ARMY MIL-D-48889-1976 DELAY ELEMENT PA 500 FOR MINE M16《M16型地雷用PA 500机械型号》.pdf

上传人:roleaisle130 文档编号:442444 上传时间:2018-11-15 格式:PDF 页数:16 大小:430.95KB
下载 相关 举报
ARMY MIL-D-48889-1976 DELAY ELEMENT PA 500 FOR MINE M16《M16型地雷用PA 500机械型号》.pdf_第1页
第1页 / 共16页
ARMY MIL-D-48889-1976 DELAY ELEMENT PA 500 FOR MINE M16《M16型地雷用PA 500机械型号》.pdf_第2页
第2页 / 共16页
ARMY MIL-D-48889-1976 DELAY ELEMENT PA 500 FOR MINE M16《M16型地雷用PA 500机械型号》.pdf_第3页
第3页 / 共16页
ARMY MIL-D-48889-1976 DELAY ELEMENT PA 500 FOR MINE M16《M16型地雷用PA 500机械型号》.pdf_第4页
第4页 / 共16页
ARMY MIL-D-48889-1976 DELAY ELEMENT PA 500 FOR MINE M16《M16型地雷用PA 500机械型号》.pdf_第5页
第5页 / 共16页
亲,该文档总共16页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、8 - c - - MIL-D-qB7 13 7977706 0325256 T MIL- D- 4 8 8 89 (PA) 5 MARCH -1976 MILITARY SPEC1 FI CATI ON DELAY ELEMENT, PA 500, FOR MINE M16 This specification is approved for use by Picatinny Arsenal, Department of the Army, and is available for use by all Departments and Agencies of the Department o

2、f Defense. 1. SCOPE - 1.1 This specification covers the loading, assembling and packing for the Delay Element For The M16A2 Antipersonnel Mine. 2. APPLICABLE DOCUMENTS - 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal form a part of this spec

3、ification to the extent specified herein. SPEC I FI CAT IONS MILITARY MIL-P-116 - MIL-P-223 - MIL-A-48078 - STANDARDS -IL ITARY MIL-STD-105 - MI L-STD-1168 - MI L-STD- 12 35 - Preservation - Packaging, Methods of Powder, Black Ammuni t ion, Stan dard Qual it y As s ur an ce Provisions, General Speci

4、fication For Sampling Procedures and Tables for Inspection by Attribu.tes (ABC-STD- 105) Lot Numbering of Ammunition Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes #- THIS DOCUMENT CONTAINS 16 PAGES; . Provided by IHSNot for ResaleNo reproduction or netw

5、orking permitted without license from IHS-,-,-MIL-D-48889 13 777790b 0325257 I W -* - MIL- P- 4 86 8 9 (PA) DRAIV I N G S U. S . ARMY PICATINNY ARSENAL 8796352 - Delay Element, Mine: PA 500 9311219 - Box Set-up, Packing, Ammunition, for Delay Element, Mine: PA 500 9311220 - Packing and Marking for B

6、ox, Wirebound and Box, Metal, Ammunition M2A1 for Delay Element, Mine: PA 500 (Copies of specifications, standards and drawings required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the Contracting Officer). 3. REOU

7、IREMENTS 3.1 Material. - Materials and parts shall be in accordance with applicable .drawings and specifications . 3.2 Moisture Content of Black Powder. The moisture content of the black powder at the. time of loading shall not exceed the percentage specified in Specification MIL-P- 223. 3.3 Workman

8、shi . All parts shall be fabricated and finished + or a ricated and loaded) in a thorough, workman- like manner, and all manufacturing, processing and assembly operations shall be. correctly performed. The parts shall be clean and free of burrs, sharp edges, unblended radii, surface defects, chips,

9、dirt, grease and oil (except where specifically required), corrosion products and other foreign matter. The cleaning method used shall not be injurious to any part, nor shall the parts be contaminated by the cleaning agent. Exterior surface coatings shall be continuous except for a few light scratch

10、es not exposing base material. required markings shall be neat and sharply defined, All 3.4 First Article Inspection. This specification contains technicallt icle inspec tion . for the submission of first article samples by the contractor shall be as specified in the contract. Requiremen ts 4. QUALI

11、TY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection and Standard Quality Assurance Provisions. - Unless o-therwise specified herein or 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-D-98887 13 m 9979906 0325258 3 m MIL-D-48889 (PA) in t

12、he contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.2 Classification of Inspections. - The following types of inspections shall be conducted on t m M aeaed.eae* 000000 000000 .TtiSi. c c .- x mm al r O 1 al I Provided by IHSNot for Resale

13、No reproduction or networking permitted without license from IHS-,-,-ff oc oc oc 4 I c I - . MIL-D-LlBB87 13 M 7779706 0325264 7 o- hl F o- c c c - m S .- O ci L O I Q - U c m .- 8. QQ lC I *- X-U OS mr c m M m bp O 9 n .- I v) S m E Y L m o S .- L VI O VI O P E- u QJ IS al - -u-# rc O al o S h Prov

14、ided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-49 13 9799906 0325265 O -7 -_ T c Ir O - Li W X v) -m mm mm cc O0 n EL alo vi ma mvi O %O L 9)- C.C. no1 Pvi Em e .E .- I O p. al *- os ln -c Plu E OX o1 so -3 c .- rL U al c y. 4) O al K O c E OP u L

15、U aoP) mm- L .- 2 w-2 msP) u- vi -m OI I-tn nm m w0 so *- P vi mv- -0 E al wo CK *- P) m XW 20 a Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ MIL-D-LIBB9 13 9979906 032526b 2 n U C 0 0 pl O r e- m c v) O u O + I O I o. c c .- c s I: S O + c 7 E

16、E .- .- a c m c, e r i8 :m .i .- .- cc M MM M N* O0 si O0 . c E I Q- en c VI VI u .- (U en ip E8 U (U S c Q- (U o (U S O z - SEW .- J m mo ws c-o OSS voz *- o VIX L ms mu env) m 9. .- O 3 L O g Q- O aJ U S al W .- w - 11 Provided by IHSNot for ResaleNo reproduction or networking permitted without li

17、cense from IHS-,-,-c h. O c k r V) 0-l S m al v I Q) ci (F- c c a c Q (v ZE K O ci c f E E al c c c 8 2 al CI al c O U S .- 12 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-VI .$ w c 8 Li c W r v) O O u 2 2 .- ZI c, c Q) w n E c I O IL U S 3 O n i-

18、 n o O P - .e=- u .- uu!Jl - .- e- a-? co AO w O00 O 4-33 O . O00 c I o) P P E O I O 9) - e 8 c n S Q) Y c n n rn K u u .- Q) - n .- m Q) c c .- L O n 4) ci Q) c - In c E E o Y I c .- O 3 m L S O .- O u n h rc. O u S Q) U 7 w .- Provided by IHSNot for ResaleNo reproduction or networking permitted wi

19、thout license from IHS-,-,-MIL-D-48887 13 777770b 0325267 8 W r- c IL O h Y u m Q o) U m S I o) u c u a x O CI al m a m - c . O u W l- =c U m ccc . Mmm M . O00 c al c n .- o) al 4- In- o .- O CI O I 0: so) O 3 I o 0. rc O 9) u c al -0 .- W ,I Provided by IHSNot for ResaleNo reproduction or networkin

20、g permitted without license from IHS-,-,-MIL-D-48887 13 777770b 0325270 4 MIL-D-48889 (PA) 4.4.3 Testing 4.4.3.1 Moisture Content of Black Powder. (See 3.2) Major Defect A. The moisture content of the black powder shall be determined at the time of loading not less than once for each eight hours of

21、production, or portion thereof. Two grams of black powder shall be selected just prior to loading and the moisture content determined as specified in 4.5.1. Composite samples shall not be used in this deter- mination. If the moisture content exceeds the requirement specified, the black powder shall

22、be rejected. If this determination is made after loading has begun, components loaded therewith shall be rejected. 4.4.3.2 Burning Time of Delay Assembly - Detonator Assembl (see 8796352) Major Defect A - Eighty (80) delay -+ assem ly-detonator assemblies shall be selected from each lot for-test. Th

23、e test shall be performed as specified in 4.5.2. If two or more delay assemblies fail to comply with the applicable requirements, the lot shall be rejected. Any delay assembly whose delay time is lost due to equipment failure or error in procedure shall be replaced in order to determine if the lot c

24、omplies with the delay time requirements. 4.4.3.3 Heat Seal Test of Sealed Bag (see dwg. 9311219) Major A Defect. - Sampling, acceptance criteria and test pro- cedures for this test shall be as specified in Specification MIL-P-116. 4.4.4 Inspection equipment. - The inspection equipment required to p

25、erform the examinations and tests prescribed herein is described in the Paragraph Reference/Inspection Method column in the tables starting with paragraph 4.4.2.1. The con- tractor shall submit for approval inspection equipment designs in accordance with the terms of the contract. See Section 6 of M

26、IL-A-48078 and 6.2 herein. 4.5 Test Methods and Procedures. 4.5.1 Moisture Content of Black Powder. The moisture content of the black powder shall be determined as specified in Specification MIL-P-223. 4.5.2 Burning Time of Delay Assembly. - The delay assembly shall be tested for burning time using

27、methods and equipment in accordance with 4.4.4. 15 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MI L - D- 4 8 8 8 9 (PA) 5. PREPARATION FOR DELIVERY 5.1 Packa in . - The delay elements shall be packaged in accordance * wit dwg. 9311219. 5.2 Packin

28、g and Marking. - The delay elements shall be . packed and marked in accordance with dwg. 9311220. 6. NOTES _1 6.1 Ordering Data. - Procurement documents shall specify the following : a. b. c. Provisions of MIL-A-48078. Title, number and date of this specification. Provisions for submission of first

29、article samples. 6.2 Submission of Inspection Equipment Designs for Approval. - (see MIL-A-48078. Picatinny Arsenal, ATTN: SARPA-QA-T-T, Dover New Jersey 07801. data cards shall include the following: senal, ATTN: SARPA-QA-A-M, Dover, New Jersey, 07801 Submit equipment designs as required to Command

30、er, 6.3 Distribution of ammunition data cards. - Distribution of Commander, Picatinny Ar- Custodian : Ar my - PA Preparing Activity: Army-PA Project Number: 1345-A-0158 iU.S. GOVERNMENT PRINTING OFFICE: 1976- 603-7663583 16 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf
  • BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf
  • BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf
  • BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf
  • BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf
  • BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf
  • BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf
  • BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf
  • BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1