API SPEC 6D-2014 Specification for Pipeline and Piping Valves (TWENTY-FOURTH EDITION ERTA 1 October 2014 ERTA 2 December 2014 ERTA 3 February 2015 ERTA 4 June 2015 ERTA 5 July 2015.pdf

上传人:appealoxygen216 文档编号:400194 上传时间:2018-10-24 格式:PDF 页数:126 大小:1.54MB
下载 相关 举报
API SPEC 6D-2014 Specification for Pipeline and Piping Valves (TWENTY-FOURTH EDITION ERTA 1 October 2014 ERTA 2 December 2014 ERTA 3 February 2015 ERTA 4 June 2015 ERTA 5 July 2015.pdf_第1页
第1页 / 共126页
API SPEC 6D-2014 Specification for Pipeline and Piping Valves (TWENTY-FOURTH EDITION ERTA 1 October 2014 ERTA 2 December 2014 ERTA 3 February 2015 ERTA 4 June 2015 ERTA 5 July 2015.pdf_第2页
第2页 / 共126页
API SPEC 6D-2014 Specification for Pipeline and Piping Valves (TWENTY-FOURTH EDITION ERTA 1 October 2014 ERTA 2 December 2014 ERTA 3 February 2015 ERTA 4 June 2015 ERTA 5 July 2015.pdf_第3页
第3页 / 共126页
API SPEC 6D-2014 Specification for Pipeline and Piping Valves (TWENTY-FOURTH EDITION ERTA 1 October 2014 ERTA 2 December 2014 ERTA 3 February 2015 ERTA 4 June 2015 ERTA 5 July 2015.pdf_第4页
第4页 / 共126页
API SPEC 6D-2014 Specification for Pipeline and Piping Valves (TWENTY-FOURTH EDITION ERTA 1 October 2014 ERTA 2 December 2014 ERTA 3 February 2015 ERTA 4 June 2015 ERTA 5 July 2015.pdf_第5页
第5页 / 共126页
亲,该文档总共126页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Date of Issue: June 2016 Affected Publication: API Specification 6D, Specification for Pipeline and Piping Valves, Twenty-fourth Edition, August 2014 ERRATA 7 (includes Errata 1, October 2014; Errata 2, December 2014; Errata 3, February 2015; Errata 4, June 2015; Errata 5, July 2015; Errata 6, Septe

2、mber 2015 ) Page 2, Section 2, replace: ASME B31.4, Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids, 2013 with ASME B31.4, Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids, 2012 Page 4, Section 2, insert the following normative reference: SAE AMS 27

3、50, Pyrometry Page 18, Section 5.13, 4thparagraph, revise the 1stsentence to read: Handwheel diameter(s) shall not exceed the 40 in. (1016 mm). Page 24, Section 6.10, insert the following sentence at the end of the section: Records of furnace calibration and surveys shall be maintained for a period

4、not less than five years. Page 30, Section 9.2, revise the 4thparagraph to read: Any visually detectable leakage during the test duration at test pressure on any external surface of the shell is cause for rejection. Page 33, Section 10, revise the 4thparagraph to read: See Annex L for details on whe

5、re coatings/paintings are not allowed. Page 34, Table 7, revise lines 5 and 6 to read: 5a Body/closure/end connection material designation a c: material grade On both body/closure/end connection and nameplate; 5b Body/closure/end connection melt identification (e.g. cast or heat number) On both body

6、/closure/end connection only 6a Bonnet/cover material designation c: material grade On bonnet/cover 6b Bonnet/cover melt identification (e.g. heat number) On bonnet/cover Page 51, Figure B.8, in the Key, revise 6) and 7) as follows: 6) clapper disc 7) seat ring Page 57, Figure B.14, replace part B o

7、f the figure as follows: Page 64, Table C.2, header row replace: Class 350 with Class 300 Page 81, Figure F.2, replace the labels on the figures to read: a) Side view b) Top view Page 82, Section F.3.4, revise the paragraph to read: Furnaces used for continuous heat treatment shall be calibrated in

8、accordance with procedures specified in SAE AMS-2750. Page 83, Section G.6, revise the acceptance criteria to read: Acceptance shall be in accordance with ASME BPVC, Section VIII, Division 1, Appendix 6. Page 100, Figure K.6, replace the figure as follows: Page 104, Section M.2, revise the last row

9、to read: (Item 15: serial number) Page 110, delete the following bibliographical reference (moved to Section 2): 16 SAE AMS 2750, Pyrometry Specification for Pipelineand Piping ValvesAPI SPECIFICATION 6DTWENTY-FOURTH EDITION, AUGUST 2014API MONOGRAM PROGRAM EFFECTIVE DATE: AUGUST 1, 2015ERRATA 1, OC

10、TOBER 2014ERRATA 2, DECEMBER 2014ERRATA 3, FEBRUARY 2015ERRATA 4, JUNE 2015ERRATA 5, JULY 2015ERRATA 6, SEPTEMBER 2015ERRATA 7, JUNE 2016ADDENDUM 1, MARCH 2015ADDENDUM 2, JUNE 2016Special NotesAPI publications necessarily address problems of a general nature. With respect to particular circumstances

11、, local,state, and federal laws and regulations should be reviewed.Neither API nor any of APIs employees, subcontractors, consultants, committees, or other assignees make anywarranty or representation, either express or implied, with respect to the accuracy, completeness, or usefulness of theinforma

12、tion contained herein, or assume any liability or responsibility for any use, or the results of such use, of anyinformation or process disclosed in this publication. Neither API nor any of APIs employees, subcontractors,consultants, or other assignees represent that use of this publication would not

13、 infringe upon privately owned rights.API publications may be used by anyone desiring to do so. Every effort has been made by the Institute to assure theaccuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, orguarantee in connection with th

14、is publication and hereby expressly disclaims any liability or responsibility for loss ordamage resulting from its use or for the violation of any authorities having jurisdiction with which this publication mayconflict.API publications are published to facilitate the broad availability of proven, so

15、und engineering and operatingpractices. These publications are not intended to obviate the need for applying sound engineering judgmentregarding when and where these publications should be utilized. The formulation and publication of API publicationsis not intended in any way to inhibit anyone from

16、using any other practices.Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standardis solely responsible for complying with all the applicable requirements of that standard. API does not represent,warrant, or guarantee that such products do in fa

17、ct conform to the applicable API standard.Users of this Specification should not rely exclusively on the information contained in this document. Sound business,scientific, engineering, and safety judgment should be used in employing the information contained herein. All rights reserved. No part of t

18、his work may be reproduced, translated, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the Publisher, API Publishing Services, 1220 L Street, NW, Washington, DC 200

19、05.Copyright 2014 American Petroleum InstituteForewordNothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for themanufacture, sale, or use of any method, apparatus, or product covered by letters patent. Neither should anythingcontained in t

20、he publication be construed as insuring anyone against liability for infringement of letters patent.Shall: As used in a standard, “shall” denotes a minimum requirement in order to conform to the specification.Should: As used in a standard, “should” denotes a recommendation or that which is advised b

21、ut not required in orderto conform to the specification. This document was produced under API standardization procedures that ensure appropriate notification andparticipation in the developmental process and is designated as an API standard. Questions concerning theinterpretation of the content of t

22、his publication or comments and questions concerning the procedures under whichthis publication was developed should be directed in writing to the Director of Standards, American PetroleumInstitute, 1220 L Street, NW, Washington, DC 20005. Requests for permission to reproduce or translate all or any

23、 partof the material published herein should also be addressed to the director.Generally, API standards are reviewed and revised, reaffirmed, or withdrawn at least every five years. A one-timeextension of up to two years may be added to this review cycle. Status of the publication can be ascertained

24、 from theAPI Standards Department, telephone (202) 682-8000. A catalog of API publications and materials is publishedannually by API, 1220 L Street, NW, Washington, DC 20005.Suggested revisions are invited and should be submitted to the Standards Department, API, 1220 L Street, NW,Washington, DC 200

25、05, standardsapi.org.iiiContentsPage1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

26、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.2 Conformance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.3 Conformance with Specification . . . . . .

27、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.4 Processes Requiring Validation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Normative References . . . . . .

28、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Terms, Definitions, Acronyms, Abbreviations, Symbols, and Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43.1 Terms and Definitions. . . . . . . . . . .

29、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43.2 Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93.3 Symbols and Units . .

30、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94 Valve Types and Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.1 Valv

31、e Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.2 Valve Configurations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

32、. . . . . . . . . . . . 105 Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125.1 Design Standards and Calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

33、. . . . . . . . . . . . . . . . . . . . . . . . 125.2 Pressure and Temperature Rating. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 135.3 Sizes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

34、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 135.4 Face-to-face and End-to-end Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145.5 Valve Operation . . . . . . . . . . . . . . . . . . . . . . . . . . .

35、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145.6 Pigging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145.7 Valve Ends . . . . . . . . .

36、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 155.8 Valve Cavity Pressure Relief . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165.

37、9 Drains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165.10 Injection Points . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

38、 . . . . . . . . . . . . . . . . . . . . 175.11 Drain, Vent, and Sealant Lines. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 175.12 Drain, Vent, and Sealant Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

39、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 185.13 Handwheels and WrenchesLevers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 185.14 Locking Provision . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

40、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 185.15 Position of the Obturator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 185.16 Position Indicators . . . . . . . . . . . . . . . . . . .

41、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 195.17 Travel Stops . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 195.18 Actuator, Operator

42、s, and Stem Extensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 195.19 Lifting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

43、195.20 Drive Trains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 205.21 Stem Retention . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

44、. . . . . . . . . . . . . . . . . . . . 205.22 Fire Type-testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 205.23 Antistatic Device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

45、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 206 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 216.1 Material Specification . . . . . . . . . . .

46、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 216.2 Tensile Test Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 216.3 Service Compatibili

47、ty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 226.4 Forged Parts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

48、 . . . . 226.5 Composition Limits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 226.6 Toughness Test Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

49、 . . . . . . . . . . . . . 226.7 Bolting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 236.8 Sour Service. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23vContentsPage6.9 Drain Connections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 236.10 Heat-treating Equipment Qualificat

展开阅读全文
相关资源
  • API SALES OF NGL & LRG-2018 2016 Sales of Natural Gas Liquids and Liquefied Refinery Gas.pdfAPI SALES OF NGL & LRG-2018 2016 Sales of Natural Gas Liquids and Liquefied Refinery Gas.pdf
  • API MPMS 9 4-2018 Manual of Petroleum Measurement Standards Chapter 9 4-Continuous Density Measurement Under Dynamic (Flowing) Conditions (FIRST EDITION).pdfAPI MPMS 9 4-2018 Manual of Petroleum Measurement Standards Chapter 9 4-Continuous Density Measurement Under Dynamic (Flowing) Conditions (FIRST EDITION).pdf
  • API MPMS 9 3-2012 Manual of Petroleum Measurement Standards Chapter 9 3 Standard Test Method for Density Relative Density and API Gravity of Crude Petroleum and.pdfAPI MPMS 9 3-2012 Manual of Petroleum Measurement Standards Chapter 9 3 Standard Test Method for Density Relative Density and API Gravity of Crude Petroleum and.pdf
  • API MPMS 9 2-2012 Manual of Petroleum Measurement Standards Chapter 9 2 Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure H.pdfAPI MPMS 9 2-2012 Manual of Petroleum Measurement Standards Chapter 9 2 Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure H.pdf
  • API MPMS 9 1-2012 Manual of Petroleum Measurement Standards Chapter 9 1 Standard Test Method for Density Relative Density or API Gravity of Crude Petroleum and .pdfAPI MPMS 9 1-2012 Manual of Petroleum Measurement Standards Chapter 9 1 Standard Test Method for Density Relative Density or API Gravity of Crude Petroleum and .pdf
  • API MPMS 8 5-2015 Manual of Petroleum Measurement Standards Chapter 8 5 Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils Condensate.pdfAPI MPMS 8 5-2015 Manual of Petroleum Measurement Standards Chapter 8 5 Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils Condensate.pdf
  • API MPMS 8 5 SPANISH-2015 Manual of Petroleum Measurement Standards Chapter 8 5 - Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils .pdfAPI MPMS 8 5 SPANISH-2015 Manual of Petroleum Measurement Standards Chapter 8 5 - Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils .pdf
  • API MPMS 8 4-2017 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (FOURTH .pdfAPI MPMS 8 4-2017 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (FOURTH .pdf
  • API MPMS 8 4-2014 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (THIRD E.pdfAPI MPMS 8 4-2014 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (THIRD E.pdf
  • API MPMS 8 3-1995 Manual of Petroleum Measurement Standards Chapter 8 - Sampling Section 3 - Standard Practice for Mixing and Handling of Liquid Samples of Petr.pdfAPI MPMS 8 3-1995 Manual of Petroleum Measurement Standards Chapter 8 - Sampling Section 3 - Standard Practice for Mixing and Handling of Liquid Samples of Petr.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > API

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1