ABS 2 PART 7-2018 RULES FOR SURVEY AFTER CONSTRUCTION 2018 PART 7.pdf

上传人:boatfragile160 文档编号:418511 上传时间:2018-11-06 格式:PDF 页数:677 大小:4.51MB
下载 相关 举报
ABS 2 PART 7-2018 RULES FOR SURVEY AFTER CONSTRUCTION 2018 PART 7.pdf_第1页
第1页 / 共677页
ABS 2 PART 7-2018 RULES FOR SURVEY AFTER CONSTRUCTION 2018 PART 7.pdf_第2页
第2页 / 共677页
ABS 2 PART 7-2018 RULES FOR SURVEY AFTER CONSTRUCTION 2018 PART 7.pdf_第3页
第3页 / 共677页
ABS 2 PART 7-2018 RULES FOR SURVEY AFTER CONSTRUCTION 2018 PART 7.pdf_第4页
第4页 / 共677页
ABS 2 PART 7-2018 RULES FOR SURVEY AFTER CONSTRUCTION 2018 PART 7.pdf_第5页
第5页 / 共677页
亲,该文档总共677页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 Part 7: Rules for Survey After Construction RULES FOR SURVEY AFTER CONSTRUCTION 2018 PART 7 (Updated February 2018 see next page) American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2017 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 North

2、chase Drive Houston, TX 77060 USA Updates February 2017 consolidation includes: January 2017 version plus Notice No. 1 and Corrigenda/Editorials Rule Change Notice (201 8 ) Rule Change Notice (2018) The effective date of each technical change since 1993 is shown in parenthesis at the end of the subs

3、ection/paragraph titles within the text of each Part. Unless a particular date and month are shown, the years in parentheses refer to the following effective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994

4、) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 Listing by Effective Dates of Changes from the 2017 Rules The reference date which is indicated in the parentheses following the title of the requirement in this Part is the date that the requirement becomes effective e.g., 7-3-2/3.19.3(a)i) “Ballas

5、t Tanks” (1 July 2017) is to apply for vessels undergoing survey on or after 1 July 2017. Notice No. 1 (effective on 1 July 2017) to the 2017 Rules, which is incorporated in the 2018 Rules, is summarized below. EFFECTIVE DATE 1 July 2017 shown as (1 July 2017) Part/Para. No. Title/Subject Status/Rem

6、arks 7-3-2/1.1.2(j) To require sounding tube closures to be included in the Annual Survey. (Incorporates Notice No. 1) 7-3-2/3.19.3(a)i) Ballast Tanks To align the requirements with the latest IACS UR Z10.3 requirements. (Incorporates Notice No. 1) 7-6-2/1.1.8(e) (New) Harmonic Distortion To introdu

7、ce requirements for survey of harmonic filters and harmonic distortion levels, in line with IACS UR E24 June 2016. (Incorporates Notice No. 1) 7-A-11/17.12 Cladding on Taper To address the early multiple failures of tail shafts related to defects in cladding at transition region. (Incorporates Notic

8、e No. 1) 7-A-11/17.15 Final Examination To address the early multiple failures of tail shafts related to defects in cladding at transition region. (Incorporates Notice No. 1) 7-A-14/1.1 Survey and Maintenance Intervals To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliabilit

9、y and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/1.2iv) (New) Reliability Based Maintenance (RBM) To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/1.2v) (New) Design for Reliability (DFR)

10、 To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/1.3 Optional Notation To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice

11、 No. 1) 7-A-14/Table 1 (New) Program Definitions, Notations and References To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/3.3 Surveys To align Appendix 7-A-14 with the Guide for Surveys Based on Machin

12、ery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/5.1 General To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) ABSRULES FOR SURVEY AFTER CONSTRUCTION .2018 iii Part/Para. No. Title/

13、Subject Status/Remarks 7-A-14/5.3 Implementation Surveys To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/5.5 Machinery Status Indicators To align Appendix 7-A-14 with the Guide for Surveys Based on Mach

14、inery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/9 (Title) Annual Surveys and Reporting Planned Maintenance and Condition Monitoring To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No.

15、 1) 7-A-14/9.5ii) To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/11 (Title) Onboard Documentation Planned Maintenance and Condition Monitoring To align Appendix 7-A-14 with the Guide for Surveys Based

16、on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/15 Condition Monitoring To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/ 15.5.1(a)vi) Baseline Data To align Appen

17、dix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/ 15.5.2(a)ii) To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/ 15.5.2(

18、a)iii) To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/17 Reliability Based (RBM) or Reliability Centered Maintenance (RCM) To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliabi

19、lity and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/18.3 Optional Notation To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/18.5iii) To align Appendix 7-A-14 with the Guide for Surveys Ba

20、sed on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) EFFECTIVE DATE 1 January 2018 shown as (2018) Part/Para. No. Title/Subject Status/Remarks 7-2-4 (Deleted) Survey After Ocean Transit Tow To remove redundant requirements (covered in Part 7 of the ABS MODU Rules). 7-

21、3-2/3.1.8 (New) Vessels other than Liquefied Gas Carriers Utilizing Gas or other Low Flash Point Fuels To align ABS rules with IACS and to further align ABS rules with the IGF Code and industry standards. 7-3-2/5.23.1 Containment Systems To account for limited access due to the configuration of the

22、containment system, that for CNG, the cargo containment system is not insulated, for higher pressures, that on CNG carriers are no interbarrier spaces, and that there could be large numbers of pressurized containers. 7-3-2/11.7.2 To align the requirements with the latest IACS UR Z10.2, Rev.33/6.4.2,

23、 UR Z10.4, Rev.14/6.4.2, UR Z10.5, Rev.16/6.4.2. iv ABSRULES FOR SURVEY AFTER CONSTRUCTION .2018 Part/Para. No. Title/Subject Status/Remarks 7-6-2/1.7 Vessels other than Liquefied Gas Carriers Utilizing Gas or other Low Flash Point Fuels To align ABS rules with IACS and to further align ABS rules wi

24、th the IGF Code and industry standards. 7-6-2/1.9 (Deleted) Vessels with Single or Dual Fuel Engines To align ABS rules with IACS and to further align ABS rules with the IGF Code and industry standards. 7-6-2/3.7 Vessels other than Liquefied Gas Carriers Utilizing Gas or other Low Flash Point Fuels

25、To align ABS rules with IACS and to further align ABS rules with the IGF Code and industry standards. 7-6-2/3.9 (Deleted) Vessels with Single or Dual Fuel Engines To align ABS rules with IACS and to further align ABS rules with the IGF Code and industry standards. 7-9-24 (New) Hull Inspection and Ma

26、intenance Program To incorporate the HIMP Survey Requirements in the Rules for Survey After Construction (Part 7). 7-9-25 (New) Lithium Batteries To incorporate Survey requirements from the ABS Guide for Use of Lithium Batteries in the Marine and Offshore Industries in the Rules for Survey After Con

27、struction (Part 7). 7-A-4/9 Thickness Measurement Company Approval Requirements To improve consistency of certification of hull thickness measurement firms and remove the reservation against IACS UR Z17. 7-A-4/Table 1A Individual Wastage Allowances, Non-CSR Tankers 90 M and Over Built to ABS Class T

28、o align with current practice for liquefied gas carriers and Rule change for bulkers and ore carriers in line with refinement of Rule requirements for oil carrier in 1 July 2005. 7-A-4/Table 1B (New) Individual Wastage Allowances, Liquefied Gas Carriers 90 M and Over Built to ABS Class To align with

29、 current practice for liquefied gas carriers and Rule change for bulkers and ore carriers in line with refinement of Rule requirements for oil carrier in 1 July 2005. 7-A-4/Table 1C (New) Individual Wastage Allowances, Other Conventional Vessels 90 M and Over Built to ABS Class To align with current

30、 practice for liquefied gas carriers and Rule change for bulkers and ore carriers in line with refinement of Rule requirements for oil carrier in 1 July 2005. 7-A-5/1 Thickness Measurement Company Approval Requirements To improve consistency of certification of hull thickness measurement firms and r

31、emove the reservation against IACS UR Z17. 7-A-14/21 (Deleted) ABS Offices Responsible for PMP and RCM To be consistent with other ABS Rules. Listing by Effective Dates of Changes from the 2018 Rules Notice No. 1 (effective on 1 February 2018) to the 2018 Rules is summarized below. EFFECTIVE DATE 1

32、February 2018 shown as (1 February 2018) Part/Para. No. Title/Subject Status/Remarks 7-3-2/1.1.17 (New) Cargo Space Fire Dampers and Ventilation Trunks/Ducts To require cargo space fire dampers to be included in the Annual Survey. (Incorporates Notice No. 1) 7-3-2/5.1.1 Survey Planning Meeting ESDC

33、and Non-ESP Vessels To require a written survey program, which is already required for ESP and ESDC vessels, in order to document the requirements and planned execution of the special survey. (Incorporates Notice No. 1) 7-3-2/5.1.7(a) Spaces To require internal examination of structural ventilation

34、ducts and structural downflooding ducts, in line with IACS Rec. 111. (Incorporates Notice No. 1) 7-3-2/5.1.18 (New) Cargo Space Fire Dampers To require cargo space fire dampers to be included in the Special Periodical Survey. (Incorporates Notice No. 1) 7-3-2/5.15.1 (Deleted) Survey Planning To remo

35、ve unnecessary requirement due to revision to 7-3-2/5.1.1 where all Non-ESP vessels are required to develop a written survey program. (Incorporates Notice No. 1) ABSRULES FOR SURVEY AFTER CONSTRUCTION .2018 v Part/Para. No. Title/Subject Status/Remarks 7-3-2/10 Preparations for Surveys of ESDC and N

36、on ESP Vessels To include all Non ESP vessels in addition to ESDC vessels. (Incorporates Notice No. 1) 7-A-8/2 (New) Sample Survey Plan for Special Surveys for Non ESP and Non ESDC Vessels To include all Non ESP vessels in addition to ESDC vessels. (Incorporates Notice No. 1) vi ABSRULES FOR SURVEY

37、AFTER CONSTRUCTION .2018 PART Foreword 7 Foreword (2001) In an effort to facilitate usage and better maintain survey after construction Rules, ABS has consolidated twenty-two (22) ABS Rules and Guides into this “Rules for Survey after Construction” booklet for 2001. These requirements apply to and s

38、upersede all survey after construction Rules required by the ABS Rules and Guides listed in Chapter 1, Section 1, Subsection 1 “Application” (7-1-1/1) of these Rules. These Rules do not apply to any other ABS Rules or Guide containing survey after construction requirements unless a particular Rule o

39、r Guide references any of the survey requirements of the ABS Rules or Guides listed in 7-1-1/1. Chapters 1 through 8 contains survey Rules that have common requirements for different vessel types and geographical service areas. Where survey requirements differ according to the vessels geographical l

40、imitation in these Rules, the chapter has been sectioned into Unrestricted Service, Great Lakes Service, and Rivers and Intracoastal Waterways Services. Where survey requirements are common to different vessel types, each survey type will contain requirements applicable to all vessels. When addition

41、al requirements are applicable to a specific vessel type, or are in lieu of the common requirement, they will be listed after the requirements for all vessels. The requirements for vessels in the Enhanced Survey Program (ESP) have been incorporated into each survey type. Chapter 9 contains survey re

42、quirements to maintain a Class Notation for an additional system or service. Chapters 10 through 12 contain unique survey Rules for Floating Drydocks, Underwater Vehicles and Sailing Yachts not Receiving AMS Notation. The survey interval and survey requirements noted in these chapters only apply to

43、these vessel types. The Appendix includes several ABS Guides relating to survey after construction and also contains planning, reporting and certification of thickness measurement firms required by the Enhanced Survey Program. In order to further explain the new formatting contained in these Rules,

44、sample vessels and their applicable survey requirements are illustrated in the table on the following page. ABSRULES FOR SURVEY AFTER CONSTRUCTION .2018 vii Examples: Sample Vessels: null A1 Bulk Carrier, null, null AMS, null ACCU (ESP) null A1 Oil Carrier, null, null AMS (ESP) A1 Container Carrier,

45、 AMS, ACCU, OMBO null A1 Barge, River, Bay and Sound Service Survey Type Bulk Carrier Oil Carrier Container Carrier Barge Annual Survey Hull All Vessel Requirements Specific Vessel requirements 7-3-2/1.1 7-3-2/1.7 7-3-2/1.1 7-3-2/1.13 7-3-2/1.1 7-3-2/1.1 7-3-2/1.5 Intermediate Survey Hull All Vessel

46、 Requirements Specific Vessel requirements 7-3-2/3.1 7-3-2/3.7 7-3-2/3.1 7-3-2/3.17 7-3-2/3.1 7-3-2/3.1 7-3-2/3.5 Special Periodical Survey Hull All Vessel Requirements Specific Vessel requirements Thickness Measurement requirements 7-3-2/5.1 7-3-2/5.7 7-3-2/5.7.3 7-3-2/5.1 7-3-2/5.13 7-3-2/5.13.4 7

47、-3-2/5.1 7-3-2/5.1.14(c) 7-3-2/5.1 7-3-2/5.5 7-3-4/1 7-3-4/1.3 Drydocking Survey 7-4-1/1 7-4-1/1 7-4-1/1 7-4-1/1 Tailshaft Survey 7-5-1/1 7-5-1/1 7-5-1/1 Not applicable Annual Survey Machinery All Vessel Requirements Specific Vessel requirements OMBO notation 7-6-2/1.1 7-6-2/1.1 7-6-2/1.3 7-6-2/1.1

48、7-9-3/1.1 7-6-2/1.1 Special Periodical Survey Machinery All Vessel Requirements Specific Vessel requirements 7-6-2/3.1 7-6-2/3.1 7-6-2/3.3 7-6-2/3.1 7-6-2/3.1 Boiler Survey 7-7-1 7-7-1 7-7-1 Not applicable Annual Survey Automation 7-8-1 7-8-1 7-8-1 Not applicable Special Periodical Survey Automation

49、 7-8-2 7-8-2 7-8-2 Not applicable viii ABSRULES FOR SURVEY AFTER CONSTRUCTION .2018 PART Table of Contents 7 Rules for Survey After Construction CONTENTS CHAPTER 1 Conditions for Survey After Construction . 1 Section 1 General Information . 3 CHAPTER 2 Survey Intervals . 15 Section 1 Vessels for Unrestricted Service 17 Section 2 Vessels in Great Lakes Service . 23 Section 3 Vessels in Rivers and Intracoastal Waterway Service 25 CHAPTER 3 Hull Surveys . 27 Section 1 Requirements for Internal Examination of All Vessels . 30 Section 2 Vessels for Unrestricted Service

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1