1、 Part 3: Hull Construction and Equipment RULES FOR BUILDING AND CLASSING STEEL VESSELS 2017 PART 3 HULL CONSTRUCTION AND EQUIPMENT American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2016 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 North
2、chase Drive Houston, TX 77060 USA Rule Change Notice (201 7 ) Rule Change Notice (2017) The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each Part. Unless a particular date and month are shown, the years i
3、n parentheses refer to the following effective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 Listing by Effective Dates of Changes from the 2016 Rules No
4、tice No. 1 (effective on 1 July 2016) to the 2016 Rules, which is incorporated in the 2017 Rules, is summarized below. EFFECTIVE DATE 1 July 2016 shown as (1 July 2016) (based on the contract date for new construction between builder and Owner) Part/Para. No. Title/Subject Status/Remarks 3-2-13/5.5
5、(New) Rudder Horn Plating To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-13/5.7 (New) Welding and Connection to Hull Structure To align the requirements with
6、the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-13/Figure 4 (New) Connection of Rudder Horn to Aft Ship Structure To align the requirements with the updated IACS UR S10, which includes the i
7、mprovements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/1.1 Application To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporat
8、es Notice No. 1) 3-2-14/Table 1B Coefficient kc for High-Lift/ Performance Rudders To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/7.5 Rudder Trunk and Rudd
9、er Stock Sealing To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/Figure 2 (New) Fillet Shoulder Radius To align the requirements with the updated IACS UR S1
10、0, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/9.3.3 (New) Joint between Rudder Stock and Coupling Flange To align the requirements with the updated IACS UR S10, which includes the improvements introduced by
11、IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/Figure 3 (New) Welded Joint Between Rudder Stock and Coupling Flange To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for
12、 Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/9.5.1 Coupling Bolts To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/9.5.3 (New) Joint between Rudder Sto
13、ck and Coupling Flange To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) ii ABSRULES FOR BUILDING AND CLASSING STEEL VESSELS .2017 Part/Para. No. Title/Subject Statu
14、s/Remarks 3-2-14/11.1 Coupling Taper To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/11.3 Keyed Fitting To align the requirements with the updated IACS UR S
15、10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/11.5 Keyless Fitting To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules f
16、or Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/13 Pintles To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/15.1.5 (New) Liners and Bushes To align the
17、requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/15.3 Rudder Carrier To align the requirements with the updated IACS UR S10, which includes the improvements introduced by
18、 IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/Table 6 Allowable Bearing Surface Pressure To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorpor
19、ates Notice No. 1) 3-2-14/17.3 Side, Top and Bottom Plating To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/17.5 Diaphragm Plates To align the requirements
20、with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/17.7 (New) Connections of Rudder Blade Structure with Solid Parts To align the requirements with the updated IACS UR S10, which includ
21、es the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/Figure 6 (New) Cross-section of the Connection Between Rudder Blade Structure and Rudder Stock Housing To align the requirements with the updated IACS UR S10, which includes th
22、e improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/Table 7 (New) Thickness of Side Plating and Vertical Diaphragm Plates To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in t
23、he Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-14/17.9 (New) Welding and Design Details To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No.
24、 1) 3-2-14/17.11 Watertightness To align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-A5/9 (New) Rudders Supported by a Horn Arranged with Two Pintles (Supports) To
25、align the requirements with the updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-A5/Figure 4 (New) Rudder Supported by a Horn Arranged with Two Pintles (Supports) To align the requirements with t
26、he updated IACS UR S10, which includes the improvements introduced by IACS in the Common Structural Rules for Bulk Carriers. (Incorporates Notice No. 1) 3-2-15/Figure 1 Positions 1 and 2 To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of contai
27、ners on hatches. (Incorporates Notice No. 1) ABSRULES FOR BUILDING AND CLASSING STEEL VESSELS .2017 iii Part/Para. No. Title/Subject Status/Remarks 3-2-15/Figure 2 Positions 1 and 2 for an Increased Freeboard To align the requirements with the updated IACS UR S21A, which includes changes for the par
28、tial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/3.5 Horizontal Weather Design Pressures To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/9.1.1 Stresses To ali
29、gn the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/9.1.3 Material To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatch
30、es. (Incorporates Notice No. 1) 3-2-15/9.3 Local Net Plate Thickness To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/9.3.2 Lower Plating of Double Skin Hatch Covers and Box Girders To
31、 align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/9.5 Net Scantlings of Secondary Stiffeners To align the requirements with the updated IACS UR S21A, which includes changes for the partia
32、l loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/9.9 Cargo Loads To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/9.11 Container Loads To align the requirements w
33、ith the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/Figure 5 Partial Loading of a Container Hatch Cover To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of con
34、tainers on hatches. (Incorporates Notice No. 1) 3-2-15/9.15 Strength Calculations To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/9.17.3(a) Longitudinal and Transverse Secondary Stiff
35、eners To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/9.21.2 Net Scantlings of Secondary Stiffeners of Coamings To align the requirements with the updated IACS UR S21A, which includes
36、 changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/9.21.3 Coaming Stays To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/Figure 10 (New) Exam
37、ples for Typical Coaming Stay Configurations To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/9.21.4(d) Extend of Coaming Plates To align the requirements with the updated IACS UR S21A
38、, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/Figure 11 Example for Arrangement of Coaming Plates To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorpo
39、rates Notice No. 1) 3-2-15/9.23.1(e) Anti Lifting Devices To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) iv ABSRULES FOR BUILDING AND CLASSING STEEL VESSELS .2017 Part/Para. No. Title/Subje
40、ct Status/Remarks 3-2-15/9.23.2(a) Horizontal Mass Forces To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/9.23.2(b) Hatch Cover Supports To align the requirements with the updated IAC
41、S UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) 3-2-15/9.25.2 Steel Renewal To align the requirements with the updated IACS UR S21A, which includes changes for the partial loading of containers on hatches. (Incorporates Notice No. 1) EF
42、FECTIVE DATE 1 January 2017 shown as (2017) (based on the contract date for new construction between builder and Owner) Part/Para. No. Title/Subject Status/Remarks 3-1-2/Table 1 Material Grades To clarify that even if A36 is used it should be produced by a steel mill approved by ABS. 3-1-2/Table 2 M
43、aterial Class or Grade of Structural Members To clarify that even if A36 is used it should be produced by a steel mill approved by ABS. To permit the application of non-Class grades without necessarily being from an ABS steel mill, in locations that are not part of the hull structural envelope. 3-1-
44、2/3.5 Structures Exposed to Low Air Temperatures To clarify material class requirements for plating attached to hull envelope plating exposed to low air temperature and to address the relationship between the design temperatures, in line with IACS UR S6. 3-1-2/Table 3 Application of Material Classes
45、 and Grades Structures Exposed at Low Temperatures To clarify material class requirements for plating attached to hull envelope plating exposed to low air temperature and to address the relationship between the design temperatures, in line with IACS UR S6. 3-1-2/3.7 Design Temperature tD To clarify
46、material class requirements for plating attached to hull envelope plating exposed to low air temperature and to address the relationship between the design temperatures, in line with IACS UR S6. 3-1-2/Figure 2 Commonly Used Definitions of Temperatures To clarify material class requirements for plati
47、ng attached to hull envelope plating exposed to low air temperature and to address the relationship between the design temperatures, in line with IACS UR S6. 3-2-A2/7.1 Required Information To specify that forward draft information is to be reviewed in the loading manual. 3-2-4/9.5 Under Boilers To
48、be consistent with the bottom clearance as per 4-4-1/19.3. 3-2-9/7.5 End Connections To provide an option of direct strength analysis. 3-2-10/3.1 Plating To address the calculation of the design head for tanks where rupture disks or pressure/vacuum valves are fitted. 3-2-11/1.3.1 Superstructures To
49、clarify superstructure deck requirements. 3-2-11/5.3 Doors for Access Openings To clarify the requirements for weathertight doors located on exposed bulkheads of superstructures and deckhouses. 3-2-12/3.3 Boiler Foundations To be consistent with the bottom clearance as per 4-4-1/19.3. 3-2-13/9 Propulsion Improvement Devices (PID) as Hull Appendages To eliminate confusion from the use of “ESD”, which is used elsewhere in the Rules and Guides for “Emergency Shutdown”. 3-2-13/9.7 (New) Structural End Connection To address the risk of cracks developing at the welded end connection of the d