to define and doc
37、ument, as necessary, processes to assure the adequacy of electronic COTS assemblies selected for use in electronic systems. This document states objectives to be accomplished; it does not specify how tasks are performed, specific data collected or reports issued. Those who prepare plans in complianc
38、e with this document are encouraged to document processes that are the most effective and efficient for them in accomplishing the objectives of this document. In order to allow flexibility in implementing and updating the documented processes, plan authors are encouraged to refer to their own intern
39、al process documents instead of including detailed process documentation within their plans. Organizations that prepare such plans are called the plan owners and may prepare a single plan, and use it for all relevant products supplied by the organization, or may prepare a separate plan for each rele
40、vant product or customer. PD IEC/TS 62239-2:2017IEC TS 62239-2:2017 IEC 2017 7 PROCESS MANAGEMENT FOR AVIONICS MANAGEMENT PLAN Part 2: Preparation and maintenance of an electronic COTS assembly management plan 1 Scope This part of IEC 62239, which is a technical specification, applies to the develop
41、ment of COTS assembly management plans (CAMPs) for the integration and management of electronic COTS assemblies (see 3.1.13 and 3.1.20) in electronic systems used in the ADHP markets where reliability is generally critical. NOTE 1 Best practices for managing the electronic components within the elec
42、tronic assemblies are described in IEC TS 62239-1 and SAE EIA-STD-4899 which describe the electronic component management program (ECMP). In cases where the electronic components can be identified and managed at the component level, ECMP can be considered as an option to manage the components. NOTE
43、2 The distinction between an electronic component and an electronic assembly is provided by the definitions in Clause 3. This distinction between an electronic component and an electronic assembly is not always recognized by industry: for example, filters, contactors, power supply modules, relays, m
44、agnetic assemblies, etc., can be considered as either components or assemblies. In each application it is considered a best practice for the user of this document to clarify this distinction. Depending on program or product line requirements and/or the technical characteristics of the electronic COT
45、S assemblies and in agreement with the customer, the electronic COTS assembly management plans (CAMPs) could consider tailoring the requirements of this document. See Annex A. Although developed for the avionics industry, this document can be applied by other high performance and high reliability in
46、dustries at their discretion. 2 Normative references The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the
47、referenced document (including any amendments) applies. There are no normative references in this document. 3 Terms, definitions and abbreviated terms For the purposes of this document, the following terms, definitions and abbreviated terms apply. ISO and IEC maintain terminological databases for us
48、e in standardization at the following addresses: IEC Electropedia: available at http:/www.electropedia.org/ ISO Online browsing platform: available at http:/www.iso.org/obp PD IEC/TS 62239-2:2017 8 IEC TS 62239-2:2017 IEC 2017 3.1 Terms and definitions 3.1.1 analysis utilization of data, reference m
49、aterials, actions, or test results previously obtained that can be utilized for comparison to verify that a requirement, a characteristic, a parameter or a criteria has been met Note 1 to entry: Test results and associated data can be part of the analysis. 3.1.2 assembly characterization process of testing and/or analysis of assembly capability when configuration control of the assemblys internal details is inadequate to support traditional qualification Note 1 to entry MIL-STD