API TR 5TRSR22-2002 Technical Report on SR22 Supplementary Requirements for Enhanced Leak Resistance LTC (First Edition)《SR22技术报告.增强防漏LTC用附加要求.第1版》.pdf

上传人:boatfragile160 文档编号:430187 上传时间:2018-11-10 格式:PDF 页数:27 大小:1.32MB
下载 相关 举报
API TR 5TRSR22-2002 Technical Report on SR22 Supplementary Requirements for Enhanced Leak Resistance LTC (First Edition)《SR22技术报告.增强防漏LTC用附加要求.第1版》.pdf_第1页
第1页 / 共27页
API TR 5TRSR22-2002 Technical Report on SR22 Supplementary Requirements for Enhanced Leak Resistance LTC (First Edition)《SR22技术报告.增强防漏LTC用附加要求.第1版》.pdf_第2页
第2页 / 共27页
API TR 5TRSR22-2002 Technical Report on SR22 Supplementary Requirements for Enhanced Leak Resistance LTC (First Edition)《SR22技术报告.增强防漏LTC用附加要求.第1版》.pdf_第3页
第3页 / 共27页
API TR 5TRSR22-2002 Technical Report on SR22 Supplementary Requirements for Enhanced Leak Resistance LTC (First Edition)《SR22技术报告.增强防漏LTC用附加要求.第1版》.pdf_第4页
第4页 / 共27页
API TR 5TRSR22-2002 Technical Report on SR22 Supplementary Requirements for Enhanced Leak Resistance LTC (First Edition)《SR22技术报告.增强防漏LTC用附加要求.第1版》.pdf_第5页
第5页 / 共27页
亲,该文档总共27页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Technical Report on SR22, Supplementary Requirements for Enhanced Leak Resistance LTC API REPORT 5TRSR22 FIRST EDITION, JUNE 2002 American Petroleum Institute Helping You Get The Job Done Right.“ Technical Report on SR22, Supplementary Requirements for Enhanced Leak Resistance LTC Upstream Segment A

2、PI REPORT 5TRSR22 FIRST EDITION, JUNE 2002 American Petroleum Institute Helping You Get The Job Done Right.“ SPECIAL NOTES API publications necessarily address problems of a general nature. With respect to partic- ular circumstances, local, state, and federal laws and regulations should be reviewed.

3、 API is not undertaking to meet the duties of employers, manufacturers, or suppliers to warn and properly train and equip their employees, and others exposed, concerning health and safety risks and precautions, nor undertaking their obligations under local, state, or fed- eral laws. Information conc

4、erning safety and health risks and proper precautions with respect to par- ticular materials and conditions should be obtained from the employer, the manufacturer or supplier of that material, or the material safety data sheet. Nothing contained in any API publication is to be construed as granting

5、any right, by implication or otherwise, for the manufacture, sale, or use of any method, apparatus, or prod- uct covered by letters patent. Neither should anything contained in the publication be con- strued as insuring anyone against liability for infringement of letters patent. Generally, API stan

6、dards are reviewed and revised, reaffirmed, or withdrawn at least every five years. Sometimes a one-time extension of up to two years will be added to this review cycle. This publication will no longer be in effect five years after its publication date as an operative API standard or, where an exten

7、sion has been granted, upon republication. Status of the publication can be ascertained from the API Upstream Segment telephone (202) 682-8000. A catalog of API publications and materials is published annually and updated quarterly by API, 1220 L Street, N.W., Washington, D.C. 20005. This document w

8、as produced under API standardization procedures that ensure appropri- ate notifcation and participation in the developmental process and is designated as an API standard. Questions concerning the interpretation of the content of this standard or com- ments and questions concerning the procedures un

9、der which this standard was developed should be directed in writing to the standardization manager, American Petroleum Institute, 1220 L Street, N.W., Washington, D.C. 20005. Requests for permission to reproduce or translate all or any part of the material published herein should also be addressed t

10、o the gen- eral manager. API standards are published to facilitate the broad availability of proven, sound engineer- ing and operating practices. These standards are not intended to obviate the need for apply- ing sound engineering judgment regarding when and where these standards should be utilized

11、. The formulation and publication of API standards is not intended in any way to inhibit anyone from using any other practices. Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standard is solely responsible for complying with all the applicable

12、requirements of that standard. API does not represent, warrant, or guarantee that such prod- ucts do in fact conform to the applicable API standard. All rights reserved. No part of this work may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photoco

13、pying, recording, or otherwise, without prior written permission from the publisher: Contact the Publishel; API Publishing Services, 1220 L Street, N. IT, Washington, D. C. 20005. Copyright O 2002 American Petroleum Institute FOREWORD API 5TRSR22 is under the jursidiction of the API Subcommittee on

14、Tubular Goods. API publications may be used by anyone desiring to do so. Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, or guarantee in connection with this publication and he

15、reby expressly disclaims any liability or responsibility for loss or damage resulting from its use or for the violation of any federal, state, or municipal regulation with which this publication may conflict. Suggested revisions are invited and should be submitted to the standardization manager, Ame

16、rican Petroleum Institute, 1220 L Street, N.W., Washington, D.C. 20005. . 111 CONTENTS Page 1 sR22 SCOPE . 1 ENHANCED LEAK RESISTANCE LTC . 3 SR22.2 Marking . 3 SR22.3 Optional Tapered Bore along the inside diameter Requirements for Casing with Special Drift Requirements . 3 SR22.4 Coupling Makeup .

17、 3 APPENDIX E SUPPLEMENTARY REQUIREMENTS (NORMATIVE) . 11 SR22 ENHANCED LEAK RESISTANCE LTC CONNECTION 11 SR22.2 Threadcontrol . 11 SR22.3 Coupling Thread Coatings . 11 SECTION 10 10.0 10.1 10.2 10.3 SR-22 PITCH DIAMETER GAUGING METHOD API RP 5B 1 17 Techniques for SR-22 gage verifcation . 17 Method

18、 for Determining the Pitch Diameter of a Threaded Member . . 17 The Internal and External Taper gage setting standard . 18 Thread Pitch Diameter gages and their associated setting standards . 18 APPENDIX B (RP 5C1-SR22) SUPPLEMENTARY REQUIREMENT FOR ENHANCED LEAK RESISTANCE LTC CONNECTION . 21 SR22.

19、2 Preparation and Inspection Before Running (Refer to 4.1) 21 SR22.3 STABBING. MAKING UP AND LOWERING (REFER TO 4.3) . 21 SR22.5 Causes of SR22 Casing Troubles (REFER TO 4.8.) . 22 SR22.1 Scope 21 SR22.4 Field Makeup (Refer to 4.4) 22 Figures SR22-1 Field End Paint Mark and Triangle Stamp (Stamp on

20、Mill and Field End) . . 4 SR22-2 Optional Tapered Bore along the Inside Diameter Specifications . 5 El-SR22 Basic Dimensions Power Tight Makeup 12 E2-SR22 Thread Form 13 Tables SR22- 1 6-9 El-SR22 Enhanced Leak Resistance LTC Thread Dimensions 14 E2 Dimensional Tolerances on SR22 Casing 8-Round Thre

21、ad Dimensions . 15 V Technical Report on SR22, Supplementary Requirements for Enhanced Leak Resistance LTC 1 Scope This document covers the supplemental requirements for Enhanced Leak Resistance LTC (SC22) connections and the changes in API Spec 5CT, API Std 5B, API 5B1 and API RP 5C1 needed to prod

22、uce and inspect these connections. By agreement between the purchaser and manufacturer, the sup- plemental requirements for SR22 shall apply to connections manufactured in acccordance with API Spec 5CT and may be marked with the API monogram. 1 Revisions Required in API Spec 5CT to Include the Suppl

23、ementary Requirements for SR22, Enhanced Leak Resistance LTC Connections Add the following as the last line in 5.1.3. Enhanced Leak Resistance LTC connections SR22 of Annex A Add the following new line to 8.12.2, end offinish list. Enhanced Leak Resistance LTC connections Add the following belowfina

24、l line in Table C. 67 and Table E. 67, Row 1 O. SR22 S22 P D P D Add the following Supplementary Requirement to Annex A By agreement between the purchaser and manufacturer, the supplemental requirements for Enhanced Leak Resistance LTC in SR22 shall apply. It should be noted that the SR22 product is

25、 fully interchangeable with standard API 5B LTC connections. However, the SR22 design criteria concerning leak resistance shall not apply for such mixed product. The application of API connections or pipe in elevated tempera- ture or sour service conditions is beyond the scope of this document. CAUT

26、ION; Liquid metal embrittlement may result when thread compound containing lead is used with tin plated cou- plings at elevated temperatures for some material. Use of standard API thread compound in applications involving tem- peratures in excess of 275F is cautioned. SR22 Enhanced Leak Resistance L

27、TC SR22.1 Casing and couplings shall be furnished with Enhanced Leak Resistance LTC connections in accordance with the requirements specified in Std 5B Appendix E SR22 for dimensions, inspection and coupling thread coatings. In addition, the casing shall comply with all of the requirements specified

28、 herein. SR22.2 MARKING SR22.2.a Die stamp marking the end of the pipe. A /4-in. high equilateral triangle die stamp shall be placed at a distance of from each end of each pipe using methods 3,4, or 5 of 1 1.2.1. See Figure SR22- 1. SR22.2.b Paint marking the end of the pipe. High vis- ibility green

29、 paint marks shall be applied on the field end of each pipe. See Figure SR22-1 and Std 5B Appendix E Table El. 3 SR22.2.c Die stamp marking the coup1ings.M COU- plings shall be marked “S22” using methods 3 or 5 of 11.2.1. SR22.2.d Color banding the couplings. Couplings shall be painted the colors in

30、dicative of the steel grade from which the couplings are manufactured, and shall also be painted with a high visibility green band around the outside surface near one end of the coupling. SR22.3 OPTIONAL TAPERED BORE ALONG THE INSIDE DIAMETER REQUIREMENTS FOR CASING WITH SPECIAL DRIFT REQUIREMENTS S

31、R22.3.1 For casing ordered with a larger than standard diameter drift mandrel, see 7.9, the manufacturer may drift or bore along the inside diameter of the ends of the pipe. This option requires each end either to be drifted with a special end drift in accordance with SR22.3.l.a, or be finished with

32、 an tapered bore along the inside diameter in accordance with SR22.3.1.b prior to coupling makeup. SR22.3.1 .a If the pipe ends are drifted, a special end drift with a minimum diameter in accordance with “special end drift diameter” column of Option 1 in Figure SR22-2 shall be used. The drift shall

33、be inserted a distance equal to or greater than b. Pipe ends that are too small to accept the special end drift should be bored along the inside diameter in accordance with SR22.3.1.b. SR22.3.1.b If bored, both ends of the pipe shall be bored along the inside diameter with a taper between 2” to 15”.

34、 CIO , the maximum diameter of the machined surface at the end of the pipe, and the angle of the tapered bore shall be in accor- dance with Option 2 in Figure SR22-2. The tapered bore machined surface need not run continuously around the inside circumference. The bore is to run smoothly to the pipe

35、inside diameter. If bored, the inside diameter of every pin end shall meet the requirements of Option 2 “Q,. SR22.4 COUPLING MAKEUP SR22.4.1 API RP 5A3 thread compound shall be applied in one of the three following methods: 1) to the pin thread only, 2) to the coupling thread only, or 3) to the pin

36、in approximately a one in. band at the large end of the thread and to the entire coupling thread (see API RP 5C1, SR22 Fig- ures SR22-1 and SR22-2). In all cases, the full thread form outline shall be clearly discernable after applying thread com- pound evenly over the surface. 4 API TECHNICAL REPOR

37、T 5TRSR22 l 4.0“ MINIMUM TRIANGLE STAMP I% PAINT LOCATION INDICATOR 1.5“ M INIMUM I L, +o“, -1116 I NOTES: 1. PAINT MARKS SHALL BE HIGH VISIBILITY GREEN COLOR. 2. THE PAINT MARKS MAY BE PLACED ON THE PIPE BY ANY METHOD, STENCIL, SPRAY, AS LONG AS THE PAINT MARK PRECISION IS MAINTAINED. 3.W TRIANGLE

38、STAMP Figure SR22-1-Field End Paint Mark and Triangle Stamp (Stamp on Mill and Field End) Note: It should be recognized by the user that compliance with API Rp 5A3 does not in and of itself ensure adequate thread compound system performance in field service. The user has the responsibility of evalua

39、ting the results obtained from the recommended procedures and test protocols and determining if the thread compound system in question meets the anticipated requirements of that particular field service application. SR22.4.2 The SR22 specifcation requires makeup based on power turns and position, no

40、t torque. Torque is not a basis for acceptance or rejection, but is an indicator of process con- trol. Makeup shall be rejected when the coupling does not make the position criteria with minimum power-turns. SR22.4.3 Power make-up speed shall not exceed 10 RPM SR22.4.4 Makeup Acceptance Criteria Opt

41、ions are allowed for SR22 connection makeup. Makeup shall be rejected when the coupling does not make the position criteria with minimum power-turns. Any connec- tion in which the face of the coupling advances beyond the apex of the triangle shall be rejected. Control of the coupling makeup shall be

42、 by one of the following methods: SR22.4.4.a By Power Turns. The number of power turns shall equal or exceed the minimum number of power turns specified in Table SR22-1. Counting power turns should start at a reference start torque specified in Table SR22-1. Ensure proper alignment in makeup equipme

43、nt and iden and min- imize abnormal sources of torque oscillation. SR22.4.4.b By Position. Makeup the face of the coupling within the triangle mark. Verify that the number of power turns is equal to or exceeds the number of power turns speci- fied in Table SR22- 1 during operations. SR22.4.5 If a co

44、nnection is broken-out, subsequent makeup shall be per SR22.4.4.1. SUPPLEMENTARY REQUIREMENTS FOR ENHANCED LEAK RESISTANCE LTC 5 7“ - 23.00 7“ - 32.00 8-5/$ - 32.00 8-5/8“ - 40.00 9-5/8“ - 40.00 9-5/8“ - 47.00 9-5/8“ - 53.00 OPTION 1 OPTION 2 6.326 6.366 6.070 6.094 7.951 7.921 7.701 7.725 8.826 8.8

45、35 8.701 8.681 8.576 8.535 d SPECIL END DRIFT DCA 7“-32.00 3-5/8“ - 32.00 6.000 6.094 4.000 6.200 2-15“ 7.875 7.921 4.500 8.050 2-15“ SPECIAL INSIDE CHAMFER CHAMFER CHAMFER DCA 7“-23.00 6.250 6.366 4.000 6.400 2-15“ 3-5/8“-40.00 3-5/8“ - 47.00 8.750 8.835 4.750 8.95 2-15“ 8.625 8.681 4.750 8.800 2-1

46、5“ I 3-5/8“ -40.00 I 7.625 I 7.725 I 4.500 I 7.800 I 2-15“ I I I I I I I I Figure SR22-2: Optional Tapered Bore along the Inside Diameter Specifications 6 API TECHNICAL REPORT 5TRSR22 Outside Grade Diameter D In. Table SR22-1 Length; end of pipe to Apex of Traingle L9 (in.) Coupling Minimum Drift Ou

47、t. Dia. Power In. Regular Turns W (in.) N Approx. Start Torque Tin Torque ft-lbs. Recommended Weight of API BUL 5A3 ref. Zompound (5A2) Weight Approx. Phosphate Torque ft-lbs. 1/2- 11.60 J/K55 4.500 3.875 5.000 3 130 217 1/2-11.60 L/N80 1/2 - 13.50 L/N 80 4.500 3.875 5.000 4.500 3.795 5.000 3 3 124

48、206 136 227 1/2 - 11.60 C90 1/2 - 13.50 C90 4.500 3.875 5.000 4.500 3.795 5.000 3.250 3 3 (all 4.5 label) 127 143 15 gms (all 4.5 label) 1/2- 11.60 Cm95 1/2 - 13.50 C/T 95 4.500 3.875 5.000 4.500 3.795 5.000 3 3 130 146 1/2- 11.60 PI10 1/2 - 13.50 PI10 4.500 3.875 5.000 4.500 3.795 5.000 3 3 130 148

49、 WA 116 193 125 208 - 13.00 J/K 55 - 15.00 J/K 55 5.000 4.369 5.563 5.000 4.283 5.563 3 3 - 15.00 L/N 80 - 18.00 L/N 80 5.000 4.283 5.563 5.000 4.151 5.563 3.5 3.5 164 237 220 367 - 15.00 c 90 - 18.00 c 90 5.000 4.283 5.563 5.000 4.151 5.563 3.625 3 3 (all 5 label) 198 238 20 gms (all 5 label) - 15.00 crr 95 - 18.00 crr 95 5.000 4.283 5.563 5.000 4.151 5.563 3.5 3.5 202 243 - 15.00 PI10 - 18.00 PI10 5.000 4.283 5.563 5.000 4.151 5.563 3.5 3.5 208 248 Note: API 5A3 reference thread compound (formerly MI 5A2) contains metals including lead, and has a specific gravity near

展开阅读全文
相关资源
  • API SALES OF NGL & LRG-2018 2016 Sales of Natural Gas Liquids and Liquefied Refinery Gas.pdfAPI SALES OF NGL & LRG-2018 2016 Sales of Natural Gas Liquids and Liquefied Refinery Gas.pdf
  • API MPMS 9 4-2018 Manual of Petroleum Measurement Standards Chapter 9 4-Continuous Density Measurement Under Dynamic (Flowing) Conditions (FIRST EDITION).pdfAPI MPMS 9 4-2018 Manual of Petroleum Measurement Standards Chapter 9 4-Continuous Density Measurement Under Dynamic (Flowing) Conditions (FIRST EDITION).pdf
  • API MPMS 9 3-2012 Manual of Petroleum Measurement Standards Chapter 9 3 Standard Test Method for Density Relative Density and API Gravity of Crude Petroleum and.pdfAPI MPMS 9 3-2012 Manual of Petroleum Measurement Standards Chapter 9 3 Standard Test Method for Density Relative Density and API Gravity of Crude Petroleum and.pdf
  • API MPMS 9 2-2012 Manual of Petroleum Measurement Standards Chapter 9 2 Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure H.pdfAPI MPMS 9 2-2012 Manual of Petroleum Measurement Standards Chapter 9 2 Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure H.pdf
  • API MPMS 9 1-2012 Manual of Petroleum Measurement Standards Chapter 9 1 Standard Test Method for Density Relative Density or API Gravity of Crude Petroleum and .pdfAPI MPMS 9 1-2012 Manual of Petroleum Measurement Standards Chapter 9 1 Standard Test Method for Density Relative Density or API Gravity of Crude Petroleum and .pdf
  • API MPMS 8 5-2015 Manual of Petroleum Measurement Standards Chapter 8 5 Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils Condensate.pdfAPI MPMS 8 5-2015 Manual of Petroleum Measurement Standards Chapter 8 5 Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils Condensate.pdf
  • API MPMS 8 5 SPANISH-2015 Manual of Petroleum Measurement Standards Chapter 8 5 - Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils .pdfAPI MPMS 8 5 SPANISH-2015 Manual of Petroleum Measurement Standards Chapter 8 5 - Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils .pdf
  • API MPMS 8 4-2017 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (FOURTH .pdfAPI MPMS 8 4-2017 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (FOURTH .pdf
  • API MPMS 8 4-2014 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (THIRD E.pdfAPI MPMS 8 4-2014 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (THIRD E.pdf
  • API MPMS 8 3-1995 Manual of Petroleum Measurement Standards Chapter 8 - Sampling Section 3 - Standard Practice for Mixing and Handling of Liquid Samples of Petr.pdfAPI MPMS 8 3-1995 Manual of Petroleum Measurement Standards Chapter 8 - Sampling Section 3 - Standard Practice for Mixing and Handling of Liquid Samples of Petr.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > API

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1