ARMY MIL-C-60996 A NOTICE 2-2013 Charge Demolition Roll M186 Parts Loading Assembling and Packing.pdf

上传人:bonesoil321 文档编号:441966 上传时间:2018-11-15 格式:PDF 页数:1 大小:53.79KB
下载 相关 举报
ARMY MIL-C-60996 A NOTICE 2-2013 Charge Demolition Roll M186 Parts Loading Assembling and Packing.pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 MIL-C-60996A (AR) NOTICE 2 18 January 2013 SUPERSEDING NOTICE 1 9 May 1986 DETAIL SPECIFICATION Charge, Demolition Roll, M186 Parts, Loading, Assembling and Packing MIL-C-60996A, dated 11 March 1968, is inactive for new design, and is no longer used, except for replacement purposes. Custodians: Pre

2、paring activity: Army AR Army AR (Project 1375-2013-018) Note: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST online database at https:/assist.dla.mil. AMSC N/A FSC 1375 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOTICE OF INACTIVE FOR NEW DESIGN INCH-POUND Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • API RP 75-2004 Recommended Practice for Development of a Safety and Environmental Management Program for Offshore Operations and Facilities (THIRD EDITION)《开发外大陆架作业及实施的安全及环境管理程序.第3.pdf API RP 75-2004 Recommended Practice for Development of a Safety and Environmental Management Program for Offshore Operations and Facilities (THIRD EDITION)《开发外大陆架作业及实施的安全及环境管理程序.第3.pdf
  • API RP 751-2013 Safe Operation of Hydrofluoric Acid Alkylation Units (Fourth Edition)《氢氟酸烷基化装置的安全操作》.pdf API RP 751-2013 Safe Operation of Hydrofluoric Acid Alkylation Units (Fourth Edition)《氢氟酸烷基化装置的安全操作》.pdf
  • API RP 752-2009 Management of Hazards Associated with Location of Process Plant Permanent Buildings (Third Edition)《与加工厂永久建筑物位置有关的危害管理.第3版》.pdf API RP 752-2009 Management of Hazards Associated with Location of Process Plant Permanent Buildings (Third Edition)《与加工厂永久建筑物位置有关的危害管理.第3版》.pdf
  • API RP 755-2010 Fatigue Risk Management Systems for Personnel in the Refining and Petrochemical Industries (First Edition)《炼油和石化工业中人员用疲劳风险管理系统.第1版》.pdf API RP 755-2010 Fatigue Risk Management Systems for Personnel in the Refining and Petrochemical Industries (First Edition)《炼油和石化工业中人员用疲劳风险管理系统.第1版》.pdf
  • API RP 756-2014 Management of Hazards Associated with Location of Process Plant Tents (FIRST EDITION) .pdf API RP 756-2014 Management of Hazards Associated with Location of Process Plant Tents (FIRST EDITION) .pdf
  • API RP 781-2016 Facility Security Plan Methodology for the Oil and Natural Gas Industries (First Edition) .pdf API RP 781-2016 Facility Security Plan Methodology for the Oil and Natural Gas Industries (First Edition) .pdf
  • API RP 7C-11 F CHINESE-1994 Recommended Practice for Installation Maintenance and Operation of Internal-Combustion Engines (FIFTH EDITION) .pdf API RP 7C-11 F CHINESE-1994 Recommended Practice for Installation Maintenance and Operation of Internal-Combustion Engines (FIFTH EDITION) .pdf
  • API RP 7G-2-2009 Recommended Practice for Inspection and Classification of Used Drill Stem Elements (First Edition ERTA 1 October 2009)《钻杆元件用检验和分类的推荐实施规程.第1版 合并勘误表1-2009年10月》.pdf API RP 7G-2-2009 Recommended Practice for Inspection and Classification of Used Drill Stem Elements (First Edition ERTA 1 October 2009)《钻杆元件用检验和分类的推荐实施规程.第1版 合并勘误表1-2009年10月》.pdf
  • API RP 7L-1995 Procedures for Inspection Maintenance Repair and Remanufacture of Drilling Equipment (First Edition Includes Addendum 1 02 2006 Addendum 2 3 2006)《钻井设备的检测、维护、维修和改造.增.pdf API RP 7L-1995 Procedures for Inspection Maintenance Repair and Remanufacture of Drilling Equipment (First Edition Includes Addendum 1 02 2006 Addendum 2 3 2006)《钻井设备的检测、维护、维修和改造.增.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1