ARMY MIL-C-63310 (6)-1986 CARTRIDGE 105MM APFSDS-T M774 LOADING ASSEMBLING AND PACKING《M774型105MM炮弹 APFSDS-T的装载 组装及包装》.pdf

上传人:livefirmly316 文档编号:442037 上传时间:2018-11-15 格式:PDF 页数:12 大小:443.20KB
下载 相关 举报
ARMY MIL-C-63310 (6)-1986 CARTRIDGE 105MM APFSDS-T M774 LOADING ASSEMBLING AND PACKING《M774型105MM炮弹 APFSDS-T的装载 组装及包装》.pdf_第1页
第1页 / 共12页
ARMY MIL-C-63310 (6)-1986 CARTRIDGE 105MM APFSDS-T M774 LOADING ASSEMBLING AND PACKING《M774型105MM炮弹 APFSDS-T的装载 组装及包装》.pdf_第2页
第2页 / 共12页
ARMY MIL-C-63310 (6)-1986 CARTRIDGE 105MM APFSDS-T M774 LOADING ASSEMBLING AND PACKING《M774型105MM炮弹 APFSDS-T的装载 组装及包装》.pdf_第3页
第3页 / 共12页
ARMY MIL-C-63310 (6)-1986 CARTRIDGE 105MM APFSDS-T M774 LOADING ASSEMBLING AND PACKING《M774型105MM炮弹 APFSDS-T的装载 组装及包装》.pdf_第4页
第4页 / 共12页
ARMY MIL-C-63310 (6)-1986 CARTRIDGE 105MM APFSDS-T M774 LOADING ASSEMBLING AND PACKING《M774型105MM炮弹 APFSDS-T的装载 组装及包装》.pdf_第5页
第5页 / 共12页
亲,该文档总共12页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、HIL-C-633LO (b) 13 97977Ob 0347874 3 H MIL-C-63310 (AR) AMENDMENT 6 18 May 1986 SUPERSEDING AMENDMENT 5 18 February 1986 MILITARY SPECIFICATION CARTRIDGE: 105mm, APFSDS-Ti M774 LOADING, ASSEMBLY AND PACKING This amendment forms a part of Military Specification MIL-C-63310 (AR), dated 23 May 1980, an

2、d is approved for use within the US Army Armament, Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. Delete all reference to “XM774“ and substitute “M774“. PAGE 1 Under SPECIFICATIONS MILITARY, add: “MIL-P-70465 - Plug and Disc Asse

3、mbly, 8597489“. PAGE 2 * Under Standards Military, add: *- - “MIL-STD-1235 - Single and Multi-Level Continuous Sampling Procedures and Tables for Inspection by Attributes“ * 2.1.2 Other Government documents, drawinqs, and publications. Under Drawings, add : “12631100 - Packing and Marking for Contai

4、ner, Ammo, 3.1.2 (U) Pluq and disc assemblies: Add new paragraph -3.1.2 Metal, for Ctg, 105mm, APFSDS-T: M735/M774“ as follows: “3.1.2 (U) Pluq and disc assemblies. Plugs, discs, and plug and disc assemblies shall be drawn from lots inspected and accepted in accordance with MIL-P-70465.“ Add paragra

5、ph 3.2.2 as follows: “3.2.2 (U) Radiographic examination. The cartridge shall be radiographed in accordance with 4.5.9. Visual standards shall be established by ARRADCOM. “ BSMC N/A Page 1 of 12 FSC 1315 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IH

6、SNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-63310 (6) 13 m 7777906 O347875 5 W MIL-C-63310 (AR) AMENDMENT 6 PAGE 3 Delete paragraph 3.4.4 in its entirety and substitute: “3.4.4 (U) Muzzle velocity. The corrected muzzle velocity of the cartridge when fire

7、d at 700F shall be not greater than 4990 fps and shall be not less than 4910 fps.“ PAGE 6 Table I, Cartridge, 105mm, APFSDS-T, M774, under “Swipe Test“: Add the following examination: “Rad i og r aph i c ex ami n a t i on 40 3.2.2 4.5.9.1“. PAGE 10 4.4.2.2 (U) Projectile, prior to assembly with cart

8、ridge case: Add major characteristic 102 as follows: “102 Hardcoat on fin leading edge nissing or damaged after checking tracer torque O. 40% (a) 3.2 Visual“ . Under Notes, add Note (a) as follows: “(a) This examination shall be performed on all projectiles which are tested for tracer torque.“ PAGE

9、12 4.4.2.4 (U) Case, cartridge and liner assembly: Delete in its entirety and substitute the new page 12, attached. PAGE 17 4.4.2.9 (U) Shield, water-repellant. Delete minor characteristics 201 and 202 in their entirety and substitute: “201 True position of recessed slots 0.65% 3.2 Gage 202 Depth of

10、 recess slots 0.65% 3.2 Gage“. PAGE 19 4.4.2.11 (U) Cartridge, 105MM, APFSDS-T, M774: Add major characteristic 111 as follows: “111 Radiographic examination 10 3.2. 4.5.9.1“. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- A ._. - _- . MIL-C-b33LO

11、 (6) 13 M 7977706 0347876 7 M MIL-C-63310 (AR) AMENDMENT 6 PAGE 23 * Add new paragraphs 4.4.2.16, page 23A (included) *and 4.4.2.17, page 23B (included) . PAGE 24 4.4.2.1.2 (U) Production lots. Delete Code letter “G“ and substitute Code letter “F“. PAGES 26 Delete 4.5.8 (U) Providinq ground function

12、al tests and 4.5,8.1 (U) Target impact dispersion in their entirety and substitute the following: “4.5.8 (U) Ballistic tests shall be performed at a proving ground in accordance with the applicable Acceptance Test Procedure.“ a. (U) All firings for target impact dispersion (TID) shall be from a fixe

13、d type facility mount utilizing a muzzle boresight or properly maintained service tank with operable fire control and fixtured with an M68 gun tube. When firing from a tank, the tanks recoil and mechanical fire control systems shall be inspected prior to testing. b, (U) The ballistic samples shall b

14、e electrically fired using energy equivalent to the service tanks firing circuit. C. (U) Testing shall be conducted with 105MM, MC8 gun tubes. All gun tubes shall be painted white or a sunscreen or thermal sleeve shall be utilized. All gun tubes shall be dedicated for 700F TID testing of M774 cartri

15、dges. The remaining life of the tubes utilized in each phase shall not exceed the wear limits given in 6.4. d. (U) Tubes used shall be inspected for adequacy prior to initiating each firing program. The gun tubes shall be inspected for adequacy by performing, at a minimum, visual inspection, pullove

16、r gaging and complete stargage and borescope inspections. At nominal midlife the tubes shall be inspected for adequacy by performing complete stargage and magnetic particle testing . 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-C-63310 (6)

17、13 7779706 O347877 7 a MIL-C-6 3 3 1 O (AR) AMENDMENT 6 e. (U) All gun tubes shall be inspected when unexpected occurrences, such as projectile breakup, cartridge case rupture, etc., are experienced during any of the test phases. Required inspection after these instances shall include visual inspect

18、ion, pullover gaging and complete stargage, borescope and magnetic particle inspection. f. (U) TID tests shall be conducted by firing sample cartridges specified herein at a 20 foot by 20 foot (6.1 by 6.1 meters) target located 3000 meters from the gun muzzle. The target shall have a 10 foot border

19、on all sides for determination of erratic flight. The target shall be made of a material approved by the technical agency. Targets used for hot firing phases shall allow determination of fin hardcoat degradation and fin burning . g. (U) A sufficient number of rounds for instrumentation checkout, muz

20、zle velocity stabilization and spotting purposes will be fired prior to the start of the test. h. (U) When firing from a fixed mount, muzzle boresighting and aiming procedures shall be used to aim the weapon so the expected point of impact will be the center of the target. The group center of impact

21、 of at lease three consecutively fired spotter rounds must be within a 1 meter square located at the center of the target before firing the control or test rounds. i. (U) When firing from a fixed mount, once the gun has been spotted on the target for a test or control group, the elevation and deflec

22、tion of the weapon shall remain the same for that test group. Changes in the muzzle aiming point from round to round, shall be recorded by adjusting settings on the boresight to get back onto the original aiming mark. j. (U) when firing from a service tank, the following firing procedures shall be u

23、tilized: 1. Boresight the weapon on the center of target and apply super elevation utilizing a gunnery quadrant. Fire spotter rounds to assure the weapon is zeroed on the target center. The group center of impact for a minimum of three consecutive rounds within a one 4 i) Provided by IHSNot for Resa

24、leNo reproduction or networking permitted without license from IHS-,-,-MIL-C-6 3 3 1 O (AR) AMENDMENT 6 meter square of the target center is required. Finalize reticle setting on aiming stake. After the target has been spotted for a shot group, every effort should be made to keep the elevation and d

25、eflection of the weapon the same for the shot group by relaying on the aiming stakes . 2. After loading and locking a round in the chamber, the gun tube shall be traversed left of target center, dropped down below target center, traversed to the opposite side of target center, elevated to target cen

26、ter elevation, and traversed onto target center. The distance traversed and dropped should be sufficient to remove the backlash from the system. If the sight is above or beyond target center, do not reverse direction of gun tube movement but repeat the sequence. 3. During dispersion testing a maximu

27、m of one minute shall elapse from final sighting until the round is fired. If the one minute is exceeded, the weapon shall be re-sighted prior to firing. k. (U) Target impact dispersion testing shall be fired in the following manner: five calibration rounds followed by ten test rounds. For data anal

28、ysis purposes, test and calibration groups shall be broken down into five round groups where possible (group sizes will vary if test is truncated). The standard deviations for the test and calibration groups shall be pooled by the equation of 6.7. 1. (U) The time interval between rounds (test, calib

29、ration and spotter) shall be the minimum time possible, with a maximum of 10 minutes between rounds permitted. If this maximum time is exceeded, then the test and calibration groups shall be truncated. The leftover rounds shall be fired as part of the next group or as a new group as applicable. Duri

30、ng testing from a service tank a maximum of one minute shall elapse from final sighting until the round is fired. If more than a thirty minute lapse occurs between group firings, or if there was an indication of trend in the previous groups target impacts to move away from the center of the target,

31、then the weapon shall be re-zeroed on target center using the procedures required to establish the original test conditions. 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-63310 (6) 23 7777706 03q7877 2 MIL-C-6 3 31 O (AR) AMENDMENT 6 m. (U)

32、 Muzzle velocity shall be measured and recorded for each cartridge. For calibration rounds, pressure shall be obtained using two copper crusher gages placed in the base of the cartridge case. Gage numbers shall be recorded for each calibration cartridge. n. (U) For each test round, spotter and calib

33、ration round a clearly defined image (35mm smear) of the initial flight of the projectile (reference rounds, calibration rounds, test rounds, etc.) shall be recorded of 12.0 + 0.5 feet (3.66 + 0.15 meters) and 35.0 -t 0.5 feet (105-68 - + 0.15 meters) forward of the gun muzzle. o. (U) A TV camera or

34、 forward observer shall be placed at the target to observe and record target impacts. p. (U) Tracer flight shall be observed to the target. Any abnormality of flight is to be described (cork screwing, tumbling, yaw, etc.), as well as target impact information (hit target, short by 100 meters, left o

35、f target, etc.). If a round misses the target with no abnormality of flight, a statement to that effect should also be made. q. (U) Observations s.hall be made for conformance to all requirements. r. (U) All recorded information shall be provided in the firing report and submitted to the procuring a

36、ctivity (see 6.2.3). This shall include, as a minimum, wind velocities and wind directions at the gun tube, gun tube number, chamber pressure, muzzle velocity, impact Co-ordinates, misfire (see 3.4.1.1) and hangfire (see 3.4.1.2) , standard deviation (vertical and horizontal dispersion in mils) , ma

37、ximum spread (vertical and horizontal dispersion in centimeters), center of impact for test and calibration groups and metal parts security. s. (U) Testing shall not be performed during weather that may make observations inaccurate or otherwise affect the results of the test. Firings shall not be pe

38、rformed when a surface crosswind speed of 10 knots or when gusts 5 knots greater than the surface crosswind speed exist . e- - t. (U) In the event of adverse test conditions or failure of the calibration rounds to meet the requirements for the calibration round configuration when test rounds fail to

39、 meet the requirements of 3.4.3, the lot being tested shall be retested (see 6.5).“ 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-(2-63310 (AR) AMENDMENT 6 PAGE 28 Add paragraphs 4.5.9, 4.5.9.1, 4.5.9.2, 4.5.9.2.1, and 4.5.9.2.1.1 as follows:

40、 “4.5.9 (U) Radiographic examinations. 4.5.9.1 (U) First article. The first article cartridges, including tank validation rounds, shall be radiographed in two positions 900 apart. The radiographs shall be examined for improper installation or adherance of the Ti02 liner to the cartridge case (see 3.

41、2.2) . 4.5.9.2 (U) Production. All ballistic test cartridges shall be radiographed in two positions 900 apart to inspect for improper installation or adherance of the liner (see 3.2.2) . Failure of one or more cartridges to meet the acceptance criteria shall result in rejection of those cartridges a

42、nd selection of a second sample for radiographic examination. The second sample shall be selected from the lot as follows: Cartridge Lot Size 200-4,999 5,000-10,000 Sample Size 200 315 Examination of the second sample and all subsequent inspection may be performed using either radiography, or fluoro

43、scopy in accordance with 4.5.9.2.1. Failure of one or more cartridges in the second sample, to meet the applicable criteria shall be cause for 100 percent radiographic or fluoroscopic screening of the remainder of the lot. Any cartridge failing to meet the acceptance criteria shall be cause for reje

44、ction of that cartridge. All cartridges failing to meet the acceptance criteria shall be separated from the lot and reported to the procuring activity (see 6.2.3) . 4.5.9.2.1 (U) Fluoroscopic inspection. Cartridges subjected to fluoroscopy shall be rotated 360 degrees to provide a complete inspectio

45、n. Fluoroscopic inspection shall use equipment and procedures approved in accordance with 4.4.4. 4.5.9.2.1.1 (U) Inspection verification. Adequacy of the fluoroscopic inspection shall be determined, by properly rejecting a cartridge containing an approved defect, at the beginning and end of each shi

46、ft, or whenever the system or 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-63330 (6) 33 = 777770b 0347883 O MIL-C-63310 (AR) AMENDMENT 6 any part of the system is shut down and restarted, or when any control adjustments or calibrations are

47、 made. When verification indicates that the fluoroscopic equipment is performing incorrectly, the quantity of cartridges processed since the last satisfactory verification shall be retested. The video recorder shall be checked to verify functioning prior to startup.“ Add paragraphs 4.5.9.3, 4.5.9.3.

48、1, 4.5.9.3.2 and 4.5.9.3.3 as follows: 114. 5.9.3 (U) Personnel qualification and certification. Personnel performing radiographic inspection in accordance with 4.5.9 shall meet the qualification and certification requirements defined in MIL-STD-410 as follows: 4.5.9.3.1 (U) Set up and calibration.

49、Level II. 4.5.9.3.2 (U) Operator. Level I. 4.5.9.3.3 (U) Certification procedures. The contractor will prepare and submit for approval, in accordance with data item description number D-S-3628 and the DD Form 1423, the detailed procedures for qual i fi cat ion and Cer ti fi cati on o personnel performing the nondestructive testing procedures re qui red her ein . I * Add new paragraph: “4.5.10 (U) Air pressure test. The p

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1