1、Recommended Practice on Subsea Production System Reliability, Technical Risk, and Integrity ManagementAPI RECOMMENDED PRACTICE 17NSECOND EDITION, JUNE 2017Special NotesAPI publications necessarily address problems of a general nature. With respect to particular circumstances, local, state, and feder
2、al laws and regulations should be reviewed.Neither API nor any of APIs employees, subcontractors, consultants, committees, or other assignees make any warranty or representation, either express or implied, with respect to the accuracy, completeness, or usefulness of the information contained herein,
3、 or assume any liability or responsibility for any use, or the results of such use, of any information or process disclosed in this publication. Neither API nor any of APIs employees, subcontractors, consultants, or other assignees represent that use of this publication would not infringe upon priva
4、tely owned rights.API publications may be used by anyone desiring to do so. Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, or guarantee in connection with this publication and
5、 hereby expressly disclaims any liability or responsibility for loss or damage resulting from its use or for the violation of any authorities having jurisdiction with which this publication may conflict.API publications are published to facilitate the broad availability of proven, sound engineering
6、and operating practices. These publications are not intended to obviate the need for applying sound engineering judgment regarding when and where these publications should be utilized. The formulation and publication of API publications is not intended in any way to inhibit anyone from using any oth
7、er practices.Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standard is solely responsible for complying with all the applicable requirements of that standard. API does not represent, warrant, or guarantee that such products do in fact conform
8、to the applicable API standard.All rights reserved. No part of this work may be reproduced, translated, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the Publisher
9、, API Publishing Services, 1220 L Street, NW, Washington, DC 20005.Copyright 2017 American Petroleum InstituteForewordNothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, or use of any method, apparatus, or product
10、 covered by letters patent. Neither should anything contained in the publication be construed as insuring anyone against liability for infringement of letters patent.The verbal forms used to express the provisions in this document are as follows.Shall: As used in a standard, “shall” denotes a minimu
11、m requirement in order to conform to the standard.Should: As used in a standard, “should” denotes a recommendation or that which is advised but not required in order to conform to the standard.May: As used in a standard, “may” denotes a course of action permissible within the limits of a standard.Ca
12、n: As used in a standard, “can” denotes a statement of possibility or capability.This document was produced under API standardization procedures that ensure appropriate notification and participation in the developmental process and is designated as an API standard. Questions concerning the interpre
13、tation of the content of this publication or comments and questions concerning the procedures under which this publication was developed should be directed in writing to the Director of Standards, American Petroleum Institute, 1220 L Street, NW, Washington, DC 20005. Requests for permission to repro
14、duce or translate all or any part of the material published herein should also be addressed to the director.Generally, API standards are reviewed and revised, reaffirmed, or withdrawn at least every five years. A one-time extension of up to two years may be added to this review cycle. Status of the
15、publication can be ascertained from the API Standards Department, telephone (202) 682-8000. A catalog of API publications and materials is published annually by API, 1220 L Street, NW, Washington, DC 20005.Suggested revisions are invited and should be submitted to the Standards Department, API, 1220
16、 L Street, NW, Washington, DC 20005, standardsapi.org.iiiContentsPage1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Normative References . . . . . . . . . . . . . . . . . .
17、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Terms, Definitions, Acronyms, and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23.1 Terms and Definitions. . . . . . . . . . . . . . . .
18、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23.2 Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74 Document Outline and Application .
19、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.2 Document
20、 Road Map. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.3 Project and Operation Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
21、 114.4 Equipment Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 124.5 Life Cycle Stages. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22、. . . . . . . . . . . . . . . 134.6 Company Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 135 Overview of Reliability, Technical Risk, and Integrity Management . . . . . . . . . . . . . . . . . . . . . .
23、 . . . . . . . . 145.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145.2 Underlying Philosophy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
24、 . . . . . . . . . . . . . . . . . . . . . . . . . . 145.3 Assessment and Management of Risk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 155.4 Define Step of DPIEF Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
25、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 175.5 Plan Step of DPIEF Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 215.6 Implement Step of the DPIEF Cycle . . . . . . . . . . . . . . . . . . . .
26、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 215.7 Evaluate Step of the DPIEF Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 225.8 Feedback Step of the DPIEF Cycle . . . . . . . . . . . . . . . . .
27、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 225.9 KPs for RIM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 246 Recommended Practice for Each Life Cycle Stag
28、e. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 266.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 266.2 Configuration Management (CM).
29、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 276.3 Application of the DPIEF Assurance Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 276.4 Timing of the DPIEF Loop in the
30、 Asset Life Cycle. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 296.5 Design Stages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 296.6 Manufacture, Assemb
31、ly, Testing, Installation, and Commissioning (MATIC). . . . . . . . . . . . . . . . . . . . . . . 296.7 Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 306.8 Field Upgrades and Field
32、Extensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 326.9 Life Extensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 326.10 Deco
33、mmissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33Annex A (informative) Technical Risk Categorization (TRC). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35Ann
34、ex B (informative) Detailed Description of Reliability and Integrity KPs . . . . . . . . . . . . . . . . . . . . . . . . . . . 40Annex C (informative) Risk-based Scope of Work for Reliability, Integrity, and Technical Risk Management. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
35、 . . . . . . . . . . . . . . . . . . . . . . . . 107Annex D (informative) Integrity Management Data Collection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136Annex E (informative) New Technology Qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
36、 . . . . . . . . . . . . . . . 143Annex F (informative) Application of Test Statistics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 160Bibliography . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
37、 . . . . . . . . . . . . . . . . . . . . . . . . . . 167vContentsPageFigures1 API 17N Road Map. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112 How API 17N Applies to a Companys Reliability, Technical Ris
38、k, and Integrity Management Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133 DPIEF Reliability and Integrity Assurance Cycle. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
39、 . . . . . . . . . . . . . . . 154 Assessment and Management of Risk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165 KPs for RIM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
40、 . . . . . . . . . . . . . . . . . . . . . . 246 Summary of the Life Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 267 Application of DPIEF Cycle to the Subsea System Life Cycle. . . . . . . . . . . . . . . . . .
41、 . . . . . . . . . . . . . . . . . 288 The Relative Time in the Asset Life Cycle That Each Stage of the DPIEF Loop Should Be Applied. . . . 309 Double DPIEF Loop in Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31B.1 Proc
42、edure for Allocation of RIM Goals and Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45B.2 Reliability and Integrity Activity Effort . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51B.3 Design for Re
43、liability and Integrity Process. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54B.4 Relationship Between Operators DfRI and Suppliers DfRI Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . 55B.5 Outline TQP . . . . . . . . . . . . .
44、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86B.6 Data Collection and Usage Strategy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90B.7 Example Output
45、from an RCMM Audit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99C.1 Typical Relationship Between the Operator and Supplier with Respect to Activities. . . . . . . . . . . . . . . 115E.1 Outline TQP . . . . . . . . . . . . . . . . . . .
46、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 144E.2 Decision Logic for Selection of Qualification Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146E.3 Sample Product Qualification Sheet . .
47、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 153Tables1 Operator Business Requirements and Reliability/Integrity Implications . . . . . . . . . . . . . . . . . . . . . . . . . . 242 Project and Asset Life Cycle Focus and Considerations . .
48、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27A.1 TRC for Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37A.2 TRC for Procedures. . . . . . . . . . . . . . . . . . .
49、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38A.3 Example Level of Effort Expected for Different TRC Risk Levels Throughout the Asset Life Cycle. . . . 39B.1 Types of Reliability and Integrity Assurance Evidence. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62B.2 Suggested Constituent Parts of an RIAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64B.3 FMECA Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .